Monthly Oper Rept for Nov 1978
ML18113A712
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/01/1978
From: Kane G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18113A711 List:
References
NUDOCS 7812200262
Download: ML18113A712 (40)


Text

I I ,.:-; : l --------**------------***----,

-*-***-**---*-----*---

  • --*** ------*-* , . \ r .. 1 '" .... J. ,, I * ! VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MOUTHLY OPERATING REPORT REPORT NO. 78-11 NOVEUBER, 1978 Superintendent-Station APPROVED:

' MANAGER 7 B122002G;z._

. * * '1 .. " -i-COlITEHTS Section Key Personnel Changes Operating Data Report Unit !fl Operating Data Reprot Unit //2 Unit Shutdowns and Power Reductions

-Unit #1 Unit Shutdowns and Power Reductions Unit /12 Load Reductions Due to Environmental Restrictions

-Unit #1 Load Reductions Due to Environmental Restrictions.-

Unit 112 Average Daily Unit Power Level -Unit #1 Average Daily Unit Power Level Unit #2 Summary of Operating Experience Amendments to Facility Lic.ense or Technical Specifications Facility Changes Requiring NRC Approval . . Facility Changes That Did Not Require NRC Approval.-

Tests and Experiments Requiring URC Approval Tests and Experiments That Did Not Require NRC Approval Other Tests and Experiments Chemistry Report Description of All Instances Where Thermal Discharge Limits . Were Exceeded Fuel Handling Procedure Revisions That Changed the Operating Mode Described In The FSli.R Description of Periodic Tests Which Were Not Completed Within The Time Limits Specified In Technical Specifications Inservice Inspection Reportable Occurrences Pertaining to Any Outage or Power Reductions Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit ill -Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit f.!2 -Uechanical Maintenance Page 1 2 3 4 5 6 7 8 9 10 11 12 12 13 13 14 15 16 17 20 21 :.,1_ 22 23 24 26

'**: . ':-. -ii-r.fl . .. .t * *Section , .,,-,*. .J_*,** *.Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit Ill -Electrical Maintenance . , .. * . . Maintenance of Safety Related Systems During Outage or Reduced * *. Power Periods -Unit f/2 -Electrical .Maintenance . .

  • Maintenance of Safety Related Systems During.Outage or Reduced Power Periods -Unit #1 -Instrument Maintenance
  • ?1aintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit 112 -Instrument Maintenance
Health.* Physics Summa;ry Procedure Deviations reviewed by Station Nuclear Safety and Operating Committee after Time Limits Specified in

... . -*: *: *' .. *_*. _, .. ,;.***-,, .. *,* . -.... _.,* *_._Page . . . . . . ,,"'..* ...... , *"'.' '* . -:;,_** ..... : .. '** . _.;,. . . . . -.. ' ... . .. -"*: -:/ '; _,*.* . * ... . -.. .. , .. '.:*" .. ' : . .-*: .* .. . . << : __ t 28 .*. 30 32 34 36. 37 *" . ': . > .. *' .. -.***' **,*:* **1

. ' . ' .11 ! " *

  • .-:*-. -.:.*'*--** a --1-KEY PERSONNEL CHANG. NOVEMBER, 1978 The following key personnel changes.were affected November l, 1978: Position Supervisor, Mechanical Maintenance Supervisor, Engineering Services D. S. Taylor transferred to Corporate Offices. J. W. Patrick appointed.

L. A. Johnson transferred to Corporate Offices. T. A. Peebles appointedo

. . ' _\; .-, .. r .. ..-.. *. ' . .': .. :** ..

.* NG. DAT.4 REPORT . :'* .!'.: * ** L *. , *** : DOCKET NO.** so-2eo ,. . ' DATE*04 DEC 7e COMPLETED BI O.J. COSTELLO TELEPHONE

  • -,*. .> I.'**. OPEP.ATZ!VG STATUS
  • :.* .... 1. U liIT li Al1E 2. RE?ORT:NG PERIOD .. 3. i::ENSED THERMAL (MWT).
  • 4.
  • N A!".fEP LATE RATING MW'B) SURRY UNIT. 1 . .... ;, .. ,:, **:, .. ** *. ., .... . . ' ' 0001 781101-2400 7!1130 2441
  • I . t '347.5 !NOTES .I . :;-.. 5. DSE:Gll ELECTE.:C AL :?.4TING (NET MiiE) 1 22 1 . _*. ll. . . . . _ .... * . . II . : { .. *: 5.

