Monthly Oper Rept for Nov 1978
ML18113A712
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/01/1978
From: Kane G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18113A711 List:
References
NUDOCS 7812200262
Download: ML18113A712 (40)


Text


**------------***----, ---~ -*-***-**---*-----*--- *--*** - ---- -*-*

, . \ r ..

1 '" .... J. ,,

I VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION

~-*

MOUTHLY OPERATING REPORT REPORT NO. 78-11 NOVEUBER, 1978 Superintendent-Station Ope~ations APPROVED:

T.7.~*-*

' MANAGER 7 B122002G;z._

I I

l

. * ~r

  • '1 .. " -i-COlITEHTS Section Page Key Personnel Changes 1 Operating Data Report Unit !fl 2 Operating Data Reprot Unit //2 3 Unit Shutdowns and Power Reductions - Unit #1 4 Unit Shutdowns and Power Reductions 5 Unit /12 6

Load Reductions Due to Environmental Restrictions - Unit #1 7

Load Reductions Due to Environmental Restrictions.- Unit 112 8

Average Daily Unit Power Level - Unit #1 Average Daily Unit Power Level ~ Unit #2 9 Summary of Operating Experience 10 Amendments to Facility Lic.ense or Technical Specifications 11 Facility Changes Requiring NRC Approval . 12

. Facility Changes That Did Not Require NRC Approval.- 12 Tests and Experiments Requiring URC Approval 13 Tests and Experiments That Did Not Require NRC Approval 13 Other Changes~ Tests and Experiments 14 Chemistry Report 15 Description of All Instances Where Thermal Discharge Limits 16

. Were Exceeded Fuel Handling 17 Procedure Revisions That Changed the Operating Mode Described In 20 The FSli.R Description of Periodic Tests Which Were Not Completed Within The 21 Time Limits Specified In Technical Specifications  :.,1_

Inservice Inspection 22 Reportable Occurrences Pertaining to Any Outage or Power Reductions 23 Maintenance of Safety Related Systems During Outage or Reduced Power 24 Periods - Unit ill - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power 26 Periods - Unit f.!2 - Uechanical Maintenance

r.fl

-ii-

. .. .t

  • Section , .,,-,*.
  • _._Page

.J_*,**

  • .Maintenance of Safety Related Systems During Outage or Reduced 28 Power Periods - Unit Ill - Electrical Maintenance . , ..

Maintenance of Safety Related Systems During Outage or Reduced .*. 30

  • *. Power Periods - Unit f/2 - Electrical .Maintenance . .
  • Maintenance of Safety Related Systems During.Outage or Reduced 32 Power Periods - Unit #1 - Instrument Maintenance * ...... , .***'

?1aintenance of Safety Related Systems During Outage or Reduced 34 Power Periods - Unit 112 - Instrument Maintenance  : **,*:*

Health.* Physics Summa;ry 36.

Procedure Deviations reviewed by Station Nuclear Safety and  :..

37 Operating Committee after Time Limits Specified in T~S.

.. . . - .. ' ... **~*~ ~ .

/ '; --~

. ~* *...

    • 1
  • ,* .* .. ~ .

. <<  : __ t

.' . -~ ~'..:; *.-:*-. - .:.*'*- -**

' .11  ! "

a KEY PERSONNEL CHANG.

NOVEMBER, 1978 The following key personnel changes.were affected November l, 1978:

Position Supervisor, Mechanical D. S. Taylor transferred to Maintenance Corporate Offices.

J. W. Patrick appointed.

Supervisor, Engineering L. A. Johnson transferred to Services Corporate Offices.

T. A. Peebles appointedo

.. *~ '

_\; .-,.. r

~ .. .  :'* .!'.:

    • . O;E.~ . *NG. DAT.4 REPORT
  • ** L *. , *** :

DOCKET NO.** so-2eo ,.

DATE*04 DEC 7e COMPLETED BI O.J. COSTELLO *;-,*. .>

. ' TELEPHONE ~OU-357-31e4 I.'**.

OPEP.ATZ!VG STATUS .. ***.

