ML092400137

From kanterella
Revision as of 19:04, 11 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
09/01/2009 Diablo Canyon 2009 Midcycle Assessment
ML092400137
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/01/2009
From: Vincent Gaddy
NRC/RGN-IV/DRP/RPB-B
To: Conway J
Pacific Gas & Electric Co
References
Download: ML092400137 (6)


Text

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125September 1, 2009 John T. Conway, Senior Vice President &

Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3

Mail Code 104/6/601 Avila Beach, CA 93424

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DIABLO CANYON POWER PLANT

Dear Mr. Conway:

On August 4, 2009, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Diablo Canyon Power Plant, Units 1 and 2, was within the Licensee Response column of the NRC

=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). In addition to baseline inspections, we also plan on implementing Inspection Procedure 71007, "Reactor Vessel Head Replacement Inspection," for Unit 2.

In the 2008 annual assessment letter, dated March 4, 2009, the NRC identified a crosscutting theme associated with the corrective action program component of the problem identification and resolution area related to the failure of site personnel to thoroughly evaluate problems [P.1.(c)]. At the time, the NRC did not identify a substantive crosscutting issue because this theme represented a recent performance trend. Once identified, you placed this issue into your corrective action program and began developing actions to address this issue.

During the current 12-month assessment period, the staff identified more than four Green findings with documented crosscutting aspects in the area of problem identification and resolution associated with the same theme related to the failure of site personnel to thoroughly

evaluate problems [P.1.(c)]. Specifically, seven findings with this crosscutting theme were identified during this current assessment period. Although some of these findings were documented in the last quarter of the assessment period, only one was related to an inadequate evaluation that originated in the last quarter of the assessment period. Since the number of Pacific Gas and Electric Company

findings with this crosscutting theme continued to decrease during the assessment period, it appears that the corrective actions you have implemented have begun to show some improvement. As such, we have determined that a substantive crosscutting issue does not exist at this time. We will continue to monitor the progress of your corrective action through the baseline inspection program over the assessment period.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. We are also evaluating potential changes to the inspection program in the radiation safety co rnerstone. Consequently, some specific inspection procedures and the inspection schedule may be revised for 2010.

In accordance with 10 CFR 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ Vincent Gaddy, Chief Reactor Projects Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80; DPR-82

Enclosure:

Diablo Canyon Inspection/Activity Plan

Pacific Gas and Electric Company

cc w/

Enclosure:

Sierra Club San Lucia Chapter

ATTN: Andrew Christie P.O. Box 15755

San Luis Obispo, CA 93406

Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164

Pismo Beach, CA 93448 Chairman San Luis Obispo County

Board of Supervisors

1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408

Truman Burns\Robert Kinosian California Public Utilities Commission

505 Van Ness Ave., Rm. 4102

San Francisco, CA 94102 Diablo Canyon Independent Safety

Committee Attn: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940

Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Chief, Technological Hazards Branch FEMA Region IX 1111 Broadway, Suite 1200

Oakland, CA 94607-4052 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112

James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814

James R. Becker, Site Vice President &

Station Director

Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424

Jennifer Tang

Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111

Pacific Gas and Electric Company

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.goV)

DRP Director (Roy.Caniano@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov)

Branch Chief, DRP (Vincent.Gaddy@nrc.gov) Senior Project Engineer, DRP (Rick.Deese@nrc.gov) Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lucy.Owen@nrc.gov) DRA Secretary (Judy.Kilcrease@nrc.gov) Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Ryan.Lantz@nrc.gov) OEDO RIV Coordinator, Primary (Leigh.Trocine@nrc.gov) OEDO, TRPS (Tamara.Bloomer@nrc.gov)

Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov) Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov) NRR Project Manager (Alan.Wang@nrc.gov)

RidsNrrDirslpab (Resource@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org ROPreports

File located: R:\EOC and Midcycle\Midcycle Assessment Letters\2009\DC.doc SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials VGG Publicly Avail Yes No Sensitive Yes No Sens. Type Initials VGGRIV:SPE/DRP/PBB C:DRP/PBB D:DRS CLDRO/PBB RWDeese VGGaddy RJCaniano VGGaddy /RA/ /RA/ /RA/ /RA/ 8/19/09 8/19/09 8/20/09 8/27/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax Inspection / Activity Plan Page 1 of 2 08/17/2009 14:25:29 Report 22 09/01/2009

