  • VIRGINIA ELECTRIC Ai.'ID POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 79-11 NOVEMBER, 19 79 APPROVED:

MANAGER ?912140 3 3g-

' If\ . , &) * -i -CONTENTS Section Page Operating Data Report -Unit /11 1-Operating Data Report -Unit #1 -Corrected Copy Month of October 1a Operating Data Report -Unit /F2 2 Unit Shutdowns and Power Reductions

-Unit #1 3 Unit Shutdowns and Power Reductions

-Unit #!-Corrected Copy Month of October 3a Unit Shutdowns and Power Reductions

-Unit /12 4 Load Reductions Due to Environmental Restrictions Unit 11.1 5 Load Reductions Due to Environmental Restrictions Unic /J.2 Average Daily Unit Power Level -Unit #1 Average Daily Unit Power Level -Unit /12 Summary of Opera.ting Experience Amendments to Facility Lic*ense or Technical Specifications Facility Changes Requiring NRC Approval Facility Changes That Did Not Require NRC Approval Tests and Experiments Requiring NRC Approval Tests and Experiments That Did Not Require NRC Approval Other Tests and Experiments Chemistry Report Description of All Instances Where Thermal Discharge Limits Were Exceeded Fuel Handling Procedure Revisions That Changed the Operating Mode Described In The FSAR Description of Periodic Tests Which Were Not Completed Within The Time Limits Specified In Technical Specifications Inservice Inspection Reportable Occurrences Pertaining to Any Outage or Power Reductions Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -Mechanical Maintenance 6 7 8 9 10 11 11 12 12 13 14 15 16 19 20 21 23 24 26 t\ Section

  • Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Electrical Maintenance Maintenance Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Instrument Maintenance Uaintenance of Safety Related Syst2m.S During Outage or Reduced Power Periods -Unit #2 -Instrument Maintenance Health Physics Summary Procedure Deviations reviewed by Station Nuclear Safety and Operating CoII!Illittee after Time Limits Specified in T.S. J . .. }>age 29 31 33 35 37 38

-" ------------------::J e OPERATING DATA REPORT DOCKET NO.

DATE 04 79 COMPLZTiD BY O.J. COSTELLO TELEPHONE OPERATING STATUS 1. UNIT NAUE 2o REPORTING PERIOD 3o LICENSED THERMAL POWER (MWT) 4. NAMEPLATE RATING (GROSS MWE) 5. DESIGN ELECTRICAL RATING (!iET MWE) 60 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 7. MAXIMUM DEPENDABiJE c APACITY (NET MrvE) 80 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST *REPORT; GIVE REASONS SURRY UNIT 1 . 791101 TO 791130 2441 1------------------------, 847.S !NOTES I e22 I I e 11 I I 775 NIA -**. 9o POWER LEVEL TO WHICH RESTRICTED 9 IF ANY NJA (NET MWE) 100 REASONS FOR RESTRICTIONS 9 IF ANY NJ.A 11e HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS RESERVE SHUTDOWN HOURS 14., HOURS GENERATOR ON.,LINE 15. UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWE) 17 & GROSS 'ELECTRIC AL tNERGY GENERATED (MWB) 180 NET ZN'E:RGI GENERATED (MWH) 190 UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 210 UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) 23. UNIT FORCED OUTAGE RATE 24a SHUTDOWNS OVER NEXT 6 MONTHS DURATION OF EACH) 25. IF SHUT DOWN AT END OF REPORT ESTIMATE DATE OF STARTUP 2E. UNITS IN. TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

CRITICALITY INITIAL ELECTRICITY OPERATION THIS MONTH CUMULATIVE 120.0 eo1e.o soe4o.o 120.0 2605.7 38305.e o.o 3500.9 3500.9 720.0 2600.1 37459.0 o.o 3504.6 3504.e 1748073.0 6270436.0 86626389.0 567000.0 2020220.0 28327803.0 539327.0 1919679.0 26891398.0 100.0 o/o oJo 61.6 o/o 100.0 ojo 76.2 o/o 67.3 o/o 96.7 oJo 30.9 o/o 57.Q o/o 91.1 o}o 29 0 1 o/o 53.8 o/o 0.0 E7.5 o/o 24.E ojo REFUELING JUNE 1980, e WEEKS N}A FORECAST ACHIEVED

'"

OPERAT.G DATA REPORT * .OR!tCTBJ mPY FOR f 1 DNTH 1 OF OCT ...

