Issue date | Title | Topic | |
---|---|---|---|
ML23286A037 | 13 October 2023 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Shutdown Margin Pressure Boundary Leakage Power change Unidentified leakage |
ML23153A173 | 16 June 2023 | Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement | Surveillance Frequency Control Program Pressure Boundary Leakage |
ML22322A198 | 18 November 2022 | Proposed License Amendment Request Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications Marked-up Technical Specifications Basis Page | |
ML22278A169 | 5 October 2022 | Annual Submittal of Technical Bases Changes Pursuant to Technical Specification 6.4.J | |
ML22095A107 | 11 July 2022 | Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD | |
ML22131A310 | 11 May 2022 | Proposed License Amendment Request Addition of Alternate Control Rod Position Monitoring Requirements | Boric Acid Shutdown Margin Surveillance Frequency Control Program Power change |
ML21294A338 | 21 October 2021 | Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . | Fuel cladding |
ML21279A289 | 4 October 2021 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Hydrostatic |
ML20304A159 | 12 October 2020 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Reserve Station Service Transformer |
ML19309D196 | 30 October 2019 | Proposed License Amendment Request Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) | Shutdown Margin Coatings Fuel cladding |
ML19297D147 | 14 October 2019 | Annual Submittal of Technical Specifications (TS) Bases Changes Pursuant to TS 6.4.J | Reserve Station Service Transformer Surveillance Frequency Control Program Open Phase Condition Power change |
ML19269B775 | 19 September 2019 | Proposed License Amendment Request: Update of Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures for Subsequent License Renewal | Anticipated operational occurrence Hydrostatic License Renewal Subsequent License Renewal |
ML18289A396 | 11 October 2018 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Reserve Station Service Transformer Open Phase Condition |
ML17317A464 | 7 November 2017 | Proposed License Amendment Request, Temporary, One Time 21-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C and Associated Cabling | Safe Shutdown Anticipated operational occurrence Reserve Station Service Transformer Offsite Circuit |
ML17293A028 | 16 October 2017 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Surveillance Frequency Control Program |
ML17150A302 | 23 May 2017 | Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 | Safe Shutdown Reserve Station Service Transformer Surveillance Frequency Control Program Open Phase Condition |
ML16134A069 | 10 May 2016 | Proposed License Amendment Request for Expansion of Primary Grade Water Lockout Requirements in TS 3.2.E | Shutdown Margin |
ML15293A496 | 7 October 2015 | Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 6.4.J | Shutdown Margin |
ML13280A311 | 30 September 2013 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Non-Destructive Examination |
ML11297A119 | 13 October 2011 | Submittal of Annual Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Shutdown Margin Anticipated operational occurrence Hydrostatic Fuel cladding Pressure Boundary Leakage |
ML102990423 | 13 October 2010 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Shutdown Margin |
ML100900391 | 30 March 2010 | Proposed License Amendment Request Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirement to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Incorporated by reference Tornado Generated Missile Significance Determination Process Surveillance Frequency Control Program Large early release frequency Maintenance Rule Program Pressure Boundary Leakage Offsite Circuit Power change |
ML092800358 | 30 September 2009 | Proposed License Amendment Request One-time Alternate Repair Criteria for Steam Generator Tube Inspection/Repair for Units 1 & 2 | Pressure Boundary Leakage |
ML092150464 | 28 July 2009 | Proposed License Amendment Request Permanent Alternate Repair Criteria for Steam Generator Tube Repair | Nondestructive Examination Pressure Boundary Leakage Unidentified leakage Affidavit |
ML090700552 | 17 February 2009 | Page Correction for Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | |
ML082890529 | 9 October 2008 | Proposed License Amendment Request, Removal of Main Control Room Bottled Air System Requirements | Safe Shutdown Shutdown Margin Fire Barrier Probabilistic Risk Assessment Earthquake Fire Protection Program |
ML082900494 | 2 October 2008 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Safe Shutdown Shutdown Margin Reserve Station Service Transformer |
ML072850909 | 11 October 2007 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Non-Destructive Examination Missed surveillance Pressure Boundary Leakage |
ML072681171 | 25 September 2007 | Proposed Technical Specifications Change Supplement Re Operable Definition Modification for Air Handling Units While in Temporary 45-Day Allowed Outage Times | Probabilistic Risk Assessment |
ML072681096 | 19 September 2007 | Proposed Technical Specifications Change Revised Setting Limits and Overtemperature T/Overpower at T Time Constants. | Hydrostatic GOTHIC |
ML070960037 | 5 April 2007 | Proposed Technical Specifications Change Re Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping | Safe Shutdown High winds Design basis earthquake |
ML070930371 | 2 April 2007 | Technical Specifications Pages Re Main Control Room and Emergency Switchgear Room Air Conditioning System | Fire Protection Program |
ML070650524 | 26 February 2007 | Proposed Technical Specifications Change Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water Piping | Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment Reserve Station Service Transformer Significance Determination Process Large early release frequency Maintenance Rule Program |
ML062830170 | 9 October 2006 | Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Tornado Missile Hydrostatic Liquid penetrant Power change |
ML060050026 | 3 January 2006 | Technical Specification Pages Reactor Coolant System Pressure and Temperature Limits | Hydrostatic |
ML052000154 | 15 July 2005 | TS, Amd MC5034, Relocation of Inservice Inspection and Testing Requirements | Nondestructive Examination VT-2 Process Control Program Liquid penetrant |
ML051590287 | 31 May 2005 | Technical Specifications Bases Changes Revision of References for Offsite Dose Limits | |
ML043090578 | 4 November 2004 | Proposed Technical Specifications Change Request Relocation of Inservice Inspection and Testing Requirements | Nondestructive Examination VT-2 Process Control Program Liquid penetrant |
ML042600296 | 15 September 2004 | Proposed Technical Specifications Change Administrative Controls Changes, Attachment 2, Mark-Up of Technical Specifications. | High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Fuel cladding Fire Protection Program |
ML042600290 | 15 September 2004 | Proposed Technical Specifications Change Administrative Controls Changes | |
ML042440169 | 30 August 2004 | Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement Process | Incorporated by reference |
ML023470135 | 10 December 2002 | Tech Spec Pages for Amendments 232 and 232 Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles | |
ML023180242 | 5 November 2002 | Proposed Technical Specification Change, Deletion of Monthly Analog Rod Position Test | Shutdown Margin |
ML023180240 | 5 November 2002 | Proposed Technical Specification Change Deletion of Fifteen Minute Degassed Beta & Gamma Activity Test & Semiannual Dose Equivalent I-131 Analysis | Boric Acid Anticipated operational occurrence Power change |
ML020720367 | 8 March 2002 | Technical Specification Pages, Amendments 230 & 230 for Surry, Units 1 & 2 | Shutdown Margin |
ML020510009 | 8 February 2002 | Technical Specification Basis Change, Alternate Source Term Implementation | |
ML060040272 | 23 August 1999 | Technical Specifications Basis Change - Delete Tables for Reactor Vessel Toughness Data | |
ML19094A409 | 26 October 1977 | Technical Assistance Request - Environmental Technical Specification Changes | |
ML19093B334 | 17 July 1975 | Request for Amendment to Operating Licenses DPR-32 & DPR-37 for Technical Specification Change No. 31 | Grab sample |
ML19094A226 | 17 March 1972 | Technical Specifications | Boric Acid Shutdown Margin High Radiation Area Non-Destructive Examination Grab sample Tornado Missile Hydrostatic Reserve Station Service Transformer Design basis earthquake Earthquake Fuel cladding Liquid penetrant Dissimilar Metal Weld |