DEPENDABLE CAPAC:TY (GEOSS MWE) . 7. UAX:.'!U!!

DEPENDABLE CAPAC!TI \NET i'dWE) . 775 .. l __ -.,._._ ________ l ... '3. IF C!i:.ilGES OCCUR !N CAPAC!TY RATINGS NIA ** ' . '(I:n::.is 3 THROUGH 7) S!NC E LAST , >REPORT. G:vs REASONS ' .. : ,* .. ' . .. ' .. "' :; 1.**:::*'..

'.': '. *. 9. POWER LEVEL TO VIHICH IF ANY NIA ;** ... * . (NET f.!wE) 10. REASOOS FOR RESTR!CTIONSg IF ANY Nii '. .HOURS IN P.EPORTING PERIOD 12. NUMEE?. OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE SHUTDOWN HOURS *14. HOl.IRS GENERATOR ON-LINE

  • 15. UNIT RESERVE SHUTDOWN HOURS 16. GROSS tBERMAL .!NERGI GENERATED (MWH) *. 17
  • GROSS ELECTRICiL ENERGY GENERATED (MWH) 18. ll ET ELECTRIC AL ENERGY GEN'E:RATED (MW if) *19. UNIT SERVICE FACTOR 20. i;NIT AVAILAB'ILITI*

FACTOR

  • 21. TJN!T CAPACITY FACTOR (USING MDC .VET) 22. UNIT CAPACITY FACTOR (USING DER llET) *. 23. UN!T FORCED.OUTAGE RATE 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TIPE,DATE.AYD DURATION OF EACH) 25. IF SHUT DOWN AT !ND OF REPORT PERIOD. ESTI!1ATE DATE OF STARTUP . 26. UNITS Ill TEST STATUS. C?R:OE '!0 COlo!UERCIAL OPERATION)

ZN:T!AL CRIT!CALITI INITIAL ELECTRIC!Tl COMMERCIAL OPERATIOU

  • THIS MONTH YR-TO-DATE CUMULAT:VE 720.0 e016.0 52DSO.O. 720.0 6124.1 35441.0, o.o .o.o 0.0 ,' 720.0
  • 6042.9. 34608.1 O.O 0.0. D.O 1 7 4 s 7 7 e
  • o 14 e s 1 o 7 e-,, o 7 9 1 7 2 o 7 2
  • o '.. -ss31es.o 4160110.0.

2e120013.o*

535373.0

  • 452s120.o 100.0 o/o 75.4 @lo E6.5 o/@ 100.0 olo 75.4 alo *se.5 *lo 9 s . g o / o i 2 *. 9 o I o * ,.; e 1 . 4 (I I o * . *
  • 90eS olo '*. 68.7 o/o 57.9 o/o 0.0 0:2 o/t1 .*1s.s o/o S/G INSPECTION 3 WEEKS * . . . FORECAST

',"' ',. * . .,. . '. *, . . . .. ' .:. ;* .* *. '*, *' *,. .::

  • _ .. , *. *, 1* . .. .. I\.' I I ..

.. 4TZllG DATA . OPERAT:NG STATUS

1. fJN!T NAZ>!E ; *-*'* . . . . . . . ; lEPORT DOCKET NO.

DATE 04 DEC 79 COMPLETED BY 0.J. COSTELLO TELEPEONE*904-357-31R4 . * ... SURRY !J N!T 2 . ... ,, .. . . . .' , ...

  • 0001 1e1101-2400 1e1130 ,. h, ,* .*.**-*-_ ' ... -: ,.* .. _.", .. *,:** . 2. REPORTING PERIOD 3. LICENSED TEERMAL POWER CMWT)
  • 2441
4. rl AMEP LATE RATING (GROSS MWE) 94 7. 5 I NOT ES . < . I 5. DESIGN ELECTR!CAL RATING {NET e22 . I -* *:I *. *.* .'=. MAXI:>WM DEP!NDABLE CAPACITY (GROSS MWE) 911 I . .. . I 7. l.JAX!!-tUM DEPENDABLE CAPACITY (NET MWE)
  • 775. . e. IF CHANGES OCCUR !N CAPACITY RATINGS
  • NIA ., ._(ITEMS 3 THROUGH 7) SINCE LAST ' * ... REPORT. GIVE REASONS ' '. *. *,'* .. c;i. POWER LEVEL RESTRICTED.