~-------- ---~-~ .,

  • :.*.. . 1. U liIT li Al1E SURRY UNIT. 1 .
2. RE?ORT:NG PERIOD 0001 781101-2400 7!1130

.. 3. i::ENSED THERMAL PO~ER (MWT). 2441 * ! --------.---------~------,'

I . t

  • 4.
  • NA!".fEP LATE RATING ~.GROSS MW'B) '347.5 !NOTES .I .
-.. 5. DSE
Gll ELECTE.:C AL :?.4TING (NET MiiE) ~ 22 . _*. ll. . . . ._....* . .I . : { . *:

~* 5. ~AZ!~UM DEPENDABLE CAPAC:TY (GEOSS MWE) ~ 1 1 .

7. UAX:.'!U!! DEPENDABLE CAPAC!TI \NET i'dWE) . 775 . l _ _-.,._._________ l .

'3. IF C!i:.ilGES OCCUR !N CAPAC!TY RATINGS NIA *

' . '(I:n::.is 3 THROUGH 7) S!NC E LAST .. : ,* ..

, >REPORT. G:vs REASONS ' '.~ .. ' .. "'

1.**
::*'.. '.':

'. *. 9. POWER LEVEL TO VIHICH RESTRICTED~ IF ANY NIA

... * . (NET f.!wE)

10. REASOOS FOR RESTR!CTIONSg IF ANY Nii THIS MONTH YR-TO-DATE CUMULAT:VE

'. 11~ .HOURS IN P.EPORTING PERIOD 720.0 e016.0 52DSO.O.

12. NUMEE?. OF HOURS REACTOR WAS CRITICAL 720.0 6124.1 35441.0,

~ 13. REACTOR RESERVE SHUTDOWN HOURS o.o .o.o 0.0 ,'

  • 14. HOl.IRS GENERATOR ON-LINE 720.0
  • 6042.9. 34608.1
  • 15. UNIT RESERVE SHUTDOWN HOURS O.O 0.0. D.O
16. GROSS tBERMAL .!NERGI GENERATED (MWH) 1 7 4 s 7 7 e *o 14 es 1 o 7 e-,, o 7 9 1 7 2 o 7 2
  • o '.. -
  • . 17
  • GROSS ELECTRICiL ENERGY GENERATED (MWH) ss31es.o 4160110.0. 2e120013.o*
18. ll ET ELECTRIC AL ENERGY GEN'E:RATED (MW if) 535373.0
  • 452s120.o 2479~6e4.0
  • 19. UNIT SERVICE FACTOR 100.0 o/o 75.4 @lo E6.5 o/@
20. i;NIT AVAILAB'ILITI* FACTOR 100.0 olo 75.4 alo *se.5 *lo
  • 21. TJN!T CAPACITY FACTOR (USING MDC .VET) 9s . g o / o i 2 *. 9 o I o * ,.; e1 . 4 I o * .* * (I
22. UNIT CAPACITY FACTOR (USING DER llET) 90eS olo '*. 68.7 o/o 57.9 o/o
  • . 23. UN!T FORCED.OUTAGE RATE 0.0 0:2 o/t1 .*1s.s o/o
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS S/G INSPECTION i~2~79. 3 WEEKS *

(TIPE,DATE.AYD DURATION OF EACH)

25. IF SHUT DOWN AT !ND OF REPORT PERIOD.

ESTI!1ATE DATE OF STARTUP . . .

26. UNITS Ill TEST STATUS. . FORECAST ACHIEV~D C?R:OE '!0 COlo!UERCIAL OPERATION) ',"'

ZN:T!AL CRIT!CALITI . ~* . . .. ' .:.

INITIAL ELECTRIC!Tl COMMERCIAL OPERATIOU *

.:: .*.~*.-*.

.. ~- *_ .. ,

h,

. . I\.'

1* .

I I . ..

. ... ..~

~*

~

..O?~R ..4TZllG DATA lEPORT DOCKET NO. ~0-2~1 , ...

  • DATE 04 DEC 79 COMPLETED BY 0.J. COSTELLO TELEPEONE*904-357-31R4

. OPERAT:NG STATUS

~-------- ~----- .. *,:** .

1. fJN!T NAZ>!E . *... SURRY !J N!T 2
2. REPORTING PERIOD 0001 1e1101-2400 1e1130
3. LICENSED TEERMAL POWER CMWT)
  • 2441 ,----------~-------~-----,.
4. rl AMEP LATE RATING (GROSS MWE) 94 7. 5 I NOT ES .< . I
5. DESIGN ELECTR!CAL RATING {NET !~~IE) e22 . I -* *:I

.'=. MAXI:>WM DEP!NDABLE CAPACITY (GROSS MWE) 911 I . .. . I

7. l.JAX!!-tUM DEPENDABLE CAPACITY (NET MWE)
  • 775. '-----~---~------' .
e. IF CHANGES OCCUR !N CAPACITY RATINGS

._(ITEMS 3 THROUGH 7) SINCE LAST ' * ...