  • DOCKET NO.

DATE 27 NOV 19 COMPLETED BY O.J. COSTELLO TELEPHONE OPERATING ETATUS

1. UNIT NAME SURRY UNIT 1 2. REPORTING PERIOD 791001 TO 791031 3. LICENSED THERMAL POWER (MWT) 2441 1------------------------1 NAMEPLATE RATING (GROSE MWE) 847.5 INOTES I 5. DESIGN ELECTRICAL RATING (NET MWE) 822 I I MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)* 811-I f* 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) 775
a. IF CHANGES OCCUR IN CAPACITY RATINGP NIA (ITEMS 3 THROUGH 7) SINCE LAST GIVE REASONS 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY N)A (NET MWE) 100 REASONS FOR RESTRICTIONS, IF ANY NJA THIS MONTH CUMULATIVE
11. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL , 13. REACTOR RESERVE SHUTDOWN HOURS HqURS GENERATOR
15. UNIT RESERVE SHUTDOWN HOURS 16. GROSS THERMAL ENERGY GENERATED (MWH) 17. GROSS.ELECTRIC.AL ENERGY GENERATED (MWH) 18 NET ELECTRIC AL ENERGY GENERATED (MWH). 19. UNIT SERVICE /ACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) 23. UNIT FORCED OUTAGE RATE 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,DATE,AND DURATION OF EACH) 2 5. IF SHUT DOWN AT -END OF REPORT PERIOD, .. ESTIMATE DATE OF STARTUP !26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 745.0 172.i 572.9 168.4 576.6 362746.0 . 118 06 5. 0 112088.0 22e6 oj@ 100.0 ojo -19.4 o).o 18.3 o)o 77.3 o/o REFUELING, NOV. 20s 1 NIA 7296.0 60120.0 1885.7 37585.6 3500.9 3500.9 1880.1 "36739.0 3504.6 3504.6 4522363.0 1453220.0 27760803.0 1380352.0 26352071.0 25.8 o/o 61.1 o)o 73.8 o/o ee.9 ofo 24.4 ojo. 56.6 23.0 o/o 53 0 3 ojo 74.2 oJo 25.0 ojo FEB. 6 SNUBBER WEEK FORECAST ACHIEVED -_ __J "' \, OPERATING z9A REPORT DOCKET NO. DATE COMPLETED BY TELEPHONE OPERATING STATUS ---------------L UNIT NAME 2. REPORTING PERIOD 3. LICENSED THERMAL POWER (MWT) 4. NAMEPLATE RATING (GROSS MWE) 5. DESIGN ELECTRICAL RATING (NET MWZ) e. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) .1 *. MAXIMUM DEPENDA:BLE CAPACITY (NET MWE) 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 1) SINCE LAST REPORT 'P. GIVE REASONS

  • 04 DEC 79 O.J. COSTELLO 804':.'357!73184 SURRY UNIT 2 791101 TO 791130 -----2441 847.5 !NOTES I s:l"" l* I -...... 811 I I 7 7 5 '----__ .:_ _____ 1 N) A 9. POWER LEVEL TO WHICH RESTRICTEDs IF ANY N)A (NZT MWE) 10. REASONS FOR IF AN! 11. "HOURS IN REPORTING PERIOD 12 .. NUMBER-OF HOURS RZACTOR WAS CRITICAL .13. REACTOR SHUTDOWN HOURS ;,, 14. HOURS GENERATOR-ON<:tLINE
  • . 15. UNIT RESERVE SHUTDOWN HOURS 166 GROSS.THERMAL ENERGY GENERATED (MWH) 17 .. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18 .. NZT ELECTRICAL ENERGY GENERATED (MWH) 19. UNIT SZRVICE FACTOR 20. UNIT AVAILABILITY.FACTOR
21. UNIT CAPACITY FACTOR (USING MDC. NET)
  • 22. UNIT CAPACITY FACTOR (USING DER NET) 23. UNIT FORCED OUTAGE RATE 24 .. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,DATE,AND DURATION OF EACH) 25. IF SHUT DOWN AT ZND OF REPORT PERIOD, ESTIMATE DATE OF STARTUP *2e. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION N)A THIS MONTH CUMULATIVE 720 .. 0 eo1e.o 57720.0 o.o 81904 34499.9 o.o o.o o.o 0 .. 0 818.9 33996.2 OeO o.o o.o Q " 0 1957906.0 79194083.0 o.o 644305.0 2see8e44.0 o.o 611521.0 . 2 4 s. 3 .6 6 o. s