IF AllY NIA. (NET MWE) :-***

  • 10. REASONS FOR RESTRICTIONS., IF ANI N/A 11. HOURS IN REPORTING
12. NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR REStRVE SHUTDOWN HOURS .. 14. HOURS G'E:NERATOR ON-LINE 15. UN!T RESERVE SHUTDOWN HOURS .16. GROSS THERMAL ENERGY GENERATED (MWH) 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18. NkT ENERGY GENERATED
19. UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) 23. UNIT FORCED ()!JTAGE RATE 24. 'SHUTDOWNS SCHEDULED OVER NEXT E MONTHS (TYPE,DATE,AND DURATION OF

-25. IF SHUT DOWN AT END OF*REPQRT PERIOD, ESTIMATE DATE OF STARTUP 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY Dl'ITI AL ELECTRICITY . COMMERCIAL OPERATION THIS MONTH Cl/MU LAT IVE.* . ... *: 720.0 48960.0 6543.5 32956.3 0.0 o.o 0.0 720.0 . 32455.2

  • o.o o.o 1756774;0 75489002.0 572245.o :sogoo20.o 24657414.0 544291.0 . 483321'L0 233S633S.*J 100.0 o/o . 91.4 o/o '66.3 o/o 100.0 o/o .* 91.4 o/o
  • 66.3 o/o' 97.5 o/o 77.e o/Q e1.e o/o 92.0 o/o
  • 73.4 o/o 58.1 o/o 0.0 2.1 o/o *:21.e o/o STEAM GENERATOR REPLACEMENT 6 MONTHS NIA " ' . : FORECAST ACHIEVED .. :

! ' i ' i,' Dale ... , .. r: w=mc:ed . S: Schtdutcd

' \. ... , . " . itErORT l\ION"Jll NOVEMBER 1978 -u p. None du . ing l hie. J!>er od. . ,'

.* *. Uccm:ce l!ven*1 Rcpoll # *.' . ' ,* /\-f:11ulpmc11i fulhue (!Exrlalnl ll-Mnhulcnnnce oi Tua *.. . r-llefucllng

' . ' ' ;, . . D-Qtcgufo*ory UtcshlclDon

  • * *
  • t:-Opcv:11m Trnlnlng &. Uce1m1 E1u1mBm1tlon F-Admlnhlmlft'lc . * (i-Ol'cr:etlmrnl Enor (Explmln)

U-O*hcr U:xa*l:dn), . .. 3 . z.;* : ,* Methocl: I-Manual ij P*o **Eu 0* u 1-M:mu:ll Scram. ' J-Au1011111Uc Scram. 4-0llm (Explnln&

    • ,". ,* '*'* -* * * ','
  • o't .* ... . ' :""' . ' *,: ,*. **. *., --DOCKET NO. .... 0_' __ .....__ > /., UNll" NAME Unit l *' DATE 12-1-78 * !o >:. COMrl.E.l"EI>

llY llONE. G. Kane (8011) 357-3184 A 4 5 I*.*.* Cause & Cnrrtcllve

  • Acllun lu rrevellt llecurrc1,ce Exhibit G
  • lnslrnctlo111

-., . : for l'rr1,11r111lun ur Data **> .. * .* Entry Sheets for l.kcnsee -. ' .. Eve111 llepurl (Ll:nl nle INUREG* *Ol6U E:dslbll I

  • Samt Sotm:t * *'* *' .' '-: .. *. * . '.* '* *, :. *" *,' *. * ...... -r . .-i "I '! .; ii 0 . ii' *, I . cl -i i ' j i' . *; 'i " :' ) ,, *1! I .*, tt N er ..... ' -..9 l :r i: .. *.'I :f:*

... U:11c a:: 2:11ra:eci . 5: 5d1td119ed UNll' SHUTI>OWNS ANO l'O\'IEU IU!J>UC110NS c: .... . 2 t? -* ::J l' :I :J :c .o--.. ".* Hc:mm:* A-i'.11*111pmen1 F111lme

!Hfalnlen:mce oif TcsiO .* irnroRT MONlU NOVEMBER 1978' l.lcimsce . l!vcnl

  1. .. c: ' V\ *a*a 0* u None ciuring tli-s peri 1d. _ . .. . McQfwtl:

('.at1:r, ..

