ML19093B334

From kanterella
Revision as of 03:34, 16 August 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Request for Amendment to Operating Licenses DPR-32 & DPR-37 for Technical Specification Change No. 31
ML19093B334
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/17/1975
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Goller K
Office of Nuclear Reactor Regulation
References
Download: ML19093B334 (11)


Text

V, r '. 1 ' '. :, ' .

  • e Vepco _ . Purauat* to 10 Cft 50~90, tu Viritaia Electric and Powr**calipau:, hereby_ raquaate aa ... ndlllent to the O"rating Lic*na***DPR-l2 and D!:B.-37*

for the Surry Powar Station,*

Unit Jc,e. 1 ud *2.

  • The aitenclmnt raqua*ted ia a cbaqe. to the Teclmice.1 Specificattoim
  • . The chana** to be made. r_n.d .
  • the basie thereof are eneloaed hernitb and have-bee!1 dilai*snated aa Chang* * .N~ n. . , . . the ~han~e ra,.-..~ad 1:8 reatricte4 to a ref~~tt~I . of aect~n TS 4.13 for purpo*** of illproved*

continuity

~nd

  • readability and
  • no chanau in technical aubetance.ara
la'YOlved, it -ie Ullderatood, 011 th** b-.1ia of 41acuaion*

between our rupectf.ve*ai:affa, that DOn"."*ubatanti"l'a . 'changaa 1G Tech~~al Specificatioua, aucb u .thi* refonaattina of Jection TS 4. ll, atill require a regular nc ren* and* approval in the form of a

  • Lieeue AMncbllant*~

Accord1ns].y, th~ . aul>~aaion ia *de *... _ * ' . -Thia propondTeclm1.cal*Spec1fic:at1on Chana* baa. bNu*reviaved by both the Station am S:,*t* Nuclear -Safety and Operating.

Coaaittau.

  • further. it .bu ba11n detemi.Md that the propoNli
  • change doea not tn:wlve . ' . _ a *ignificant haurde
  • conaideration or an *unrffiewed aafety 4ueation ** defined 1n 10 cn*so.s,, . *v~ truly your*, . '6.21Y?. J~y/ _ C~ M. Stalling*

Vice President-Power Supply . *and Production Operat:1cnu.-

Eucl.oaure cc1 Mr *. Noman c. MoHley, Director J * -Office*of Inapection

& Enforce118Dt llagton It U.S. Nuclear 1te1ulatory Comdeaion 230 tuchtree str .. t, NW . Atlanta, Geor&1a.

  • 30303 ,*

. . *1 *-:~ ' ~.,..--. ; . *:"'; * ~SEAL) Attest: *. * * * *. * . II. t1; 74.-:D ' . . CO~NWEALTH OF VIRGINIA ) .. . ) -S.f?*~ 'CITY *ov RICHMOND . ) .. -,: ':.:*;' . **. Before -me * .' P..ober~ W ., :oiney, . a I;otary Public, ~*and for the City

  • and Commonwealth aforooaid*

on* this 17t:h .dJ,lY of .July 1975,* peraonally

.. :*-. appeared C. :i{.,* Stilling*

and D. *A *. ijillsman, J,:.,-_ who .ba'ing* duly sworn/:.*

  • . mai:,.e oath. and* said ( 1) that. they nre Vice . President*

..; Power . Supply and * *. . * .. * *Product~ori Operations and Assistant

~ecret{'try," reapectively~

of the Virginia ElectJ"ic.

and* P(?WeJ: Company, (2) tlult they are dw.y autbQrizoo to ae) cu~e. . *. *._. : ... ~nd fil't1. the *foregoing*

Amendment' in behalf of ~hat Company, an~. (3 . that the statements in. the Ame~dment.

  • .tire.: true tcf the <'beat of .the~r: knowledge

.. -~,;_:***d belief.* i': :* :/* ,. .. :, -*.-.:.*.:*

,:-"'< ;*-:::": .. * *. >*_ "* .:: .. *. *.

  • _ _.. . ;._:*** *.. . ; Givsn *under-ii1Y hand and :notarial sul thlls 17th ,day. 9f* . .July~ 1975_. ** ' . . '.** ,, ' ' ' . . My 'co'triiiission

~ires Augus{ 27 ~. i978 *. *. . ' . : ~-.. * .. \ .. \ ' ' .. ," . *: .. ,* ' . .'* .. *.--. .-*.. -*. . '. ' : -.-.'. : . --: . ~* .. * ,. .. _, *. :, .'(SEAL). . .,. ' -' .... . Robert W. Olney * .* *