  • a o .. 0 10.2 ojo 58.9 o/ q a.a 10.2 0 /. 0 . 58. 9 o)o a.a 9.e o)o 54.9 0 I. 0 a.a 9.3 of o 51.7 o)o o.o o.o 21.0 o/o 5/5/80 FORECAST ACHIEVED

... : ilEPOllJ MOtflll . NOVEMBER, 1979 O""t. .... I. . 0 CY\. ] :1 r. 1-ictnsco ft* ._g 1J [I IL a Nu.

e--5 i!vcnt

  • o*" t-' J! . lli:pntt 1! ti) lJ ' "" : . u ---'. I No le during this 1 eporti1 g period. ' . --. . ] 3 F: F1111.:11!d
  • Ucason: Muth ml; S: Sd1t1J ulcci A*E11ulpmc11l Falluro (l!xplain)

I-Manual ll*Malnl1rna11cc oi 'l'csl . l*Mu1111al Scram.

  • f*ilcfucllng l*Aul11111;1llc Sc1am. . D-ltcltlliillUIY ltcal1kll11n . (

a: *Opcrn 111r Tlillnlnu

& l.1cc1uu l!xamlnallon l:*A1l111l 11lsl li1l l*1c . f;.Opcr:i1lu11al l:1111r W11plal11) 1Wn> II Othct Wt:1;f;1l11)

-.. *' .

  • I ' -DOCKET NO. so-280 UNIT NAMI! SURRY UNIT i UATE DEC. 1, 1979 COMPLETED llV O.J. COSTELLO (804) 357-3184 Cause & Cutm:llvc Ai:llun lu l'tc11c11l ftcc111rc11t:e e e --4 i!xhlhli n " Jml u11:1 l11111 for \)rcp:ui1ll1111 uf fh1:1 . -.

5111:cu fur 1.kcuscc 1!11c111 Hc11u11 L 1.E IU File WLJlll'.Ci*

OIMl .* . * ** . . 5 f.'<hihl1 I* !fa111t.l S1111u.'.:

.. . ----

-'Nu.

79-8 10-01-79 79-9 10-24-79 F: F111cc1I

  • S: Si:heJulcd

('J/'17) CORRECTED COPY .. ;j CORRECTED CDPY FDR f'ONlH .OF OCT a UNIT SllU"ITIOWNS AND row.en 'll!J)Ut'OONS . . . .. -.. ,. . . flEPOllT MOl'flll . ... ,_ ] JtH ..... .:! ..... :a 1 G => . .!! ' ..c -.. F 574e6 D 1 F 2* 11* 3 -Ucurn11: A-l:c111lpmcnl Falhuo (i!xplalit)

U .flfal11lcnancc oi Tc:.d *

  • f-llcfucllns . ; Uccnscc 'l!vcnl llc:putt Ii . IHtcuulnwry 1lca11 ktlun a;.Opi:rnhlf Trnlnl1111

& Ucc1uu l!xamlmallun F *A1l 111l 11ls11itl1*11:

(;.Opi:r;11lu11al l:1111t Wxl'li1ln'.

  • II 01 hut (I! xpl*1lnJ *
  • l OCT. 1979 ..,..*u . Maihcul3

-.... til u*o *u u

  • 2*Ma1111al Scram. l*Aulumatlc Scram. *l*(llhcr (Uxg1li1ln)

DOCK El" NO. 5 o-28 o . , SURRY 1 .,_. UNIT NAMI! l>ATE NOV. 2 1,979 COMl'l.ETEll llV 0. J. COSTEL TEI.El JIONI! (804) 357-3184 . Ciluu: & C1111cdlvc At:llun lu P1c:vc111 llci:1111Cl\cc

-Con.tiriuation of shutdown due to Sho** Cause Order issued by the NRC cancer ng possible error in piping stress analysis performed by Stone & Webster. The Show Cause Order was *modified Aug. I 22nd to allow interim operation when Ill required modifications are completed.

I began on 3/19/79.

tripped on feed flow/steam flow coincident with lo steam genera-tor level signal while feeding steam generqtors in manual during power increas following startup. -Hxhll.111 0

  • liulrn.:1111111 for l'11:l'ara1l1111 11r fhla .

y Sl11:1iu fur I .kcmec l!vcnl ltcpu11 (I.Ell\ File (NUlll:c;.