_,*.. .,,. * '2*Manual Scram.* ]-Aulmnallc Scram. 4-0lher (l!xpla!n& . n-ll1:g11l:i1nry Btcshkth!n . a: :opcrnlm Trnlnlnc &

n:111onlmi11lnn F-A1lmlnhhaGhe

-(;.n1'1!1:11lun:1l l'.11ur H 01hca U:xpl:aln, '. ' ) *, DOCKE'f NO. UNIT NAME l>ATI!

nv U!l.EI llONn Cnuic &

Action ht rrevcnl llccurrcnce

  • , . **' . _, . -.. *. j. 50-281 " . -Surry 2 12-1-78 G. Kane"' (8011) 357-3184 *' ,* . ,, --. I VI . I ' . Exhibit G -lnsl1i1cllon1
  • for l'rrl'atalltm ur Dat:a . EnlD)' Shtrls for l.ktnsre
  • 1 l!vcnl ltrpml (U:IU nlr tNUltEG* * ; Ol6U Exhlbll I
  • Samt Sn111&:t . ' ,, -. ,-*'-. '*. . I ( .J

.. -.-'* '* 1; .. ;

  • 1 : ,. DATE TI!1E. . .--. . .
  • e . LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. i
  • MONTH: NOVEMBER, 1978 HOURS LOAD, MW. REDUCTIONS, MW REASON . I
  • NONE DURING THIS REPORTING P .RIOD. .* MONTHLY TOTAL 0

.* ..... . ..... * *'.**: \ *, ' , . ' ,: ,, .... '*'. !,, *, .. : ... , . ';.' ** . ,_. LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS

., *. *' UNIT NO *. 2 *. ****'* * , MONTH: NOVEMBER, 197 8 ,, TI11E HOURS LOAD, MW .. REDUCTIONS, UW REASON .t'. _: .. ': ",* ) NONE DUR THIS P IODe *' i,. ,*,**. . *: . *. '1. MONTHLY TOTAL 0 '*-**---

-. -----* __ . _.

..... ' *' . I . ,**' .. \ *. ' . *. :0°

  • . * . , .. ur!!T ' SUP.P..Y : .* DI.TE.: . . COMPLETED 3Y :* a J COSTELLQ ;.< . MON'!E: * :VCJTlEMBEE 197'3 '. :. -.-:*:. , '; *., . i' _,' -_ .. DAY POWER LEVEL (KvlE-NET)

DAY . AV!RAGE DAI LI POWER LGVEL .. .. U.JWE-NET)

.1 751.0 16 2 '* 750.9 17' " 3 750.0 1! 1so.e 19 5 75.0 I 5 20 --'/ . . :*:. ; 750. 9' 751.5* 750.5 " --** ..

  • 751 R .... 750 .s' -' :* .. -. . '., :, -!,,., -; . . ... 6*

.21 ... * .*-:* ., . . . 127.9 . . . . ' 7 747.e 9 713.7 9 720.3 10 749.e 11 150.9 12 751.S 13 750.6 1<.!.* 7#9.0 , 15 "/49 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS 22 23 24 25 26 27 29 29 30 **-.;-** . . . . '* *-,'-' .* ,"' ::* .. 132.2 ;11-e.2 749.2 146.5 745.0 "13@.5' 748.3 ON THIS FORN.. L:::ST THE AVERAGE DJl.!LY UNIT POWER LEVEL IN l.fvlE-flET FOR. EACH DA'! !N . TEE ::r.EPORTING MONTH. THESE FIGURES WILL EE USED TO PLOT A GRAPH FOR EAC.lf REPORT-***

I.VG .l.!ONTH.

!vOTY: Tfi.4T 3Y USING MAXINUM DEP5NDABLE CAPACITY FOP. T'SE N-eT ELECTRICAL RATING OF THE uNIT. THERE MAY BE OCCASIONS WHEN THE DA::LY AVERAGE POWSR EXCEEDS THE o/o LI!iE (OR THE .':f.ESTR.!CTED PO'ilER LEflEL LINE). IN SUC,fi C;4SSS. THE AVERA:rE Dl.ILY UNIT POf!ER OUTPUT SHEET SHOULD BE FOOTNOTED T,O EXPLAIN THE APP/..RENT Al70MALI * .: .. :,*** .** '* -* ----,, .:_ ... . . : . .. ;" -. -:.-,**. . ,,** .. * . I --i ' ' : .. *

  • . .. . . .*. ,. _.* *. .. * *',. i :. ' ** D. ,VQ.

