ML18086A929

From kanterella
Revision as of 15:34, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Safe Shutdown & Interaction Analyses, Reflecting Util Approach to Safe Shutdown & Interaction Analyses, Response to Info Requests & Program Changes Per NRC Fire Protection Review.Rept Supersedes 810717 Interim Rept
ML18086A929
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/18/1981
From: Mittl R
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18086A930 List:
References
GL-81-12, NUDOCS 8109220433
Download: ML18086A929 (2)


Text

Public Service Electric and Gas Company 80 Park Plaza, T16D Newark, N.J. 07101 201/430-8217 Robert L. Mittl General Manager -Licensing and Environment Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention; Mr. Steven A. Varga Operating Reactors Branch 1 Division of Licensing Gentlemen:

FIRE PROTECTION PROGRAM NO. 1 AND 2 UNITS SALEM NUCLEAR GENERATING STATION DOCKET NOS. 50-272 AND 50-311 September 18, 1981 PSE&G hereby .submits, in the enclosure to this letter, its final report "Safe Shutdown and Interaction Analyses." The enclosed material addresses the overall fire protection program for the Salem Nuclear Generating Station. It has been prepared in a format which reflects the PSE&G approach to safe shutdown and interaction analyses, the response to specific NRC requests for information, and changes to the fire protection program resulting from the NRC fire protection review. The report reflects the methodology, criteria, resolution of problem areas. It also _provides drawings and othet information which reflect the methods used in the safe shutdown and interaction analyses.

The report sections related to NRC Generic Letter 81-12 and Appendix R involve a cross-referencing technique to other report sections where sible to illustrate that the PSE&G methodology complies with the information requirements of the NRC documents.

This report supersedes the interim.report on this topic submitted on July 17, 1981.

Should you have any questions, do not hesitate to contact us. Enclosures cc Mr. Leif Norrholm Senior Resident Inspector, PSE&G Mr. Gary Meyer Manager, NRC PDR ADOCK 05000272 F PDR The Energy People Aot:>! dE,.,., L.!S D;il, i:):., 6 f c. i c. f'ioitCAllCANTE 1 N *'*'

..

.. 0
  • Director of Nuclear Reactor Regulation u.s. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 BCC General Manager Engineering General Manager Nuclear Production General Manager Corporate Quality Assurance Manager Nuclear Operations Support Manager -Salem Brojects Manager -Salem Assistant General Solicitor (R. Fryling, Jr.) Safety Review Engineer (B._,E. Hall) Corporate Rate Counsel Chief Controls Engineer Chief Electrical Engineer 9/18/81 Enclosures under separate packages