REPORT. GIVE REASONS ' '. ~* *.

c;i. POWER LEVEL TO*~H!CH RESTRICTED. IF AllY NIA.  :-***

(NET MWE)

  • 10. REASONS FOR RESTRICTIONS., IF ANI N/A THIS MONTH YR-TO~DATE Cl/MU LAT IVE.* .
11. HOURS IN REPORTING ~ERIOD 720.0 9016~0 48960.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.~. 6543.5 32956.3

~~13. REACTOR REStRVE SHUTDOWN HOURS 0.0 ~ o.o 0.0

.. 14. HOURS G'E:NERATOR ON-LINE 720.0 6~26.3 . 32455.2

15. UN!T RESERVE SHUTDOWN HOURS o.~
  • o.o o.o

.16. GROSS THERMAL ENERGY GENERATED (MWH) 1756774;0 1577~768.0 75489002.0

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 572245.o :sogoo20.o 24657414.0
18. NkT ELECTRICA~ ENERGY GENERATED (MW~) 544291.0 . 483321'L0 233S633S.*J
19. UNIT SERVICE FACTOR 100.0 o/o . 91.4 o/o '66.3 o/o
20. UNIT AVAILABILITY FACTOR 100.0 o/o .* 91.4 o/o
  • 66.3 o/o'
21. UNIT CAPACITY FACTOR (USING MDC NET) 97.5 o/o 77.e o/Q e1.e o/o
22. UNIT CAPACITY FACTOR (USING DER NET) 92.0 o/o
  • 73.4 o/o 58.1 o/o
23. UNIT FORCED ()!JTAGE RATE 0.0 2.1 o/o *:21.e o/o
24. 'SHUTDOWNS SCHEDULED OVER NEXT E MONTHS STEAM GENERATOR REPLACEMENT (TYPE,DATE,AND DURATION OF EA~H) 6 MONTHS 1-25~79

-25. IF SHUT DOWN AT END OF*REPQRT PERIOD, NIA '~ " '.

ESTIMATE DATE OF STARTUP

26. UNITS IN TEST STATUS  : FORECAST ACHIEVED .. :

(PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY Dl'ITI AL ELECTRICITY

. COMMERCIAL OPERATION

    • _5_~*_.:.2_0....0_'_ _.....__

-* * * ','

  • o't

-- DOCKET NO. >/.,

UNll" NAME Unit l

  • DATE 12-1-78 * !o >

COMrl.E.l"EI> llY G. Kane itErORT l\ION"Jll NOVEMBER 1978 1"1~1.EI llONE. (8011) 357-3184 A I*.*.*

ij Dale

- u p.

Uccm:ce l!ven*1

.~v_g P*o

    • Eu Cause & Cnrrtcllve
  • Acllun lu

~* Rcpoll # 0* rrevellt llecurrc1,ce u

-r

.* . .-" Ii None du . ing l hie. J!>er od. '!

ii 0 . i'

~* *,

I . cl

- i i

  • .' j' i'

. 'i

' . ' -., . : "'~  :' )

,, ~

  • 1!

... , .. 4 .*,I 3

r: w=mc:ed . i'ea~1)1n: .* *. . z.;* Methocl: ' Exhibit G

  • lnslrnctlo111 S: Schtdutcd /\-f:11ulpmc11i fulhue (!Exrlalnl I-Manual

for l'rr1,11r111lun ur Data **> . * .*

ll-Mnhulcnnnce oi Tua *. . 1-M:mu:ll Scram. Entry Sheets for l.kcnsee -. ' ..

\. r-llefucllng ' . ' ' ;, . J-Au1011111Uc Scram. Eve111 llepurl (Ll:nl nle INUREG* *~

tt

. D-Qtcgufo*ory UtcshlclDon * * *

  • 4-0llm (Explnln& *Ol6U N

." ~

t:-Opcv:11m Trnlnlng &. Uce1m1 E1u1mBm1tlon er

      • ~ . F-Admlnhlmlft'lc 5

. * (i-Ol'cr:etlmrnl Enor (Explmln) E:dslbll I

  • Samt Sotm:t * ' -..9 l U-O*hcr U:xa*l:dn), . .. *,: :ri:

. *.'I

    • . *., :f:*

-- ~:

50-281 " .-

DOCKE'f NO.