..... ** UNIT .

, . . e D/C'E
  • COr.JPLETSD BY .OJ COSTELLO '.:* AV'E:RAGE DA:[,Y U'N!T POW'E:R LETl'SL * . .*. .NOV'SNBER 19n . DAY .. .a. 2 .* 3 .4 5 e ,. . . e 10 11 12 13 14 15 **AVERAGE

!JA:LY ?OWER LEV!L U>ftlE-NET) 759.7 758.1 759 .* 4 760.1 7se.7 156.7 757.e 754.6 \. 756 .. 0 759.4 757.5 '159.5 75*9. e 7513.5 756.7 . l UNIT POWER LET/EL INSTRUCTIONS AVERAGE DAZLY POWER LEVEL DAY U*f'llE-NET) 16 755.0 '* '* .,**. 17 754.3 18 19 736. 7 . 20 756.5 ... 21 751.4 22

,* .. 23 i'" 754.S . 24 755. 5 . 25 755. e 26 757.2 27 758. 9 2e 758.2 * ..... 29 755.4 .-*-* 30 756.9 ON THIS FORN. LIST THE AVERAGE DAILY UN!T POWER LEVEL IN ,\fllE-NET FOR EACH DAY IN THE REPOKI'ING MONTH. THESE FIGURES WILL BE USED TO PLOT A FOR EACH ING .\fONTH. NOTE THAX BY USING l:1AXIMUU DEPENDABl,E CAPACITY FOR THE NET ELECTRICAL RATING OF THE UNIT. THERE MAY BE OCCASIONS NHEN THE DAILY AVERAGE POWER EXCEEDS TEE 100 °/0 LINE lOR THE RESTP..ICTED POWER LET/EL LINE). !N SUCH CASES. TEE AVZRAGE DAILY UNIT POWER OUTPUT SHEET SHOULD. BE FOOTNOTED TO EXPLAIN THE ANOMALY. ' . . . ' . ' ._ .. *:,. *,-,:. *.i'

'** .--**.-. "' ... . \.; .* e '

SUMMARY

OF OPERATING mE. '_ ?lOVEMBER, 1978 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in ificant non-load related incidents.

UNIT 1

  • November 1 November 8 November 9 This report period begins with the unit at 100% power. At 1120 power was reduced to 90%. The ineore/excore nuclear indication' calibration map was found to be out of date. At 0915 the map results were found to be acceptable and load was increased to 100%. November 10 -At 1433 during a switching operation in the switchyard
  1. 1 Auto Transformer failed. November 21 At 1136 "B" High Pressure Drain Pump motor tripped on ground fault and "A" High Pressure Drain Pump showed low resistance approximately 40 MWe reduction in output as a result of no High Pressure Drain P:iimps operating.

November 22 -November 23 -At 0930 the "A" High Pressure Drain Pump was returned to-service.

At 1015 the load was reduced to 88% due to a secondary chemistry transient.

This resulted from a high inleakage condenser tube failures.

At 0457 returned unit to 100% power. The c'ondense'f inleakage was stopped and chemistry stabilized.

November 29 -At 1120 a rampdown was commenced because "A'i BAST & BIT were low in boron concentration.

Primary grade water was inadvertantly introduced to the BAST. At 1250 with reactor power at

-. -mately 80% the [CB] in the "B" BAST & BIT were returned to fication and a was begun. At 1442 the unit was returned * * -eo 100% power. November 30 -This.report period ends with the unit at 100% power. UNIT 2 November 1 This report period begins with the unit*at 100% p<;>wer * . November 19 -At 0140 a load reduction to load follow was begun at the request of system operator.

At 0252 load was at 83% power. At 0445 a . load increase was begun and at 0620 the unit was returned to iOO% power.

  • November 30 -This report period ends with the unit at 100% power. -i ., .I I I -. I ' i !

