8/31/06 Dresden - Mid-Cycle Performance Review and Inspection Plan
ML062430333
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/31/2006
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML062430333 (7)


Text

August 31, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer

Exelon Nuclear

Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DRESDEN NUCLEAR POWER STATION

Dear Mr. Crane:

On August 7, 2006, the NRC staff completed its performance review of the Dresden Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff

reviewed performance indicators (PIs) for the most recent quarter and inspection results over

the previous 12 months. The purpose of this lette r is to inform you of our assessment of yoursafety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in

Accordance with 10 CFR 2.390" will include the physical protection review and a resultant

inspection plan.

Plant performance for the most recent quarter at Dresden Units 2 and 3 was within the Licensee Response Column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on performing inspection

procedure 71004, "Power Uprate," to inspect activities related to the steam dryer replacement

on Unit 3 during the fall 2006 refueling outage and plan to perform the same inspection

procedure during the proposed Unit 2 refueling outage in the fall 2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution

of any scheduling conflicts and personnel availabilit y issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

In addition, the resident inspectors plan to perform Temporary Instruction 2515/169, "Mitigating

Systems Performance Index Verification," pr ior to the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If circumstances arise which cause us to c hange the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,/RA/Mark A. Ring, Chief Reactor Projects Branch 1

Division of Reactor Projects Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan DISTRIBUTION:

See next page C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If circumstances arise which cause us to c hange the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,/RA/Mark A. Ring, Chief Reactor Projects Branch 1

Division of Reactor Projects Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan DISTRIBUTION:

See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\dresden\Dresden MOC Letter 2006.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIERIIIRIIIRIIINAMEMRing:slsDATE08/16/2006 OFFICIAL RECORD COPY C. Crane-3-cc w/encl:Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager

Regulatory Assurance Manager - Dresden

Chief Operating Officer

Senior Vice President - Nuclear Services

Senior Vice President - Mid-West Regional

Operating Group

Vice President - Mid-West Operations Support

Vice President - Licensing and Regulatory Affairs

Director Licensing - Mid-West Regional

Operating Group

Manager Licensing - Dresden and Quad Cities

Senior Counsel, Nuclear, Mid-West Regional

Operating Group

Document Control Desk - Licensing

Assistant Attorney General

Illinois Emergency Management Agency

State Liaison Officer

Chairman, Illinois Commerce Commission

Will County Executive

Will County Sheriff Director, Will County Emergency

Management Agency Mayor of Joliet

City Manager of Joliet

Kendall County Board Chairman

Kendall County Sheriff

Grundy County Board Chairman

Grundy County Sheriff

Grundy County Emergency Management Agency

Mayor of Morris Minooka Village President

Mayor of Coal City

Mayor of Carbon Hill

Mayor of Diamond

Mayor of Braidwood

Mayor of Wilmington

Channahon Village President Channahon Village Administrator

Mayor of Shorewood Shorewood Village Administrator

Mayor of Elwood

INPO C. Crane ADAMS Distribution:

DXC1 TEB MXB RidsNrrDirslpab

JLC1 GEG KGO RML2 SRI Dresden

DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Dresden Inspection / Activity Plan 09/01/2006

-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 12:57:48 Report 22 2 71004-POWER UPRATE Other Routine 04/01/2006 12/31/2006 2, 3 71004 IP Power Uprate 2 MOD5059-MODIFICATION/50.59 INSPECTION Baseline Inspections 09/18/2006 10/06/2006 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/18/2006 10/06/2006 2, 3 7111117B IP Permanent Plant Modifications 2 TI-2515/169 MSPI VERIFICATION Safety Issues 10/01/2006 12/31/2006 2, 3 2515/169 IP Mitigating Systems Performance Index Verification 1 ISI-ISI BASELINE INSPECTION Baseline Inspections 11/13/2006 11/17/2006 2, 3 7111108G IP Inservice Inspection Activities - BWR 1 7112102-ALARA OUTAGE INSP Baseline Inspections 11/13/2006 11/17/2006 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 11/13/2006 11/17/2006 2, 3 7112102 IP A LARA Planning and Controls 1 ISFSI-ISFSI INSPECTION Other Routine 11/15/2006 12/15/2006 2, 3 60854 IP Preoperational Testing Of An ISFSI Other Routine 11/15/2006 12/15/2006 2, 3 60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 4 ISFSI-ISFSI INSPECTION Other Routine 01/01/2007 03/31/2007 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 71122.02-TRANSPORTATION AND RADWASTE Baseline Inspections 01/08/2007 01/12/2007 2, 3 7112202 IP Radioactive Material Processing and Transportation 1 MAINT EF-MAINTENANCE EFFECTIVENESS Baseline Inspections 02/26/2007 03/02/2007 2, 3 7111112B IP Maintenance Effectiveness 1 71122.01-RADIOLOGICAL EFFLUENTS Baseline Inspections 03/05/2007 03/09/2007 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 03/05/2007 03/09/2007 2, 3 71151 IP Performance Indicator Verification 1 7111401-EP EXERCISE & PI INSP Baseline Inspections 03/19/2007 03/23/2007 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/19/2007 03/23/2007 2, 3 71151 IP Performance Indicator Verification 3 FY 2007-DRESDEN INIT PREP 04/2007 Not Applicable 04/02/2007 04/06/2007 2 W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 5 CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/16/2007 05/25/2007 2, 3 7111121 IP Component Design Bases Inspection 3 FY 2007-DRESDEN INIT EXAM 04&05/2007 Not Applicable 04/23/2007 05/04/2007 2 W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 1 71121.01-RADIOLOGICAL ACCESS CONTROL Baseline Inspections 06/25/2007 06/29/2007 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Dresden Inspection / Activity Plan 09/01/2006

-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 12:57:48 Report 22 1 71121.01-RADIOLOGICAL ACCESS CONTROL Baseline Inspections 06/25/2007 06/29/2007 2, 3 71151 IP Performance Indicator Verification 1 71121.02-ALARA PROGRAM Baseline Inspections 10/29/2007 11/02/2007 2, 3 7112102 IP A LARA Planning and Controls Baseline Inspections 10/29/2007 11/02/2007 2, 3 71151 IP Performance Indicator Verification 1 ISI-ISI BASELINE INSPECTION Baseline Inspections 11/05/2007 11/09/2007 2 7111108G IP Inservice Inspection Activities - BWR 1 71121.03-INSTRUMENTATION & SCBA Baseline Inspections 02/11/2008 02/15/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 3 FPI-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/03/2008 03/21/2008 2, 3 7111105T IP Fire Protection [Triennial]

1 HEATSINK-HEAT SINK INSPECTION Baseline Inspections 03/24/2008 03/28/2008 2, 3 7111107B IP Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.