UNll' SHUTI>OWNS ANO l'O\'IEU IU!J>UC110NS Surry 2 UNIT NAME l>ATI! 12-1-78 irnroRT MONlU NOVEMBER 1978' cot.1r1.En~n nv G. Kane"' ~* .

U!l.EI llONn (8011) 357-3184

..c: '

c: .... l.lcimsce . V\ Cnuic & ("ou~cllve

.2 t? ~-o

~... U:11c -* ::J l' :I

J :c l!vcnl llcpu~I #
  • a*a 0*

Action ht rrevcnl llccurrcnce

.o-- u

' )

None ciuring tli- s peri 1d. _ I VI .

I '

".* .-. *. j. *' ,*

a:: 2:11ra:eci . Hc:mm:* McQfwtl: .Exhibit G - lnsl1i1cllon1 *

  • 5: 5d1td119ed A-i'.11*111pmen1 F111lme U~x'.g1h1~n) B-M:unia~ for l'rrl'atalltm ur Dat:a .

!Hfalnlen:mce oif TcsiO .* '2*Manual Scram.* EnlD)' Shtrls for l.ktnsre

  • 1

('.at1:r, ..~ung _,*.. ., . * ]-Aulmnallc Scram. l!vcnl ltrpml (U:IU nlr tNUltEG* * ; *~

. n-ll1:g11l:i1nry Btcshkth!n . 4-0lher (l!xpla!n& Ol6U

. I a: :opcrnlm Trnlnlnc & l.lc11ms~ n:111onlmi11lnn ,, - . ,- . *'-.

(

.J F-A1lmlnhhaGhe -

(;.n1'1!1:11lun:1l l'.11ur U~11pl:1lnt '. Exhlbll I

  • Samt Sn111&:t H 01hca U:xpl:aln, '*.

1;

.. . ~6- .

  • e.
  • 1 :

,. LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. i

  • MONTH: NOVEMBER, 1978 DATE TI!1E. HOURS LOAD, MW. REDUCTIONS, MW REASON .

I

  • NONE DURING THIS REPORTING P .RIOD.

MONTHLY TOTAL 0

  • , . ' ,: ,, .... ~ '*'.

.*..... ~ . *

\ ' ,

. ';.' *~ **.

LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS ., *. *' ~.

UNIT NO *. 2 * , MONTH: NOVEMBER, 197 8 ,,

TI11E HOURS LOAD, MW .. REDUCTIONS, UW REASON

.t'.

'.~ )

NONE DUR THIS REPORT~NG P IODe i,.

'1.

MONTHLY TOTAL 0

'*-**--- --*--.-~.'.-.

- . -----* __. _.~_:

. ~ :0° 50-2~0 *.* .

. \ *.

I

' . *~ *.

ur!!T ' SUP.P..Y : .*

' *' DI.TE.: 12-1-"'~ .

. COMPLETED 3Y :* a J COSTELLQ

. MON'!E: *:VCJTlEMBEE 197'3 '. :.

'; *., . i' AV~RAGE D~LY POWER LEVEL . AV!RAGE DAILI POWER LGVEL ..

DAY (KvlE-NET) DAY . U.JWE-NET)

- - -' ~ :* . .-

..... .1 751.0 16  ; 750. 9' 2 '* 750.9 17' 751.5*

3 750.0 1! '/ . 750.5 " - -**..

  • 751 ~ R ....
  • ~ 1so.e 19 . :*:. . . '., :, ~' -!,,.,

5 75.0 5 I 20 750 .s' -.; .

6* 74~.2 .21 ... *

., . ~

  • 127.9 . .. . '

7 747.e 22 **-.;-**

9 713.7 23 '* *-,'-' 132.2 9 720.3 24 ;11-e.2 10 749.e 25 749.2 11 150.9 26 146.5 . I

-- i 12 751.S 27 745.0 750.6 29 7~7.2 13 .:_ ...

..: . -*~ .

1<.!.* 7#9.0 29 "13@.5' '

, 15 "/49 ~e* 30 748.3 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS  ::* ..