0 I li I) * .

  • s I */ . ' I i 'I

-:'-lu

  • 79-9 11-01-79 f: F1111.:c1i
  • S: Sd1tt.l11lcd f'l/17) UNIT SllU"IDOWNS AND rowen ,rnpuC-nONS . .. . . JtEronT MOtflll ..... s:: .... ':i e;4 l.lccnsco

.... . E tl 11*!1 a . ** -:I l!vcn& ] e: Q :I! -5 I-F llcpotl If

  • o-:c A ' .. /S 720 c 1 --Ucarnn: A*l:11ulpmc111 Fall1110 (l!xpiain) ll*M;1l11lenam:c ui Tcsl f
  • llc fueling . i>*Uci;11lilltuV Jlcall lc:ilun E*Opcrn1111 Trnlnlnu & l.li:c:mu l!xumlnallm*

l:*A1l 111l11l$I ra 1 l*1c ,;.nl'i:rilll1111i1l l:1111f W11plal11)

II (hhcr Wxpl*1l11) . .. l UOVEMBER 1979 -

ri; *g Ji*u u . Moihniix i 2-Manual Scram. l*Aulunlilllc Scrnm. 1 H>1hc:r (l!K!llillal) 50-281 UOCKErNO.

UNIT NA>.rn BATE llY llON II _..,..S-U-RR.,,...Y_U_N_,I_'r_2 Came&. f11t1tdlvc At:tlu11 10 l'tcvcnl ftci:1111cncc DEC. 1, 1979 O. J. COSTELLO (804)357-3184 e Continuation of shutdown for refueling and steam began on ., .. generator replacement 2/4/79. lixhllill Cl

  • 111111111:1111111 for 1'11:para1l11n uf Da1a . which I I '9 En11y Sl11:c:u for l.kcmcc . l!vcul ltcpu11 (I.Ell\ t=ilc (NUIU'.G-Olld, . * '" s I I

' . ** DATE Til1E --*-* ' ...!.*.'-*

.. LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO.l MONTH: NOVEMBER, 19 79 .1 HOURS LOAD 2 MW REDUCTIONS 2 MW MWH REASON I I --I I None during this reporting per od. . -.. ' MONTHLY TOTAL 0 ------. - .. LOAD DUE TO ENVIRONMENTAL RESTRICTIONS . UNIT NO. 2 MONTH: NOVEMBER, 1979 DATE TIME HOURS LOAD 2 MW. REDUCTJ;ONS 2 MW MWH REASON ----None du :ring this reportini period * . . .. << MONTHLY TOTAL 0 -* < .. ---*--- . ' . -DOCKET NO .280 , .. . UNIT SURRY I DATE 12':'1'lf79 COMPLETED BY 0 J COSTELLO AVERAQE DAILY UNIT POWER LEVEL MONTH: NOVEMBER 79 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWEwNET)

DAY (MWE"NET) 1 751.8 16 753.e 2 750.a 17 750.5 3 755.0 18 752.3 4 757.5 19 753.5 5 757 .. 7 . 20 752.7 e 753.,8 21 751.1 7 753.5 22 751.9 a 753 .. 9 23 751.3 9 756.5 24 753.0 10 682.,5 25 752.0 11 699 .. 5 26 751.8 12 75204 27 751 .. 1 13 755.a 28 750.11 14 758.2 29 749.8 15 755 .. 6 30 752.5 DAILY UNIT 'POWER LEVEL FORM INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT 'POWER LEVEL IN MWE!iNET FOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH P.EPORTTr ING MONTH. NOTE THAT BY USING MAXIMUM DEPENDABLE CAPACITY FOR THE NET ELECTRICAL RATING OF THE UNIT, THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS THE 100 oj.o LINE (OR THE RESTRICTED POWER LEVEL LINE) .. IN SUCH THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT AllOf.fALY. -----=- DOCKE1& UNIT DATE COMPLETED BY 50,,201 SURRY II 0 J COSTELLO AV?RAGE_ DAILX, VJll.X. POWER LEVEL, MONTH: NOVE!t!BER 79 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LF:VEL DAY CMWEt1NET)