-12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Diablo Canyon PBB-RVH2-UNIT 2 REACTOR VESSEL HEAD REPLACEMENT 2 2 IP Reactor Vessel Head Replacement Inspection 71007 05/10/2009 12/31/2009 EB1-08-U2 INSERVICE INSPECTION 3 2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/12/2009 10/23/2009 2 IP Inservice Inspection Activities - PWR 7111108P 10/12/2009 10/23/2009 EXAM-INITIAL EXAM 6 1 INITIAL EXAM- DC (4/31/2010)

X02435 11/30/2009 12/04/2009 2 INITIAL EXAM- DC 2 (3/31/2010)

X02436 11/30/2009 12/04/2009 2 INITIAL EXAM- DC (4/31/2010)

X02435 01/11/2010 01/22/2010 1 INITIAL EXAM- DC 2 (3/31/2010)

X02436 01/11/2010 01/22/2010 RP-ORS5-OCCUPATIONAL RADIATION SAFETY - ALARA 1 1, 2 IP A ccess Control to Radiologically Significant Areas 7112101 12/14/2009 12/18/2009 1, 2 IP A LARA Planning and Controls 7112102 12/14/2009 12/18/2009 1, 2 IP Performance Indicator Verification 71151 12/14/2009 12/18/2009 EB1-21-CDBI 6 1, 2 IP Component Design Bases Inspection 7111121 02/08/2010 02/12/2010 1, 2 IP Component Design Bases Inspection 7111121 02/22/2010 03/05/2010 PSB2-52B-BIENNIAL PI&R 4 1, 2 IP Identification and Resolution of Problems 71152B 03/22/2010 03/26/2010 1, 2 IP Identification and Resolution of Problems 71152B 04/05/2010 04/09/2010 EXAM-INITIAL EXAM 3 1 INITIAL EXAM- DC (4/31/2010)

X02435 04/12/2010 04/16/2010 1 INITIAL EXAM- DC (4/31/2010)

X02435 05/17/2010 05/21/2010 RP-ORS2-OCCUPATIONAL RADIATION SAFETY-ALARA 1 1, 2 IP A ccess Control to Radiologically Significant Areas 7112101 06/14/2010 06/18/2010 1, 2 IP A LARA Planning and Controls 7112102 06/14/2010 06/18/2010 1, 2 IP Performance Indicator Verification 71151 06/14/2010 06/18/2010 EP-1-BIENNIAL EP EXERCISE INSPECTION 3 1, 2 IP Exercise Evaluation 7111401 08/09/2010 08/13/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 08/09/2010 08/13/2010 1, 2 IP Drill/Exercise Performance 71151-EP01 08/09/2010 08/13/2010 1, 2 IP ERO Drill Participation 71151-EP02 08/09/2010 08/13/2010 1, 2 IP A lert & Notification System 71151-EP03 08/09/2010 08/13/2010 RP-ORS1-OCCUPATIONAL RADIATION SAFETY 1 1, 2 IP A ccess Control to Radiologically Significant Areas 7112101 10/04/2010 10/08/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 08/17/2009 14:25:29 Report 22 09/01/2009

-12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Diablo Canyon RP-ORS1-OCCUPATIONAL RADIATION SAFETY 1 1, 2 IP A LARA Planning and Controls 7112102 10/04/2010 10/08/2010 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 10/04/2010 10/08/2010 1, 2 IP RETS/ODCM Radiological Effluent 71151-PR01 10/04/2010 10/08/2010 EB1-08P-INSERVICE INSPECTION - U1 3 1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/12/2010 11/05/2010 1 IP Inservice Inspection Activities - PWR 7111108P 10/12/2010 11/05/2010 EB2-07T-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance 7111107T 12/06/2010 12/10/2010 RP TEAM-RADIATION SAFETY TEAM INSPECTION 4 1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 12/06/2010 12/10/2010 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 12/06/2010 12/10/2010 1, 2 IP Radioactive Material Processing and Transportation 7112202 12/06/2010 12/10/2010 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 12/06/2010 12/10/2010 1, 2 IP Material Control and Accounting (MC&A) 7113011 12/06/2010 12/10/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.