ON THIS FORN.. L:::ST THE AVERAGE DJl.!LY UNIT POWER LEVEL IN l.fvlE-flET FOR. EACH DA'! !N

. TEE ::r.EPORTING MONTH. THESE FIGURES WILL EE USED TO PLOT A GRAPH FOR EAC.lf REPORT-***

I.VG .l.!ONTH. !vOTY: Tfi.4T 3Y USING MAXINUM DEP5NDABLE CAPACITY FOP. T'SE N-eT ELECTRICAL RATING OF THE uNIT. THERE MAY BE OCCASIONS WHEN THE DA::LY AVERAGE POWSR EXCEEDS THE 1~0 o/o LI!iE (OR THE .':f.ESTR.!CTED PO'ilER LEflEL LINE). IN SUC,fi C;4SSS. THE AVERA:rE Dl.ILY UNIT POf!ER OUTPUT SHEET SHOULD BE FOOTNOTED T,O EXPLAIN THE APP/..RENT Al70MALI *

.e D. D/C'E

,VQ.

    • UNIT . SUR.~ ::

50-2~1 12-1-"'~

COr.JPLETSD BY .OJ COSTELLO

.. :~ . AV'E:RAGE DA:[,Y U'N!T POW'E:R LETl'SL *

..*. ~-!CNTH: .NOV'SNBER 19n

.  ;~

    • AVERAGE !JA:LY ?OWER LEV!L AVERAGE DAZLY POWER LEVEL ._ .. *:,.

. DAY U>ftlE-NET) DAY U*f'llE-NET)

  • . ..a. 759.7 16 755.0 2 758.1 17 754.3

.* 3 759.* 4 18 754.~

.4 760.1 19 736. 7 .

5 7se.7 20 756.5 ...

e 156.7 21 751.4 757.e 22 'i4~.5

.e 754.6 \. 23 i'"

754.S

-~ 756 .. 0 . 24 755. 5 .

10 759.4 25 755. e 11 757.5 26 757.2 12 '159.5 27 758. 9 13 75*9. e 2e 758.2 * .....

  • .i' 14 7513.5 29 755.4 15 756.7 30 756.9

. l D~..IL1 UNIT POWER LET/EL FOR:~ INSTRUCTIONS ON THIS FORN. LIST THE AVERAGE DAILY UN!T POWER LEVEL IN ,\fllE-NET FOR EACH DAY IN THE REPOKI'ING MONTH. THESE FIGURES WILL BE USED TO PLOT A ~RAPH FOR EACH REPORT-ING .\fONTH. NOTE THAX BY USING l:1AXIMUU DEPENDABl,E CAPACITY FOR THE NET ELECTRICAL RATING OF THE UNIT. THERE MAY BE OCCASIONS NHEN THE DAILY AVERAGE POWER EXCEEDS TEE 100 °/ 0 LINE lOR THE RESTP..ICTED POWER LET/EL LINE). !N SUCH CASES. TEE AVZRAGE DAILY UNIT POWER OUTPUT SHEET SHOULD. BE FOOTNOTED TO EXPLAIN THE APPAR~NT ANOMALY.

.* e '

SUMMARY

OF OPERATING m E . '_

?lOVEMBER, 1978 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in sign-ificant non-load related incidents.

UNIT 1

  • November 1 This report period begins with the unit at 100% power. - i November 8 At 1120 power was reduced to 90%. The ineore/excore nuclear
    • .-. indication' calibration map was found to be out of date.

November 9 At 0915 the map results were found to be acceptable and load was increased to 100%.

November 10 - At 1433 during a switching operation in the switchyard #1 Auto Transformer failed.

November 21 At 1136 "B" High Pressure Drain Pump motor tripped on ground .I I

fault and "A" High Pressure Drain Pump showed low resistance cau~ing approximately 40 MWe reduction in output as a result of no High Pressure Drain P:iimps operating.

November 22 - At 0930 the "A" High Pressure Drain Pump was returned to-service.

At 1015 the load was reduced to 88% due to a secondary chemistry transient. This resulted from a high inleakage f~om condenser tube failures.

r~- ... November 23 - At 0457 returned unit to 100% power. The c'ondense'f inleakage was

. \.; stopped and chemistry stabilized. I November 29 - At 1120 a rampdown was commenced because "A'i BAST & BIT were low - . I in boron concentration. Primary grade water was inadvertantly introduced to the BAST. At 1250 with reactor power at approxi~*- : -. -

mately 80% the [CB] in the "B" BAST & BIT were returned to speci~

fication and a ramp~up was begun. At 1442 the unit was returned

  • * -eo 100% power.