  • Notary Publi¢ . .. .' . "". :-.. -

UL.l.L~L1VL, L'CV * ..J J. TS 4.13-1 4.13 NONRADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM Applicability The nonradiological environmental monitoring program applies to the monitoring of the temperature-salinity distribution and the biological variables in the 10-mile segment of the James River Estuary centered at Hog Island. Objective The objective of the program is to determine (1) the relationship between the thermal discharge and the physical-chemical characteristics of the water mass within the 10-mile tidal segment of the James River; (2) the planktonic 9 nektonic, and benthic characteristics of this segment; and (3) the effects of the operation of the Surry Power Station on the physical, chemical, and biological variables of the James River Estuary. Specification A. A monitoring program shall be conducted to determine the relationship between the thermal discharge and the physical-chemical characteristics of the water mass within the 10-mile tidal segment centered at Hog Island. 1. The monitoring program shall encompass the segment of the James River Estuary which extends from below the intake of the Surry CHANGE NO. 31 TS 4 .13-2 Power Station upstream to the southern shore of Jamestown Island as shown on TS Figure 4.13-1. 2. Temperature shall be continuously monitored and recorded at monitoring stations located throughout the estuarin*e segment approximately as shown in TS Figure 4. 13-1. Near-surface and/or *Jottom temperatures shall be monitored as indicated on TS Figure 4 .13-1. 3. The horizontal and vertical salinity structure of the tidal ment shall be determined at monthly intervals as follows: Cruises shall be conducted at slack before flood tide. A four (4) station transect shall be established between the intake structure and Skiffes Creek just before low slack water. Temperature and salinity data shall be collected at two (2) meter intervals from surface to bottom. The cruise shall continue up the channel with same slack stations established at approximately two (2) mile intervals.

The second transect shall be made near the upper limits of the segment, the exact location of which shall be based upon the salinity regime of the system. The approximate locations of the sampling stations and the cruise route are shown on TS Figure 4.13-1. 4. Mid-depth temperature and salinity shall be continuously monitored and recorded at the intake of the Surry Power Station. CHANGE NO. 31

' l \..Jl.Ul.l'iUT..-, J..'iV .---:;:rr TS 4.13-3 5. Mid-depth temperature shall be continuously monitored and recorded in the discharge canal. 6. The freshwater discharge at the Richmond gaging stations shall be recorded as a daily average and the corresponding input for Hog Island calculated.

7. If chlorine is used in the condenser-cooling system, chlorine demand in the intake canal shall be monitored.

The chlorination schedule shall be based on plant operating data rather than on a fixed time basis. During chlorination, chlorine shall be monitored at the end of the discharge groin by use of analytical methods that are sensitive to chlorine at concentrations much less than the concentration required for control and that will differentiate among the various chlorine containing compounds which constitute the residual chlorine.

The concentration of residual chlorine at the point of discharge to the James River shall not be greater than 0.1 mg/liter.

8. Records shall be kept of chemical releases to the cooling water system and a summary of this data shall be included in the annual reports described in 4.13 D. B. A biological monitoring program that is closely related to the phy~ical and chemical monitoring programs shall be conducted to determine the planktonic, nektonic, and benthic characteristics of the tidal segment CHANGE NO. 31 TS 4 .13-4 centered at Hog Island and to determine biological changes that occur as a result of the operation of the Surry Power Station. 1. Plankton -Water samples for plankton analyses shall be collected at each of six (6) stations asindicated in TS Figure 4.13-2. Samples shall also be collected in the intake and discharge canals. a. Phytoplankton samples shall be analyzed quantitatively in terms of sample volume to determine both the dominant genera of the community and the chlorophyll "a" content. The samples shall be taken at monthly intervals.
b. Zooplankton samples shall be analyzed quantatively in terms of sample volume to determine generic composition, life history stage and, where possible, species. The sampling interval shall be approximately monthly, taking into sideration life-history information about important species in the area which have planktonic stages in their life histories.
2. Attached Benthic Community

-Fouling plates that are 125-by 75-mm asbestos boards shall be suspended 1 m above the bottom at the instrument tower locations shown in TS Figure 4.13-2. Two vertical and two horizontal plates shall be suspended at each indicated location.

One of each pair shall be removed and placed at quarterly intervals; the other pair shall be left in CHANGE NO. 31

3. 4. tit TS 4.13-5 place for one year before being removed and replaced.

The benthic communities attached to the plates shall be analyzed for species composition and diversity.

Epibenthos

-Replicate benthic grab samples shall be collected at the stations shown in TS Figure 4.13-2. Collection shall be :nade on a quarterly basis, except dur1ng June, July and August when they shall be made monthly. Population characteristics such as species composition, diversity, evenness, redundancy and richness shall be determined.