DAY (MWE;rNET) 1 o .. o 1e . o.o 2 o.o 17 o.,o 3 a.a 18 0.;0 4 o. (} 19 o .. o 5 o.o 20 o .. o 6 OoO 21 o .. o 7 o.o 22. o.,o e OoO 23 OeO 9 o.a 24 o.,o 10 o.o 25 o .. o 11 o.o 2e o.o 12 o.,o 27 o .. o 13 o.o 28 o.o 14 o .. o 29 o.o 15 o.,o 30 o .. o .DAILY UNIT POWER EEVEL FORJ-t INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWE"INET FOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORT ... ING MONTH. NOTE THAX BY USING MAXIMUM DEPENDABLE CAPACITY FOR THE NET ELECTRICAL RATING OF THE UNIT 9 THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS THE 100. 0/0 LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMA.LY .. -*

SUMMARY

OF OPERATING EXPERIENCE

  • NOVEMBER, 1979 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in ficant non-load related incidents.

UNIT 1 November 1 November 2 November 3 November 10 November ll November 30 UNIT 2 November 1 November 30 This reporting period begins with the tmit at 100% power. Reduced reactor power to 99% while investigating validity of secondary calorimetric data. Evaluation of calorimetric datacompleted satisfactorily.

Reactor power raised to 100%. At 1158 indications of gross condenser tube leakage were received in the control room (i.e., the condensate sodium recorder "pegged" upscale).

Immediately, preparations were made to remove the leaking condenser waterbox from service and the steam generator (S/G) blowdown was increased to 65 gpm on all S/G's. Shortly after the waterb:ox with the highest leakage (as indicated by installed conquctivity cells) was removed, it became apparent that condenser tube leakage was not the source of sodium in the main condensate system. An investigation of possible sources commenced and at 1350 reactor power was reduced to 90% in an attempt to reduce sodium carryover in the , *;ain steam exiting. the S/G' s. The unit reached 90% power at 1445. At 1520 a further reduction to 75% power was .commenced.

At 1610 the sodium contamination source was eliminated.

The source was traced to the auxiliary steam drains and an improperly installed jumper hose. The unit reached 75% reactor power at 1700. At 0423 secondary chemistry had shown significant improvement and the decision was made to begin a power increase to 90% reactor power. The tmit reached 90% reactor power at 0535. Secondary chemistry continued to improve and at 0730 a reactor power increase to 100% began. At 0845 the unit reached 100% reactor power.

  • Th.is reporting period ends with the unit at 100% reactor power. This reporting period begins with the unit at cold all fuel removed from the reactor and steam generator ment in progress.

This reporting period ends with the unit at cold shutdown.

.AMEIIDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIOUS 11

  • NOVEMBER, 1979 e None during this reporting period.

.. . , . . t* FACILITY CHANGES NRC APPROVAL NOVEMBER, 1979 There were none during this reporting perio.d. FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL NOVEMBER , 19 79 There were none during this reporting period.

t **** TESTS AND EXPERilfENTS REQUIRING e NRC APPROVAL e NOVEMBER, 19 79 There were none during this reporting period * . TES.TS . .AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL 1979 There were none during i:lhis reporting period. ... :

OTHER CHANGES, TESTS AND EXPERIMENTS

  • .. , . ,:. e e NOVEMBER, 19 79 There were none during this reporting period.

-. .Le+-e --SURRY POWER STATION e * . .. . -CHEMI.5-TRY REPORT -. ' ---NOVEMBER ' 19 79 -T.. S. 6. 6 .A.11 . PRIMARY UNIT NO. 1 UNIT NO. 2 ANALYSIS MAXIMDM MINIMDM. AVERAGE MAXIMUM MINIMUM AVERAGE Gross Radioact., µCi/ml 5.26E-1 3.26E-1 4. 19E-1 2. 08E-2 l 8.72E-3 --Suspended Solids, ppm 0. 1 0.0 0. 1 0. l o. l 0. l Gross Tritium, µCi/ml 1 .36E-l 7 .33E-2 4.33E-2 * *