' i November 30 - This.report period ends with the unit at 100% power.

UNIT 2 November 1 This report period begins with the unit*at 100% p<;>wer *

. November 19 - At 0140 a load reduction to load follow was begun at the request of system operator. At 0252 load was at 83% power. At 0445 a .

load increase was begun and at 0620 the unit was returned to iOO% power.

  • November 30 - This report period ends with the unit at 100% power.
. Af*1ENm s TO FACILITY LICENSE OR TECH~ SPECIFICATIOHS NOVEMBER, 1978 On 11-06-78 the Nuclear Regulatory Commission issued amendment No.

45 to the Operating Licenses for the Surry Power Station Unit Nos. l and 2, which are designated as Technical Specification Change No. 56. This change is the result of our request to revise the Non~Radiological Environ-mental Monitoring Program. Of significance are the following changes:

(1) Deletion of the biological monitoring program except fdr a low intensity fish sampling program.

(2) Reduction of the programs for temperature salinity and impingment monitoring.

(3) In addition, a correction _to page TS 6.4-7a is included which indicates fourteen (14) days ap the correct review period.

~

.. -12:

FAC IL I TY CHANGES REQUFI:

NRC APPROVAL NOVEMBER, 1978 None during this operating period.

FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL NOVEMBER, 1978 .

None during this reporting period~

~ . '~ ~ -**. **-**

.. ,, . *, ~~ '* ...

  • ~ "*.;.: .* ..
    • . :?~*::/~**.* ti~ !*;:.**

...... *~' .. ~

.e ,*

TESTS AND EXl?ERIHENTS REQ.ING NRC AP PROVAL NOVEMBER, 1978.

There were none during this reporting period

  • TEST AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL NOVEMBER, 1978 There were none during this reporting period"

.. -J.'t- .. :,

OTHER CHANGES, TESTS AND EXP~~lENTS

' ,:. ~-

NOVEMBER, 1978 ' .*.

There were none during this reporting period.

-~ .:

f ...

.. 7. .

  • . '** SURRY POWER STATION

~-

CHEMIS.'!RY REPORT .*

NOVEMBER, , 19 78 T.S.6.6.A.ll PRIMARY COOLANT UNIT NO. 1 UNIT NO. 2 ANALYSIS MAXIMUM MINnroM AVERAGE MAXIMDM MINIMUM AVERAGE Gross Radioact., µCi/ml 3.80E-1 2.05E-1 3.04E-l 1.86E-1 7.02E-2 l.07E-l ..

Suspended Solids, ppm 0.2 0.1 0.1 0.2 0.1 0.1 Gross Tritium, µCi/ml 2.38E-l l.95E-l 2.09E-l L64E-l 1.40E-l l.49E-l Iodine-131, µCi/ml 4.l8E-2 9.36E-4 9.36E-3 5.70E-4 l.92E-4 3.88E-4 I-131/I-133 0.8664 0.0775 0.3262 0.1372 0.0568 0.0931 Hydrogen, cc/kg* 38.0 25.5 30.6 39.7 25.2 30.1 Lithium, ppm 2.15 1.85 1.98

  • o.7o 0.25 0.42 Boron-10, ppm + ~26.4 116.0 121.4 *36.3 22.9 29.9 Oxygen-16, ppm 0.000 0.000 0.000 o.ooo d.000 o.ooo Chloride, ppm o. . os . 0.05 0.05 '0.05 0.05 o.os pH @ 25°C 6.92 .6 .68 6.81 7.10 6.24 6.89
  • + Boron-10 = Total Boron x 0.196 NON-RADIOACTIVE CHEMICAL

. RELEASES P. POUNDS

. T.S. 4.13.A.8 Phosphate o.o

  • Boron 508 Sulfate 278 Chromate __._0_7 _ _ _ _ _~

50% NaOH 350 Chlorine . O.O Remarks:


~~------~~------------------~~----~~~-

  • r.*

. ' , ~ DESCRIPTION OF ALL INSTAN **: ..-**

~HEIU1AL DISCHARGE LU1ITS WE .*_.'