. ' ;; . ' ' Af*1ENm s TO FACILITY LICENSE OR SPECIFICATIOHS NOVEMBER, 1978 On 11-06-78 the Nuclear Regulatory Commission issued amendment No. 45 to the Operating Licenses for the Surry Power Station Unit Nos. l and 2, which are designated as Technical Specification Change No. 56. This change is the result of our request to revise the mental Monitoring Program. Of significance are the following changes: (1) Deletion of the biological monitoring program except fdr a low intensity fish sampling program. (2) Reduction of the programs for temperature salinity and impingment monitoring.

(3) In addition, a correction

_to page TS 6.4-7a is included which indicates fourteen (14) days ap the correct review period.

.. . ---* .* . -**. **-** .. ,, . *, '* ... . . :':* .. "*.;.: .* .. ::**: .. !*;: .* * ...... .. -12: F AC IL I TY CHANGES REQUFI: NRC APPROVAL NOVEMBER, 1978 None during this operating period. FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL NOVEMBER, 1978 . None during this reporting

-------. *. TESTS AND EXl?ERIHENTS REQ.ING . e ,* NRC AP PROV AL NOVEMBER, 1978. There were none during this reporting period
  • TEST AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL NOVEMBER, 1978 There were none during this reporting period" !

.. -J.'t-. .. :, OTHER CHANGES, TESTS AND

' ,:. ' .*. 1978 _*;. NOVEMBER, There were none during this reporting period. _,. *:, . * .* > ***.;_,-: . : .**,'. '* .* * ..... *._, .. *'*

.. f ... . . . . . ' ' ' 7 .. PRIMARY COOLANT ANALYSIS Gross Radioact., µCi/ml Suspended Solids, ppm Gross Tritium, µCi/ml Iodine-131, µCi/ml I-131/I-133 Hydrogen, cc/kg* Lithium, ppm Boron-10, ppm + Oxygen-16, ppm Chloride, ppm pH @ 25°C , .. * *. '** SURRY POWER STATION * : .. --* ...... CHEMIS.'!RY REPORT NOVEMBER, , 19 78 T.S.6.6.A.ll UNIT NO. 1 UNIT NO. MAXIMUM MINnroM AVERAGE MAXIMDM MINIMUM 3.80E-1 2.05E-1 3.04E-l 1.86E-1 7.02E-2 0.2 0.1 0.1 0.2 0.1 2.38E-l l.95E-l 2.09E-l L64E-l 1.40E-l 4.l8E-2 9.36E-4 9.36E-3 5.70E-4 l.92E-4 0.8664 0.0775 0.3262 0.1372 0.0568 38.0 25.5 30.6 39.7 25.2 .. 2.15 1.85 1.98

  • o.7o 0.25 116.0 121.4 *36.3 22.9 0.000 0.000 0.000 o.ooo d.000 o .... os . 0.05 0.05 '0.05 0.05 6.92 .6 .68 6.81 7.10 6.24 * + Boron-10 = Total Boron x 0.196 Remarks: Phosphate Sulfate 50% NaOH o.o 278 350 NON-RADIOACTIVE CHEMICAL . RELEASES P. POUNDS . T.S. 4.13.A.8
  • Boron 508 Chromate __ ._0_7 _____ Chlorine . O .O -----------------. -*.* . ' . *.* .* -:-. 2 AVERAGE l.07E-l .. 0.1 l.49E-l 3.88E-4 0.0931 30.1 0.42 29.9 o.ooo o.os 6.89

... . ' ., .. .. -*-.. :*,--. -,* > :_. * ** *r.* ' .. -: ,_ . * .. , DESCRIPTION OF ALL INSTAN DISCHARGE LU1ITS WE **: .. -** .. *.;*., .*_.' NOVEMBER, 1978 Due to impail:ment.of the circulating water system on the following days the thermal Discharge limits were exceeded as noted. November 1, 1978 November 2, 1978 November 3, 1978 November 4, 1978 November 5, 1978 November 6, 1978

  • Novembe?:'

7, 1978 November 8, 1978 November 9, 1978 November 10, 1978 November 11, 1978 November 12, 1978