The data shall be analyzed to detect changes in specific components of the epibenthic COITill1unity including the brackish water clam Ran&ia cuneata and blue crab Callinectes sapidus. Nekton -The nektonic species of organisms present in the tidal segment shown in TS Figure 4.13-2 shall be qualitatively and quantitatively sampled by seining or trawling at the indicated locations in the estuarine segment. Samples shall be collected at monthly intervals except during periods of active or passive migrations, sampling at three selected station shall be often enough to establish relative population levels. These sampling intervals shall be based on life history distribution information that indicates when species of special interest are likely to be in or passing through this segment of the estuary. The species of special interest shall include Anchovy, Atlantic Menhaden, Blueback Herring, Channel Catfish, Atlantic Croaker, Spot, Striped CHANGE NO. 31

5. TS 4.13-6 Bass, and White Perch. The samples shall be analyzed for species composition, size and life history stages. Planktonic organisms, such as fish eggs, larvae and invertebrate larvae (both meroplanktonic and holoplanktonic), and post-larval and juvenile fish, or the motile food organisms (such as shrimp) JU which these young fish feed, shall 0 be sampled periodically in_ the intake and discharge canals, at locations within the thermal plume, and in a control area outside the thermal plume. The sulting data shall be analyzed to determine the cooling system passage and entrainment effects of station operation and a summary included in the semi-annual reports described in 4.13 D. C. The programs described in Specifications A and B shall commence on the day Unit No. 1 is licensed to operate. Where installation of monitoring stations and/or purchase of equipment is necessary and/or involves authorization by other agencies, the affected portion of the program shall be implemented at the earliest practicable time, but not later than December 31, 1972. D. The data obtained from the programs defined in Specifications A and B shall be analyzed as they are collected and shall be compared with model and analytical predictions and with preoperational data. A report of the results of this evaluation shall be forwarded to the Directorate of Licensing (DL) at the end of each six month period or fraction thereof terminating on June 30 and December 31. Such reports are due within 60 CHANGE NO. 31

,* VlHlL't\.JLI 1-.v

  • JJ. TS 4.13-7 days after the end of each reporting period and shall be submitted with the Routine Operating Report described in Technical Specification 6.6. A final report summarizing the results of the program shall be submitted sixty (60) days following the third anniversary of the date Unit No. 2 is licensed to operate. If on the basis of such semi-annual and final reports it is established that no major adverse environmental impact has resuJ>:ed or is likely to result from contihued operation of Unit Nos. 1 and 2 then the program shall be terminated.

Otherwise it shall continue until a semiannual report does establish that no impact has resulted or is likely to result. If on the basis of any semiannual report or the final report it is established that the results of the monitoring program are inconclusive, either whole or in part, the licensee shall propose reasonable changes to the program designed to yield conclusive results and implement such changes when they are approved by DL. E. Fish killed _on the traveling screens at the station or by operating effects of the Surry Power Station shall be identified by species, size, and quantity, and the data shall be recorded in tabular form. These data shall be transmitted to DL semiannually.

Significant talities of fish that may be related to operation of the station shall be reported to Region II, Directorate of Regulatory Operations within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Data concerning significant fish mortalities and the probable cause shall be included in a more detailed report to DL within 10 days. CHANGE NO. 31

' TS 4.13-8 Basis Excess temperature distributions and alteration of density flows in the tidal segment have been predicted from data developed from model studies for unit operation.

Surface isotherms for wind conditions of 5 MPH have been plotted for different stages in the tidal cycle. The data collected under Specification A will permit an evaluation of the predictions and provide the basis for describing the parameters which may have environmental significance.

The surface and bottom records combined with profile data will also permit cross-sectional as well as longitudinal physical-chemical evaluations to be made of the tidal segment, The tidal segment encompassing the Surry site is in the vicinity of the mean transition zone between fresh and saltwater.

During periods when the water inflow, as measured at the head of the coastal physiographic province exceeds approxima_tely 12,000 cfs for an extended period, the water in the reach is fresh. At lower flows, the water becomes brackish and during extreme drought conditions the salinity on the discharge side of the point may reach 11 ppt. Since it is not feasible to take direct measurements of fresh water inflow, calculational methods will be used to predict the flow from data which is available at gaging stations.

The condenser is cleaned by a mechanical system and it is expected that it will not be necessary to use chlorine to maintain condenser cleanliness.

In the remote event it becomes necessary to utilize chlorine, its use will be regulated by need as demonstrated by a change in operating parameters.

Re-CHANGE NO. 31 CHANGE NO. 31 * .... .-w *

  • _.\. TS 4 .13-9 sidual chlorine will be monitored at the point of discharge to the James River and shall not exceed 0.1 mg/liter.

This concentration should have no effect on river organisms.

The post-operational non-radiological monitoring program is designed to evaluate biological populations in which the species and number of individuals present at a given time is influenced by: 1. Seasonal and natural distribution patterns 2. Salinity as influenced by freshwater inflow 3. Ecological "salinity gradient zone" characteristics

4. Geological "turbidity maximum" zone influence.

The high level of natural statistical associated variation characteristics of samples collected from the segment influence the confidence limits that can be assigned to population parameters.

The nonradiological environmental monitoring will maximize effort in these areas most likely to measure the effects of station operation on the tidal segment. The data collected under this program will be discussed with the appropriate State and Federal Agencies having regulatory authority in the area. CHANGE NO. 31