Text
~-
~
OPERATING DATA REPORT DOCKET NO. 050-0298 DATE November 2, 1979 COMPLETED BY P.
L.
Ballinger TELEPHONE
'n' o'* 'R11 OPERATING STATUS
- ^"a" N"*'a'"
C"'**""
- 1. Unit Name:
- 2. Reporting Period: October 1479 2381
- 3. Licensed Thermal Power (MWt): ' 836
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
787 764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Shee List Report. Give Reasons:
None
- 9. Power LeselTo Which Restricted,If Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
This Month Yr..to-Date Cumulatise
- 11. Hours In Reporting Period 745.0 7.296.0 46.777.0 745.0 6,457.3 39,912.2
- 12. Number Of Hours ReactorWas ritical
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 745.0 6.357.2
- 14. Hours Generator On-Line 39,160.4 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1.619,208.0 12.991,656.0 73,'.15.814.0
- 17. Gross Electrical En.rgy Generated (MWH) 540,400.0,_,
4,258.464.0 23,616,350.0 521,808.0 4,105,060.0 22.768.399.0
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Senice Factor 100.0 87.1 g3,7 100.0 87.1 83.7
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Usirig MDCNet) 91.7 73.6 63.7 90.0 72.3 62.6
- 22. Unit Capacity Factor (Using DER Net) 0.0 2.4 4.4
- 23. Unit Forced Outage Rate
- 24. Shutdow11s Scheduled Ovef Next 6 Months (Type. Date.and Duration of Each t:
Refueline and Maintenance, March 15, 1980, 6 weeks
- 25. If Sht.t Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION
}')
17[
po n 7911140
-