Letter Sequence Meeting |
---|
|
|
MONTHYEARML13225A7492013-08-12012 August 2013 NRR E-mail Capture - Slide Deck for Exelon Pre-Submittal Meeting Project stage: Request ML13193A0482013-08-14014 August 2013 Notice of Forthcoming Meeting with Exelon Generation Company, LLC (EGC) Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations Project stage: Meeting ML13238A1882013-08-26026 August 2013 8/27/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC (Egc)Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations Project stage: Meeting ML14232A7852014-05-19019 May 2014 Fuel Transition License Amendment Request Pre-Submittal Update Meeting Project stage: Meeting ML14219A2822014-08-0707 August 2014 Notice of Forthcoming Meeting with Exelon Generation Company, LLC (EGC) Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations Project stage: Meeting RS-14-238, Transmittal of Proprietary Meeting Slides2014-08-25025 August 2014 Transmittal of Proprietary Meeting Slides Project stage: Request ML14241A6332014-09-11011 September 2014 Summary of August 23, 2014, Meeting with Exelon Generation Company, LLC Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Station Project stage: Meeting ML14226B0122014-09-11011 September 2014 May 19, 2014 Summary of Meeting with Exelon Generation Company, LLC Regarding Areva Xm Fuel Transition for Dresden and Quad Cities Nuclear Stations Project stage: Meeting ML14246A5762014-09-17017 September 2014 Request for Withholding Proprietary Information from Public Disclosure (TAC Nos. MF2422, MF2423, MF2424, and MF2425) Project stage: Other ML14254A1532014-09-22022 September 2014 8/19/2014, Summary of Closed Meeting with Exelon Generation Company, LLC, Regarding Areva Am Fuel Transition for Dresden and Quad Cities Nuclear Stations Project stage: Meeting 2014-08-25
[Table View] |
May 19, 2014 Summary of Meeting with Exelon Generation Company, LLC Regarding Areva Xm Fuel Transition for Dresden and Quad Cities Nuclear Stations (TAC Nos. MF2422, MF2423, MF2424, and MF2425)ML14226B012 |
Person / Time |
---|
Site: |
Dresden, Quad Cities |
---|
Issue date: |
09/11/2014 |
---|
From: |
Mozafari B Plant Licensing Branch III |
---|
To: |
Tate L Plant Licensing Branch III |
---|
Brenda Mozafari, NRR/DORL 415-2020 |
References |
---|
TAC MF2422, TAC MF2423, TAC MF2424, TAC MF2425 |
Download: ML14226B012 (4) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24275A0302024-10-0707 October 2024 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendment Request to Allow Modification of the Standby Gas Treatment System ML24232A1532024-08-21021 August 2024 Summary of the August 8, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Plant, Units 2 and 3 ML24193A3432024-07-12012 July 2024 Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23237A2692023-08-25025 August 2023 Summary of the August 23, 2023 Public Outreach to Discuss the NRC 2022 End-of Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23181A0612023-06-30030 June 2023 Summary of the June 15, 2023 Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23068A3762023-03-16016 March 2023 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 ML22158A3102022-06-0808 June 2022 Summary of May 31, 2022, Public Outreach to Discuss NRC 2021 End of Cycle Performance Assessment of Dresden Power Station, Units 2 and 3, and Quad Cities Power Station, Units 1 and 2 ML22060A0782022-03-0707 March 2022 Summary of Meeting with Constellation Energy Generation, LLC Regarding a Proposed Alternative to Extend the In-service Inspection Intervals ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21195A3942021-07-14014 July 2021 Summary of the June 29, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 & 3, and Quad Cities Nuclear Power Station, Units 1 & 2 ML21187A2992021-07-0808 July 2021 Summary of May 27, 2021 Public Pre-Submittal Webinar with Exelon Generation Company, LLC Regarding Proposed License Amendment Requests Associated with Transition to New Fuel at LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear P ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21033A6582021-02-0404 February 2021 Summary of October 13, 2020, Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Post Shutdown Emergency Plan Staffing to Support the Planned Early Closures ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20280A2482020-10-0707 October 2020 Summary of September 22, 2020, Presubmittal Meeting Between the NRC and Exelon Generation Company LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Units 1 and 2 and Dresden, Units 2 and 3 ML20234A4472020-08-21021 August 2020 Summary of the July 29, 2020 Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML20234A4422020-08-21021 August 2020 Summary of the July 29, 2020 Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML20044F1882020-02-20020 February 2020 Summary, January 29, 2020, Closed Mtg W/ Exelon Generation Company, LLC Draft RAI No. 3, the Quad Cities Nuclear Power Station, Units 1 & 2 Amendment Request to Increase Main Steam Isolation Valve Leakage ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18347B4932019-01-0202 January 2019 Summary of Pre-Application Meeting with Exelon Generation Co., LLC (Exelon) Forthcoming License Amendment Requests to Revise Technical Specification Requirements for Main Steam Isolation Valve Leak Rate Tests ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18220B2772018-08-0808 August 2018 Summary of Open House to Discuss the 2017 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station Units 2 and 3 ML18155A5702018-06-0404 June 2018 Summary of the Public Outreach/Open House to Discuss the NRC 2017 End-Of-Cycle Plant Performance Assessment of the Quad Cities Nuclear Power Station, Units 1 and 2 ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17347B1022017-12-14014 December 2017 Summary of Meeting with Exelon Generation Company, LLC on Its Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response ML17317A9002017-11-13013 November 2017 Summary of Teleconference on November 9, 2017, Regarding Verbal Authorization of Relief Request to Use Alternative for Dresden Nuclear Power Station, Units 2 and 3 ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17156A5712017-06-0505 June 2017 Summary of May 25, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station Units 2 and 3 ML17152A2602017-06-0101 June 2017 May 25, 2017, Summary of Public Outreach/Open House to Discuss the NRC 2016 End-Of-Cycle Plant Performance Assessment of Quad Cities 2024-08-21
[Table view] |
Text
UNITED STATES ro 11.._ NUCLEAR REGULATORY COMMISSION o WASHINGTON, D.C. 20555-0001
<( 0 ; j September 11, 2014 "</. 1-'? ..,_o **** .. LICENSEE:
Exelon Generation Company, LLC FACILITY:
Dresden Nuclear Power Station, Units 2 and 3 Quad Cities Nuclear Power Station, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 19,2014, MEETING WITH EXELON GENERATION COMPANY, LLC REGARDING AREVA XM FUEL TRANSITION FOR DRESDEN AND QUAD CITIES NUCLEAR STATIONS (TAC NOS. MF2422, MF2423, MF2424, and MF2425) On May 19, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Exelon Generation Company, LLC (Exelon) and AREVA at the NRC Headquarters in Rockville, Maryland.
The purpose of the meeting was to discuss a planned license amendment to transition from Westinghouse Optima2 to AREVA XM nuclear fuel. The meeting notice, dated April 30, 2014, is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML14113A343.
A list of attendees is provided as an enclosure.
A formal presentation was made by Exelon and AREVA (ADAMS Accession No. ML14232A785).
The discussion topics included the transition process from a Westinghouse to AREVA fuel supply, a summary of the August 27, 2013, pre-submittal meeting, technical topics associated with the proposed transition, licensing activities, and schedule.
The NRC staff made several inquiries including those regarding licensing considerations, schedule concerns, and expectations for the submittal.
When NRC staff inquired about the types of analyses to be performed, Exelon responded that there will be a technical specification change and an anticipated transient without scram overpressurization analysis, and that they will address sensitivities.
Exelon indicated it will submit a license amendment request (LAR) for Quad Cities Nuclear Power Station (QCNPS) and Dresden Nuclear Power Station (DNPS). Exelon also indicated that AREVA will generate proprietary reports for both DNPS and QCNPS; however, the LARwill only include the reports for QCNPS since the application of the methodologies is the same for both stations.
When the NRC staff asked if this will be clarified, Exelon confirmed that it would. When the NRC staff requested that Exelon indicate whether there will be a mixed core with both Westinghouse and AREVA fuel, Exelon indicated that there will be a mixed core initially.
The NRC staff expressed that there are concerns as to whether the schedule proposed by Exelon can be met, particularly, the March 2016, date proposed for NRC staff approval.
A discussion between the NRC staff and Exelon occurred regarding licensing commitments and License Conditions (particularly, concerning channel bow) and the NRC staff indicated that Exelon can request a commitment, which the NRC can escalate to a License Condition, if necessary. The NRC staff indicated that there is an existing related QCNPS LAR that could change the upcoming LAR. The NRC staff made an inquiry about what will be done if the existing request is not approved.
Exelon indicated that it would resubmit if necessary.
