Revised Monthly Operating Rept for Oct 1979
ML19210C397
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/02/1979
From: Ballinger P
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML19210C391 List:
References
NUDOCS 7911140175
Download: ML19210C397 (1)


Text

~-~_.OPERATING DATA REPORT DOCKET NO. 050-0298 DATE November 2, 1979 COMPLETED BY P.

L.Ballinger TELEPHONE'n'o'*'R11 OPERATING STATUS

        • ^"a" N"*'a'" C"'**"" 1. Unit Name:
2. Reporting Period: October 1479 2381 3. Licensed Thermal Power (MWt): ' 836
4. Nameplate Rating (Gross MWe):

*5. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):

787 764 7. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Shee List Report. Give Reasons:

None 9. Power LeselTo Which Restricted,If Any (Net MWe):

None 10. Reasons For Restrictions,if Any:

This Month Yr..to-Date Cumulatise

11. Hours In Reporting Period 745.0 7.296.0 46.777.0.745.0 6,457.3 , 39,912.2 12. Number Of Hours ReactorWas ritical
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 745.0 6.357.2 14. Hours Generator On-Line

_39,160.4 0.0 0.0 0.0 15. Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (MWH) 1.619,208.0 12.991,656.0 73,'.15.814.0
17. Gross Electrical En .rgy Generated (MWH) 540,400.0 ,_, 4,258.464.0 23,616,350.0 521,808.0 4,105,060.0 22.768.399.0
18. Net Electrical Energy Generated (MWH)
19. Unit Senice Factor 100.0 87.1 g3,7 100.0 87.1 83.7 20. Unit Availability Factor
21. Unit Capacity Factor (Usirig MDCNet) 91.7 73.6 63.7 90.0 72.3 62.6 22. Unit Capacity Factor (Using DER Net) 0.0 2.4 4.4 23. Unit Forced Outage Rate

--" 24. Shutdow11s Scheduled Ovef Next 6 Months (Type. Date.and Duration of Each t:

Refueline and Maintenance, March 15, 1980, 6 weeks

25. If Sht.t Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved.INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION

}')17[po n.7911140--