  • November 13, 1978
  • November 14, 1978 *
  • November 15, 1978
  • November 16, 1978 *
  • November 17, 1978
  • November 18, 1978
  • November 19, 1978
  • November 20, 1978 November 2i, 1978 November 22, .. 1978 November 23, 1978
  • November 24, 1978 November 25, 1978
  • November 26, 1978
  • November 27, 1978
  • November 28, 1978
  • November 29, 1978 ** November 30, 1978
  • Exceeded 17.5°F bT across station Exceeded 17.5°F tiT across station Exceeded 17.5°F liT across station Exceeded 17.5°F liT across station Exceeded 17.5°F /J.T across station Exceeded l7.5°F /J.T across station Exceeded 17.5°F /J.T across station Exceeded l.7 .5.°F /J.T across station Exceeded l7.5°F /J.T across station Exceeded

/J.T across station Exceeded 17.5°F /J.T across station Exceeded 17 .5°F liT across sta.tion .... Exceeded 17.5°F /iT across station Exceeded 15.0°F liT across station Exceeded 15.0°F /iT across station Exceeded 17.5°F /J.T across station Exceeded 15.0°F liT across station Exceeded 17.5°F liT across station Exceeded 15.0°F /J.T across station Exceeded 15. 0°F'-/J.T across station Exceeded l7.5°F tiT across station Exceeded 17.5°F liT across station Exceeded 15.0°F /J.T across station Exceeded 17.5°F /J.T across station Exceeded 15.0°F /J.T across station Exceeded 15.0°F /J.T across station Exceeded 15.0°F liT across station Exceeded 15.0°F /J.T .across station Exceeded 15.0°F liT across station Exceeded 15.0°F 6T across station *Indicates dates where station

<15.0°F across the station for sometime day. These tiT excursions were allowable under Technical Specifications 4.14.B.2.

There were no reported instances of significant adverse epvironmental impact. On November 18, 1978 the temperature change at the station discharge exceeded 3°F per hour while returning station vacuum priming system to service on Unit l condenser waterboxes.

This event was reported in accordance with Technical fications 4 ... 14. ..... * ..

,.

  • FUEL HANDLING NOVEMBER, 1978
  • No fuel handling was done during this reporting period. . -*.:* .. '. I . ,

.. -.. ..---_ .* .-.. * .. *s* -' _ .; -.. -is-*-*,----*---.*--'-----_,.,..-:-.--:--*------uNIT-NO'.

  • 1-------I I ' I'. *. DATE SHIPPED/RECEIVED . :-e UOVElIBER, 1978 ..* e .:.* :* FUEL HANDLING * * * . ,-*.: .. ;.::;-" .. NO OF ASSEt-IBLIES PER SHIPMENT ANSI tm .. INITIAL ENRICHMENT NONE DURING THIS REPORTING PERIOD. -... : .. ---------*--'----** .. *--. NEW OR SPENT FUEL .* SHIPPING CASK ACTIVITY LEVEL I I i DATE SHIPPED/RECEIVED NO .OF ASSEMBLIES PER.SHIPMENT ANSI no. . INITIAL ENRICm1ENT . NONE DURINt; THIS REPORTING PE"RTOn I NEW OR SPEUT FUEL SHIPPING CASK ACTIVITY LEVEL
  • -*** r: * --------_ .. __ ,,:,. .. --------. . . . . -..... ,,. _ ..... _.. ..... --.........

-....... *------*--*

  • --* -* *--***---**----

.... __ ..._._ ___________ . ___

........ -....... .. ___ _ . Number Annunciator ZD-22 PROCEDURE REVISIONS THAT OPERATING HODE DESCRIBED IN THE FSAR IJOVEMBER, 1978 Unit Title 2 .PORV Lo Air Pressure :.. *. Change* New Procedure

.* ., . J Number 22.4A 22.4C -------*--*-*------*-*------*---21-. -. . tlcRIPTION OF PERIODIC TESTS WH. WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS NOVEHBER, 1978 Title Comment Diesel No. 1 Refueling Inspection 1ER 78-040/031-0 Diesel No. 3 Refµeling Inspection LER 78-040/031-0*

____________

...,. ____ _ Unit l l.

. . . . ... ___ ......

-*

... _ _. ____ *--:..-.---**----------.-

--:*-**--*-.:_...._..

__ ..

... *--*' t .. J . . INSERVICE INSPECTIOU

  • NOVEUBER, 1978 None during this reporting period.

. i . ---*-----------*

........ _,_ ... ___ ... _____ . _______ ... --****.-----

...