The NRC staff also asked if another LAR was being submitted for the new fuel vault and Exelon indicated that this will be addressed in accordance with the Title 1 0 of the Code of Federal Regulations Section 50.59 process. The NRC staff requested that Exelon indicate whether there are concerns or difficulties in the analysis, including any involving thermal conductivity degradation (TCD), range of applicability, and conservatism.
Exelon indicated that it does not anticipate any issues and will take action to see if TCD (as well as other issues) are being addressed in their analysis and indicated that the analysis would be conservative.
Schedule concerns were again expressed by the NRC staff and Exelon indicated that it would be willing to have another pre-submittal meeting, as well as provide reports and other information.
The NRC requested that the crud/corrosion water chemistry program be described and the potential impact on the licensing analysis be provided.
Exelon indicated that the impact is minor, but that stability oscillation magnitude is one of them. Exelon indicated that a stability analysis will be done and that it is expected that the crud and corrosion will not impact results but that the analysis had not been completed.
The NRC staff requested that a more specific reference be provided for the fast transient evaluation operability assessment performed in 2009. Exelon indicated that it would provide this reference.
Other questions were also asked by the NRC staff but they were not included due to potential proprietary concerns.
The following are action items to be addressed by Exelon: Action 1: Action 2: Action 3: Action 4: Action 5: Action 6: Action 7: Exelon indicated that it does not anticipate any issues and will take action to see if TCD (as well as other issues) are being addressed in their analysis.
Describe crud/corrosion water chemistry program. Provide a more specific reference for the fast transient evaluation operability assessment performed in 2009. Take schedule concerns under consideration.
Set up a meeting (likely in the summer) to discuss technical issues. Provide information concerning control room dose. Discuss application of stability. Members of the public were not in attendance.
Public Meeting Feedback forms were made available but were not received.
This meeting was not transcribed.
The enclosure is a list of attendees.
Please direct any inquiries to me at 301-415-2020, or Brenda. Mozafari@nrc.
gov. Docket No(s). 50-237, 50-249, 50-254, and 50-265
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv Brenda L. Mozafari, Senior Project Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES MAY 19, 2014, MEETING WITH EXELON GENERATION COMPANY, LLC PRE-SUBMITTAL MEETING REGARDING AREVA XM FUEL TRANSITION FOR DRESDEN AND QUAD CITIES NUCLEAR STATION Name Affiliation Michael Reitmeyer Exelon Generation Anthony Will AREVA Timothy Byam Exelon Generation Jill Fisher Exelon Generation Hossein Youssefnia Exelon Generation Ed Mercer Westinghouse Darrell Carr AREVA Doug_ Wise Exelon Generation Alan Meginnis AREVA Norman Gardner AREVA Robert Schnepp AREVA Eva Brown NRC/NRR/DORL Robert Gladney NRC/NRR/DORL Travis Tate NRC/NRR Davida Cunanan NRC/NRR/SRXB Matthew Panicker NRC/NRR/SNPB Jen Gall NRC/NRR/SRXB Chris Jackson NRC/NRR/SRXB Tai Huang NRC/NRR/SRXB Jeremy_ Dean NRC/NRR/SNPB Enclosure Members of the public were not in attendance.
Public Meeting Feedback forms were made available but were not received.
This meeting was not transcribed.
The enclosure is a list of attendees.
Please direct any inquiries to me at 301-415-2020, or Brenda.Mozafari@nrc.gov.
!RAJ Brenda L. Mozafari, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No(s). 50-237, 50-249, 50-254, and 50-265
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsAcrsAcnw MaiiCTR Resource RidsNrrDorllpl3-2andPianning&Analysis Resource RidsNrrPMDresden Resource RidsNrrPMQuadCities Resource RidsNrrLASRohrer Resource RidsRgn3MaiiCenter Resource R. Gladney, NRR/DORL LPL3-2 R/F M. Panicker, NRR/DSS/SNPB ADAMS Accession No. Meeting Notice ML14113A343 Meeting Summary ML142268012 M f Sl'd ML4232A785 ee mg 1 es-* . 'I v1a ema1 OFFICE DORL!LPL 1-2/PM DORLILPL3-2/PM DSS/SNPB*
DORL!LPL3-2/LA DORLILPL3-2/BC DORL!LPL3-2/PM NAME RGiadney BMozafari MPanicker SRohrer TTate BMozafari DATE 09/10/14 9/11/14 08/05/2014 9/10/14 9/ 11/14 9/11//14 OFFICI AL RECORD COPY