  • I-131/I-133 0.8301 0.2066 o.4190 * *
  • Hydrogen, cc/kg 40.2 -25.7 3 0.2 * ** * -Lithium, ppm 1 .03 0.60 0.83 * * * .. Boron-10, ppm + 78.8 6 2. 7 71.5 367.5 216 244 I .. .. .. . .. .. . . -I oxyg*en-16, 0.000 o.ooo 0 .000 4.0 LS 2.4 I ppm. Chloride,*

ppm 0.05 0.05 o.os 0.08 0.05 0.05 pH @ 25°C 6.99 6 .88 5.23 4.89 5" 10 * + Boron-10 = Total Boron x Ool96 . NON-RADIOACTIVE CHEMICAL RELEASES 2 POUNDS T.S. 4.13.A *. 8 Phosphate 0.0 Boron 268 Sulf aee 834 Chromate .24 50% NaOH 1.050 Chlorine 0.0 Remarks: *Unit #2 is in cold shutdown condition

-RHR System refi 1 led 11-21-79. .RIPTION OF ALL INSTANCES WHER. . . L D!SCllAR:GE t:t:m.Ts WERE EXCEE NOVEMBER., 19 79 Due to impairment of the circtilating water system on the following days the thermal discharge limits were exceeded as noted. November 1, 1979 *Exceeded 17.5° b.T across station November 2, 1979 . *Exceeded l7o5° b.T across station

  • NoveIIiber.

10, 1979 *Exceeded l5o0° LiT across station *:. November 27, 1979 *Exceeded 15.0° b.T across station November 28, 1979 *Exceeded 15.0° AT across station November 1979 *Exceeded 15.0° LiT across station *Indicates dates where station AT was <15.0°F across the station for sometime during the day. . .. ., .. *The LiT excursions*

were allowable

_t.mder Techncical Specifications 4.14.B.2.

There were no insta.nces of significant environmental impact. On November 10, 1979, the 'temperature change at the station discharge

'exceeded 3°F per hour while removing lB condenser waterbox from service

  • for suspected tube leakage. This event was reported in accordance with Technical Specifications 4ol4. -----l . i FUEL HANDLIUG NOVEMBER, 1979 There was no fuel received or shipped during this reporting . period.

--.t'age .LI ' . FUEL HANDLING . . . " , v ... -.:n:;*1, ig7q . ' DAIE NO OF ANSI. NO.

  • NEtV OR. SPENT FUEL. tl!IPPED/RECEIVED ASSEMBLIES PER SHIPMENT INITI.AI.

ENRICHMENT SHIPPING CASK ACTIVITY LEVE None durin: this reporting period. ' .. .. I -I I . . .. *-----*----*


*-*--. .. .. .. ... -

1.i!'LLJ.

L. Page E'UEI. . **

1979 .. * ' DATE NO OF ANSI NO. NEW OR SPENT FUEL UPPED/RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVE .. I I I None duringlthis reporting period. I I I ' ._ .... I I I .. *. ',I .. ----------


**


* --*-*-----.. . . --...

... .* PROCEDURE REVISIONS THAT CHANGED THE OPifl:NG MODE DESCRIBED IN THE FSt'I NOVEMBER, 1979 None during this reporting periodo l OF PERIODIC TESTS WH WERE NOT COMPLETED WITHIN THE TI.ME ITS SPECIFIED IN TECHNICAL SPECIFICATIONS NOVEMBER, 1979 The following monthly Periodic Tests were not conducted in August.

  • Subsequently these test have been completed satisfactorily.

NUMBER ET-24.4H ET-24.8 . . TITLE DESCRIPTION Fire Protection Systems QHose Houses) To check equipment and hydrants for operability.

_Fire Protection Systet!lS (Fire Lockers) To assure -loclcers contain: equipment on inventory and operability of gear. The following Periodic Tests were not completed within the time limits specified in the Technical Specificatio.ns.

PT-"38.11 PT-38.29 Prima:ry Coolant Crud Analysis was* not completed on Unit Ill when scheduled (11-9-79).

The test performs a radio chemical . analysis of the )reactor coolant to evaluate certain corrosion products present. The test was conducted on

_three days beyond the 25% grace period allowed. Service Air and Breathing Air Compressor Sampling on Unit Ill was not conducted when scheduled The test is to assure the quality of air used in .. self contained breathing apparatus, respirators, hoods, and suits meets required specifications.

This sem:i-annual.

test was conducted on three (3) months beyond the 25% grace period. When conducted, the test indicated the air fulfilled specified requirements.

t.* . .. .* . INSERVICE INSPECTION NOVEMBER, 1979 .. The Unit 112 radiography of the feedwater lines (IE Bulletin 79-13. Revision 2) was completed.

One weld (117) on :rA" Steam Generator line was rejected (small area of porosity).

