NRC Annual Assessment Meeting
ML061240414
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/02/2006
From:
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML061240414 (6)


Text

NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station May 2, 2006 2Davis-BesseNuclear Power Station Participants Mark Bezilla

-S ite Vice President Barry Allen -

Director, Site Operations Bob Schrauder

-D irector, Performance Improvement 3Davis-BesseNuclear Power Station 2005 Accomplishments Safe, reliable and eventless operation Union Negotiations (Local 245) Replenishment (hiring for select needs

-e.g., Maintenance/Engineering/Operations) Steam Generator Inspection/Midcycle O utage Technical Programs INPO Accreditation Renewal NRC/F E M A Eval uated Emergency P l an E x erci se 2005 Licensed Operator Candidate Exams INPO Evaluation and Assessment Operator Programs INPO Accreditation Renewal Confirmatory O r der independent Assessments (O perations, Engineering, CAP, SC/SCWE) Cycle 14 Operational Improvement Activities Security Force on Force Inspection 2005-2007 Business Plan 14 th Refueling O u tage Preps Backlog Reduction -

P M /CM/Elective Ma intenance/Procedure Change Requests/Condition Report Evaluations and actions/o ther miscellaneous items -

(to ward s t eady state values) 4Davis-BesseNuclear Power Station 14 th Refueling Outage Outage Key Activities

-RCP (2-1 , 2-2) R e plac emen t -Core Reload (new fuel design)

-Steam Generator Inspections

-Reactor Vessel Head & Bottom Inspection

-Turbine Low Pressure Rotor Replacement

-Service Water System Improvements

-CAC/SW Water Hammer Issue Reso lution-Small Bore Piping Suppor t Impr ovements-EDG Voltage Regulator ReplacementChallenges

-RCP 2-1, 2-2 overhaul

-Overlay weld on RCP 1-1 cold leg drain line 5Davis-BesseNuclear Power Station Safe, secure, reliable, and eventless operation Operations Programs INPO Accreditation Renewal (January) 14 th Refueling Outage (March/April) Emergency Preparedness Drills Backlog Reductions

-Achieve steady state values INPO Mid-Cycle Evaluation (October) Confirmatory Order Independent Assessments

-Operations Perfor mance (June)

-Corrective Action Program Implementation (August)

-Engineering Programs (S eptember)-Safety Culture/Safety Consciou s Work Environment (November

) Workforce Replenishment Human Performance Initiatives 15 th Refueling Outage Preparation (Spring 2008) 2006-2010 Bus i ness Plan Activities 2006 Key Focus Areas 6Davis-BesseNuclear Power Station Looking Forward Safe Plant Operations Reliable Plant Operations Cost-Effective Plant Operations Through effective use of People, Processes and Procedures