NOVEMBER, 1978 ..... *..

Due to impail:ment.of the circulating water system on the following days the thermal Discharge limits were exceeded as noted.

November 1, 1978 Exceeded 17.5°F bT across station November 2, 1978 Exceeded 17.5°F tiT across station November 3, 1978 Exceeded 17.5°F liT across station November 4, 1978 Exceeded 17.5°F liT across station November 5, 1978 Exceeded 17.5°F /J.T across station November 6, 1978

  • Exceeded l7.5°F /J.T across station Novembe?:' 7, 1978 Exceeded 17.5°F /J.T across station November 8, 1978 Exceeded l.7 .5.°F /J.T across station November 9, 1978 Exceeded l7.5°F /J.T across station November 10, 1978 Exceeded 17.5~F /J.T across station November 11, 1978 Exceeded 17.5°F /J.T across station November 12, 1978
  • Exceeded 17 .5°F liT across sta.tion....

November 13, 1978

  • Exceeded 17.5°F /iT across station November 14, 1978 *
  • Exceeded 15.0°F liT across station November 15, 1978
  • Exceeded 15.0°F /iT across station November 16, 1978 *
  • Exceeded 17.5°F /J.T across station November 17, 1978
  • Exceeded 15.0°F liT across station November 18, 1978
  • Exceeded 17.5°F liT across station November 19, 1978
  • Exceeded 15.0°F /J.T across station November 20, 1978 Exceeded 15. 0°F'- /J.T across station November 2i, 1978 Exceeded l7.5°F tiT across station November 22, ..1978 Exceeded 17.5°F liT across station November 23, 1978
  • Exceeded 15.0°F /J.T across station November 24, 1978 Exceeded 17.5°F /J.T across station November 25, 1978
  • Exceeded 15.0°F /J.T across station November 26, 1978
  • Exceeded 15.0°F /J.T across station November 27, 1978
  • Exceeded 15.0°F liT across station November 28, 1978
  • Exceeded 15.0°F /J.T .across station November 29, 1978 ** Exceeded 15.0°F liT across station November 30, 1978
  • Exceeded 15.0°F 6T across station
  • Indicates dates where station ~Twas <15.0°F across the station for sometime during*~the day.

These tiT excursions were allowable under Technical Specifications 4.14.B.2.

There were no reported instances of significant adverse epvironmental impact.

On November 18, 1978 the temperature change at the station discharge exceeded 3°F per hour while returning station vacuum priming system to service on Unit l condenser waterboxes. This event was reported in accordance with Technical Speci-fications 4... 14.

FUEL HANDLING NOVEMBER, 1978 No fuel handling was done during this reporting period.

. I,

-~ -is- .*

  • -*,----*---.*--'-----_,.,..-:-.--:--*----- -uNIT-NO'. *1------- -------- -*--'----
-e UOVElIBER, 1978 FUEL HANDLING

..* e .:.* :*

DATE NO OF ANSI tm .. . NEW OR SPENT FUEL .*

SHIPPED/RECEIVED ASSEt-IBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL I

I'.

NONE DURING THIS REPORTING PERIOD.

I I

i

DATE NO .OF ANSI no.

SHIPPED/RECEIVED NEW OR SPEUT FUEL ASSEMBLIES PER.SHIPMENT . INITIAL ENRICm1ENT . SHIPPING CASK ACTIVITY LEVEL I

NONE DURINt; THIS REPORTING PE"RTOn

_..r:

_~

  • -------***-*-~---- ......... . -........ . ____

~ .

. ~ PROCEDURE REVISIONS THAT ~~ *.

OPERATING HODE DESCRIBED IN THE FSAR IJOVEMBER, 1978 Number Unit Title Change*

Annunciator 2 .PORV Lo Air Pressure New Procedure ZD-22

tlcRIPTION OF PERIODIC TESTS WH. WERE NOT J

COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS NOVEHBER, 1978 Number Title Comment Unit 22.4A Diesel No. 1 Refueling Inspection 1ER 78-040/031-0 l 22.4C Diesel No. 3 Refµeling Inspection LER 78-040/031-0* l.

... _ _ _ ...... *--~**-**----* - *----~* ... _ _. ____ * - - : . . - . - - - * * - - - - - - - - - - . - - - : * - * * - - * - . : _ . . . . _ . . __ -~* .. ------*..---~-- ...* - - *' t INSERVICE INSPECTIOU

  • J NOVEUBER, 1978 None during this reporting period.