This weld was repaired and accepted.

All other welds were accepted.

Several of the welds on the feedwater lines were replaced as part of the S/G Replacement Project. These welds-were prior to the IE Bulletin 79-13 implementation in Unit #2.

information on the original w=lds was unobtainable.

All new welds were radiographed to the S/G ReFlacement Project construction code in force and not to the requirements of IE Bulletin The monthly visual inspections required by IE Bulletin 79-17 Revision 1 (Pipe cracks in stagnant borated water systems) is in _progress in both Units .1an,d2 *. No rejectable indications have beep. reported at this time. The inspection is still in progresso DEPl'=NDT RETSERVDT sxs COMP 11)20,479 CH PIPING U/21}79 FW PIPING 11)21179 E'll PIPING U/2!/79 E'W PIPING DEPT TOTAL .. 3 DEC 79 2116 PM PAGE 5 llNIT2d.2J03)79 (MAINTENANCE OF SAFE2'Y RELATED SYSTEMS DURING OUTAGE OR REDUCED )'OWER PERIODS) MARKNO .

SUMMARY

llKPERF lJ MR TOTDWNTM 3AI! CH11'106d50 BEHOVE ARC STRIKE REMOVED ARC STRIKE PERFORMED EXAM 2 9110921*15 120 111*h'FPDd09*60 .ND'l' E'EE'DWATE:R PIPING NO REJECTABLE INDICATIONS 2 9072'10030 2856 1'1,,lt'E'PD-117*60 NDl' E'EE'DWA2'b'R Pll'ING ONE REJECTAbZR WELD*REPAIRED 2 9072*10032 2056 1'l*WFPDd13*60 NDT FEE'WATER PIPING NO REJECTABLE INDICATIONS 2 907270033 2856 ....... 8680 I N N I

.. * .. REPORTABLE OCCURRENCES PERTAINING TO OUTAGE OR POWER REDUCTIONS NOVEMBER, 1979 There were none during this reporting period.

10*-' -. -.. ,,.... .. _ , ' J Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT /Fl Mechanical Maintenance.

. . .. UNIT /Fl Mechanical Maintenance None during this reporting period.

0 -.26.--;* Maintenance of Safety Related Systems During Outage or Reduced Power.Periods UNIT *tn Mechanical Maintenance DEP'l'=MECH 3 DEC 79 "' 2116 PM PAGE 1 : UNIT2"12/03J79 (MAINTENANCE OF SAFET't RELATED SYSTE.'MS DURING OIJTAGE OR REDUCED POWER PERIODS) ,* RE'l'SENVD'l' SIS COMP NARKNO SUMMARlf WKPERF lJ MR T01'WNTM 11/01J79 Ill COMPRESS 2 .. IA.Cwt OIL LEAK REPAIRED OIL LEAK 2 910221117 206 U/02/79 EE COMPRESS EOG 2 LIFT INNERSTAGE RELIEF VALVE REPLACED INTAKE AND DISCHARGE VALVES 2 905110415 29 11)02)79 PR SNUBBER 2"RCwHSSd37 REBUILD SNUBBER WITH EP MATERIAL REBUILT SNUBBER 2 905161530 11054 11/02J79 PR SNUBBER 2*RC,.HSSd36 REBUILD SNUBBER WUH EP MATERIAL REBUILT SNUBBER 2 905161531 11054 11/.02/79 PR SNUBBER 2t!HC.HSSd35 REBUILD SNUBBER WITH EP MATERIAL REBUILT SNUBBER 2 9051E1532

'1056 11/02J79 PR* SNUBBER 2'1RC*HSS*131J REBUILD SNUBBER WITH EP MATERIAL REBUILT SNUBBER 2 905161533 3213 u.102}79 PR SNUBBER. 2wRC*IISS'I0133 REBUILD SNUBBER 1112'/J EP HA2'ERIAL

