August 31, 2018

SUBJECT:

UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2018005)

Dear Mr. Dent:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Cooper Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Additionally, as reflected in the enclosure, in June 2019, the NRC staff will complete Temporary Instruction 2515/193, Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of Jr.

NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Jason W. Kozal, Chief Project Branch C

Division of Reactor Projects Docket No. 50-298 License No. DPR-46

Enclosure:

Inspection Plan

Cooper 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count CNS RI 2ND QUARTERLY REPORT

1 02/01/2018 08/14/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

EP EXERCISE INSPECTION

1 07/30/2018 08/03/2018 IP 71114.01 000716 Exercise Evaluation

07/30/2018 08/03/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

07/30/2018 08/03/2018 IP 71151 001397 Performance Indicator Verification SECURITY TEAM INSPECTION

1 08/20/2018 08/24/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

08/20/2018 08/24/2018 IP 71130.07 000739 Security Training INITIAL EXAM

1 08/26/2018 09/01/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

09/23/2018 09/29/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

INSERVICE INSPECTION RF30

1 10/08/2018 10/12/2018 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RAD SAFETY RFO 1,2

1 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

10/15/2018 10/19/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls CYBER SECURITY INSPECTION

1 02/11/2019 02/15/2019 IP 71130.10P 000741 Cyber Security

02/25/2019 03/01/2019 IP 71130.10P 000741 Cyber Security TRIENNIAL FIRE PROTECTION INSPECTION

1 04/15/2019 04/19/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

04/29/2019 05/03/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

EP PROGRAM INSPECTION

1 05/06/2019 05/10/2019 IP 71114.02 000717 Alert and Notification System Testing

05/06/2019 05/10/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

05/06/2019 05/10/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

05/06/2019 05/10/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 8/22/2018 7:55:49 AM Page 1 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Enclosure

Cooper 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count EP PROGRAM INSPECTION

1 05/06/2019 05/10/2019 IP 71151 001397 Performance Indicator Verification RP INSPECTION (1,3)

1 05/20/2019 05/24/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

05/20/2019 05/24/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Security Protective Strategy.05

1 05/20/2019 05/24/2019 IP 71130.05 000737 Protective Strategy Evaluation MAT'L CONTROL & ACCOUNTING

1 05/20/2019 05/24/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

RELIABLE HARDENED CONTAINMENT VENTS TI-193 (EA-13-109)

1 06/17/2019 06/20/2019 TI 2515/193 000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions BIENNIAL PI&R

1 06/24/2019 06/28/2019 IP 71152B 000747 Problem Identification and Resolution

07/08/2019 07/12/2019 IP 71152B 000747 Problem Identification and Resolution Security Access Control.02

1 08/05/2019 08/09/2019 IP 71130.02 000734 Access Control

08/05/2019 08/09/2019 IP 71151 001338 Performance Indicator Verification RP TEAM INSPECTION

1 08/19/2019 08/23/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation

08/19/2019 08/23/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

08/19/2019 08/23/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program

08/19/2019 08/23/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation BRQ

1 09/22/2019 09/28/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

8/22/2018 7:55:49 AM Page 2 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Cooper 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count COOPER 10CFR50.59 INSPECTION

1 09/30/2019 10/03/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments TI 2515/194

1 11/04/2019 11/08/2019 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

Cooper - Design Bases Assurance Inspection (Programs)

1 01/27/2020 01/31/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

02/10/2020 02/14/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

INITIAL EXAM 1

1 03/22/2020 03/28/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

04/26/2020 05/02/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RS24 Radiation Safety

1 04/27/2020 05/01/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls

04/27/2020 05/01/2020 IP 71124.04 000729 Occupational Dose Assessment EP Exercise and PI Inspection

1 05/04/2020 05/08/2020 IP 71114.01 000716 Exercise Evaluation

05/04/2020 05/08/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

05/04/2020 05/08/2020 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS

1 06/01/2020 06/05/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

06/22/2020 06/26/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 8/22/2018 7:55:49 AM Page 3 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

ML18234A085 SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: CHY/RDR Yes No Publicly Available Sensitive NRC-002 OFFICE C:DRP/C

NAME JKozal

SIGNATURE

/RA/