...__,~----

--~----

-~ ...--****.----- ... ~--**---~- ....

e . . . '_ ., .. .

REPORTABLE OCCURRENCES PERTAil8 TO , . ' ~.

. i ANY OUTAGE OR POWER REDUC IONS NOVEUBER, 1978

'.(_.'

Unit No~ l power was reduced on November 8, 197& as a result of the failure to complete incore-excore instrument calibration. This event is discussed fully in LER-78-038/031-0.

Unit lfo. l power was reduced on November 29, *1978 as a result of a reduced concentration in boric acid storage tank 1-CH-TK-lA. LER-18-043f-03L-0 discusses this occurrence more completely~ . , :. _

. ~-*

~ -~

.,., -: .. ~ .

.: . ~ ...

  • .I

~. I

. .-~ .. .

' .: *~ -

c I*

I

' ... '~.. * ... - .

Mainter+ance of Safety.Related Systems During Outage or Reduced Power*Periods

.(. UNIT Ill Mechanical Maintenance c

... Mechanical Maintenance-*

UNIT r c There was none during this reporting period.

,,o

- (

L:

1.

(5 .-

\.

  • , ... (

~iaintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT f/2 Mechanical Maintenance c

,..,----...,...---------,-----c-- ----,-.-

... ~ Mechanical Maintenance ~

UNIT 2 There was none during this reporting period.

[:;.

~-. . .._

e.

(

Maintenance of Safety*Related Systems During Outage*o~*Reduced Power Periods

(. Electrical Maintenance c .


*-- ----*-- --- - -- ---.-*--***-------- ........ _ -~*** *-**-----------

-** -*---;,.-*------ .. -----~29..: - ' .~.--.*

  • . -~--*** ' .. *

- *-*: .. *"'.! .. 3...

Electrical Maintenance * :: .

UNIT 1

.. : .. ,"t"."

.. -~ c There was none during this reporting period. .* .. ~*

~. .

I c

(

Maintenance of Safety Related Systems.During Outage*or Reduced Power Periods r

~ UNIT #2

~-.

Electrical Maintenance

(

.*. Electrical Maintenance ~

UNIT 2 There was none during this reporting period.


*----- - - -- ~----*-*------ - - --* **--------*---

" .. -32~.

(

Maintenance of Safety Related Systems During Outage or Reduced Power*Periods

/"

c-'

UNIT #1 Instrument Maintenance c

... ,,. Inst~u::ient Maintenance e .-

UNIT l

( There ~as none during this reporting period.

(

(,

,_..,*.J.\*.***.I ' .* , . ,

  • c

~

,, ** 4

  • ' ~

t I c

Maintenance of Safety Related Systems During Outage or Reduced Po~er Periods UNIT #2 Ins*trument Maintenance

    • .. ' Instrument Maintenance UNIT 2 There was none during this reporting period.

,.; .

  • I* * )

-- HEALTH PHYSICS *---- .. " : '

NOVEMBER, i978 There was no single release of radioactivity specifically that accounted for more than 10% of the allowable annual values in 10CFR20. _

There were no individuals who received single radiation exposure which accounted for more than 10% of .the allowable annual values in 10CFR20. lOL

- I


.e-* .

-~-;-- .a.----**----.-*-*~- --,***-:.~*-. -*.:**-----*-.- -- *:*** . -.****

~--"'-*

  • ----.----* --..*--*-*-.---- . . -----~*-~*-:------

~-~---~*---*- .. .

. .. (~ .. ,; i. . .* . . .* . . .. .*. .
    • , ' I

. PR.URE DEVIATIONS REVIEWED BY . ST-ON NUCLEAR .

SAFETY AND OPERATING COHUITTEE AFTER TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS HOVEMBER, 19.78 Uumber Unit Title

  • Deviation UUP-C-G-004 Spare Repair of Replacement of Steps 3.-4.1, 3.4 *. 2, .3.5, Worn or Defective Pump 4.1, 5.2, 5.6.1, 6.0 -

Internals Ingersoll- *.Not required.

Rand Inliner Pumps 02708107 .

OP-5.1

  • 1 Filling and Venting the Steps 4~2.27 and 4.2.28 RCS not completed.