.. --.... .., ..... _ .. .. **., . . . . '_ ., .. e REPORTABLE OCCURRENCES PERTAil8 TO , . ANY OUTAGE OR POWER REDUC IONS . ..... NOVEUBER, 1978 Unit l power was reduced on November 8, 197& as a result of the failure to complete incore-excore instrument calibration.

This event is discussed fully in LER-78-038/031-0.

Unit lfo. l power was reduced on November 29, *1978 as a result of a reduced concentration in boric acid storage tank 1-CH-TK-lA.

LER-18-043f-03L-0 discusses this occurrence more . , :. _ ... .,., -: .. . -*::: _.-. *,* -** .. **.* '** . . -. -.-*.. . :" <" * . .. '"'. * .. *: .. ,. __ , ' .: -.. : : . . . . . ' '.(_.' . *.'* *.*. .. . : . ... *.I I I* I . . .. c .(. .. c -------.----------*


*-----24-:. Mainter+ance of Safety.Related Systems During Outage or Reduced Power*Periods UNIT Ill Mechanical Maintenance

' ... .. * ... -.

... Mechanical Maintenance-*

UNIT r c There was none during this reporting period. ,,o -( L: .-:. (5 1. \.

  • , ... ( c of Safety Related Systems During Outage or Reduced Power Periods UNIT f/2 Mechanical Maintenance

,..,----...,...---------,-----c--


,-.-... Mechanical Maintenance UNIT 2 There was none during this reporting period. [:;. . .._

.. . ' ( (. c . * .... e. Maintenance of Safety*Related Systems During Power Periods Electrical Maintenance

.. .*.; . . , c ,... I c ------*---** ----*-----------.-*--***--------. . ' .. * ........ _

  • -**-----------

-*---;,.-*------

..

-'

  • .

-*-*: .. *"'.! Electrical Maintenance

  • :: . .. 3 ... UNIT 1 .. : .. ,"t"." .. **.* There was none during this reporting period. .* .. .. * .. *.::*

---.... -: ( r ( . ' *' Maintenance of Safety Related Systems.During Outage*or Reduced Power Periods UNIT #2 Electrical Maintenance

' .. '

'* .. :.* . *. Electrical Maintenance UNIT 2 There was none during this reporting period.

.,._::,,' " .. > "' '* .. ( /" ' ' c-*., c ----*-----



* **--------*---

Maintenance of Safety Related Systems During Outage or Reduced Power*Periods UNIT #1 Instrument Maintenance

---...-.--*--( ( (, ,_..,*.J.\*.***.I

' .* ,.,* c -------------------*----*--

--*-----**----


*-*---**-----------------**!

... ,,. Maintenance e .-UNIT l There none during this reporting period.

.--. c ! ,, ** 4 > *' t I . '. *-.-.. ___ ... _____ --**--**:

  • Maintenance of Safety Related Systems During Outage or Reduced Periods UNIT #2 Ins*trument Maintenance
    • ... ... ' ..
  • Instrument Maintenance
  • ' ' UNIT 2 There was none during this reporting period.

,.; .* I* * ) ."*.*****

-_ *., *:;*.* *----.. ":' -.---HEALTH PHYSICS NOVEMBER, i978 There was no single release of radioactivity specifically that accounted for more than 10% of the allowable annual values in 10CFR20. _ There were no individuals who received single radiation exposure which accounted for more than 10% of .the allowable annual values in 10CFR20. lOL -I

-. . --. . -------.e-* .

-*.:**-----*-.-

--*:*** .. -.****

  • ----. ----* --.. *--*-*-.----

...

.. : . .. .. ,; i. ** "' ' * .-. ** , ' I Uumber . .* . . .* . . . . .* .. . PR.URE DEVIATIONS REVIEWED BY . ST-ON NUCLEAR . SAFETY AND OPERATING COHUITTEE AFTER TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS HOVEMBER, 19.78 Unit Title

  • Deviation UUP-C-G-004 Spare Repair of Replacement of Worn or Defective Pump Internals Rand Inliner Pumps Steps 3.-4.1, 3.4 *. 2, .3.5, 4.1, 5.2, 5.6.1, 6.0 -*.Not required.

OP-5.1

  • 1 02708107 . Filling and Venting the RCS Steps and 4.2.28 not completed.