MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 IR 05000483/20203012020-10-13013 October 2020 NRC Examination Report 05000483/2020301 IR 05000483/20193012019-04-23023 April 2019 Unit - NRC Examination Report 05000483/2019301 IR 05000483/20173012017-10-12012 October 2017 NRC Examination Report 05000483/2017301 IR 05000483/20163012016-06-10010 June 2016 Examination Report 05000483/2016301; 05/23/2016 - 06/07/2016; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20153012015-05-27027 May 2015 Er 05000483/2015301; 05/18/2015 - 05/19/2015, Callaway Nuclear Station; Initial Operator Licensing Examination Report IR 05000483/20143012015-01-21021 January 2015 Er 05000483/2014301; December 8, 2014, to January 7, 2015; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20133022013-09-10010 September 2013 Er 05000483-13-302; July 10 - August 29, 2013; Callaway Plant; Retake Initial Operator Licensing Examination Report IR 05000483/20133012013-06-13013 June 2013 Er 05000483-13-301, 03/18/2013 - 05/02/2013; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20113022011-07-0808 July 2011 Er 05000483-11-302; June 8-10, 2011; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20113012011-03-14014 March 2011 Er 05000483-11-301; Amerenue; 02/04/11 - 03/03/11; Callaway Plant; NRC Examination Report IR 05000483/20093012009-08-0707 August 2009 Er 05000483-09-301 on June 19 - July 7, 2009; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20073012008-01-18018 January 2008 Er 05000483-07-301, on November 26 Though December 7, 2007; Callaway Plant; Initial Operator Licensing Examination Report ML0615601372005-08-22022 August 2005 CW-08-2005-Final Outline ML0615600792005-08-22022 August 2005 08-2005-Draft Admin Outline ML0615600732005-08-22022 August 2005 08-2005 Draft Written Outline ML0615601892005-03-10010 March 2005 CW-08-2005-Final Operating Examination ML0615601392005-03-10010 March 2005 CW-08-2005-Final Written Examination ML0615601312005-03-10010 March 2005 CW-08-2005-Draft Operating Exam ML0615600862005-03-10010 March 2005 CW-08-2005-Draft Exam Comments ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination ML0409605912004-03-19019 March 2004 Calloway - Initial Operator Examination - February 2004 - Written Examination Performance Analysis and Applicant Questions 2022-04-12
[Table view] |
Text
May 26, 2015
SUBJECT:
CALLAWAY PLANT - NRC EXAMINATION REPORT 05000483/2015301
Dear Mr. Diya:
On May 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license retake examination at Callaway Plant. The enclosed report documents the examination result and licensing decision. The preliminary examination result was discussed on May 18, 2015, with Mr. Phillip Swan, Operations Exam Developer. A telephonic exit meeting was conducted on May 19, 2015 with Mr. P. Swan, who was provided the NRC licensing decision.
The retake examination included the evaluation of one applicant for an instant senior reactor operator license. The Chief Examiner determined that the applicant satisfied the requirements of 10 CFR Part 55 and the appropriate license has been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.
No findings were identified during this retake examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety
Docket No. 50-483 License No. NPF-30
Enclosure:
NRC Examination Report 05000483/2015301
ML15147A315 SUNSI Review By: SGarchow ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE OE: OB ABC:PBC C: OB NAME SGarchow ARosebrook VGaddy SIGNATURE /RA/ /RA/ /RA/ DATE 5/20/15 5/22/15 5/26/15 Letter to Mr. Fadi Diya from Vincent G. Gaddy, dated May 26, 2015 SUBJECT: CALLAWAY PLANT - NRC EXAMINATION REPORT 05000483/2015301
Electronic distribution by RIV
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Andrew. Rosebrook@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Team Leader, DRS/TSS (Don.Allen@nrc.gov RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
- 1 - Enclosure U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Docket: 05000483 License: NPF-30 Report: 05000483/2015301 Licensee: Union Electric Company Facility: Callaway Plant Location: P.O. Box 620 Fulton, MO 65251 Date: May 18 through May 19, 2015 Inspector: S. Garchow, Chief Examiner, Senior Operations Engineer Approved By: Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety
- 2 -
SUMMARY
ER 05000483/2015301; 05/18/2015 - 05/19/2015, Callaway Nuclear Station; Initial Operator Licensing Examination Report.
The NRC evaluated the competency of one applicant for an instant senior reactor operator license at Callaway Plant.
The licensee developed the retake written examination using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The operating test and reactor operator portion of the written examination was waived by the NRC.
The written retake was administered on May 18, 2015.
The NRC determined that the applicant satisfied the requirements of 10 CFR Part 55, and the appropriate license has been issued.
A. NRC-Identified and Self-Revealing Findings
None.
B. Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
The NRC Chief Examiner reviewed the license application submitted to ensure the applicant satisfied relevant license eligibility requirements.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed the written retake dr aft examination submitted by the licensee against the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
b. Findings
The NRC Chief Examiner provided comment s to the licensee and the licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined the draft written ex amination initially submitted by the licensee was within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
The licensee administered the written retake examination to the applicant on May 18, 2015.
b. Findings
No findings were identified.
.4 Simulation Facility Performance
a. Scope
The NRC Chief Examiner did not observe simulator performance during the written retake examination administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC Chief Examiner reviewed examination security for examination development and administration for compliance with 10 CFR 55.49 and NUREG-1021.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
A telephonic exit was conducted on May 19, 2015, between Mr. S. Garchow, Chief Examiner, and Mr. P. Swan, Operations Exam Developer.
The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- P. Swan, Operations Exam Developer
NRC Personnel
- T. Hartman, Senior Resident Inspector
ADAMS DOCUMENTS REFERENCED