3213 11/02)79 PR SNUBBER 2*RCw/JSSd21 REBUILD. SNUBBER WITH EPMATERIAL REllUILT SNUBBER 2 9051615'10 3213 11/Ci2179 PR SNUBBER 2wRCwHSSd.26 REBUILD SNUBBER WITH EPMATERIAL REBUILT SNUBBER 2 905161541 3216 11/0SJ79 MS VALVE GAGE.' SAFETl VALVES CO/o!PLE2'ED 2 9110111355 2 11/0E/79 FW PMP H2'R 2wE'W .. Pt!3B NO LEAK OFF 2'1/RUST BEARING+PACKING ADJUSTED 2 911042204 211 11107/79 RH VALVE 2*RHn2 DC 79*05 REPLACE STUDS WITH IJ16SS VALVE BONNET WAS NOT REMOVED 2 9102111000 160 11/07179 RH 'IALllE 2wR1/*8 DC REPLACE STUDS WITH IJ16SS VALVE BONNET WAS NOT REMOVED 2 9102'11001 160 11/07J79 RH VALVK 2.,R/Jw21J DC 79*05 REPLACE STUDS WITH 416SS VALVE BONNET WAS NOT RE/olOVED 2 910241005 163 11/07)79 RH VALVE MOVwRHw2120JJ DC 79*05 REPLACE STUDS WITH lt16SS VALVE BONNET WAS NOT REMOVED 2 91021J1007 1116 11J.07J79 RH VALVE MOV.R/Jw2120B DC 7!!n05 REPLACE S'1'UDS WITH 1!16SS . VALVE BONNET WAS NOT REMOVED 2 910241008 1116 ......,, 11/07/.79 SI VALVE 2nSI .. 1111 REPLACE STllDS REPLACE STUDS 2 911061503 11 I 11/13/.79 cc PUMP 2.cc.F..ic EXCESSIVE AXIAL MOVEf..IENT RBDUILT l'U/.JP 2 9100023115 792 11/13)79 SI VALVE 2wSid30

  • REPLACF; S'l'UlJS REMOVED OLD STUIJS+REPLACED UPGRADED 2 911061502 120 11/14179 CH VALVE 2*C/Jrr263 VALVE HANDWHEEL SHEARED AND REMOVED REPLACED VALVE HAND WHEEL 2 908182105 5 11}15.'79 DG VALVE 2*00w10 REPLACE DIAPllRAGM REPAIRED VLV 2 902161003 27117 11)15,179 DG VAL.VE 2 .. Da.110 REPLACE DIAPHRAGM R8l'LACED DIAPHRAGM 2 90216100*1 27'17 1111s;19 DG VALVE 2*DG.,!i0 REPLACE DIAPHRAGM REPLACED DIAPHRAGM 2 902161005 27*17 11/15/79 VG VALVE 2*DGn51 REPLACE DIAPHRAGM Rf.'PLACED DJAPllRAGM 2 902161006 27'17
  • 11115/'/9 DG VALVE 2"VG*611 REPLACE DIAl'IJRAGM REPAIRED VLV 2 902161017 27117 11)16179 VG VALVE 211DG .. 59 DIAPl/RAGN REPLACE DJAPH VALVE PHOGRAM 2 902161013 2770 11h6fi7!1 00 VALVE 2"DG,.60 Rf.'PLACS DI APllRAGM REPl.ACE DI/lPllRAGM VALVE PROGRtW 2 9021610111 2770 11}161'19 DG V1ILVE 2rDG.,.12 RE.'PLACE DI APllRAGM REPLACE DIAPllRAGM VALVE PROGRIJ.I 2 902161020 2770 e 11/16/7S DG VALV8 2 .. Da.,1s REPLACE DIAPHRAGM REPLACE DIAPH VALVE PROGRAM 2 902161022 2770 11/16)79 DG l'ALVE 2wDG .. 76 REPLACE DI APilR AGM REPLACE DIAP/J VALVE PROGRAM 2 902161023 2770 11/16/79 DG VALVE 2rDGri71 RE.'PLACE.'

DI APHRADM REPLACE DIAPll VALVE PROGRAM 2 9021610211 2770 11/16179 DG VALVE 2"va .. eo RE.'PLACE DI.4PHHllGM Rf.PLACE DIAPHllAGM VALVE PROGRAM 2 902161025 2770 11/tt:/.79 DG VALVE 2 .. 00.eG REPLAC"8 DIAPHRAGM

'REPLACE DIAPHRAGM VALVE PROGRAM 2 902161029 2770 11/16)79 RI/ VALVE 2wRf;.,23 INSn:cr VAiVE INSPECTED VALVE 2 90et71615

  • 10 11/.1'JJ79 DG VAL.VE

.. s*1 III APHRAGM REPLACED DIAPllRAGM 2 90216101!1 27 1 17 11/20/79 Cl/ VALVE 2 .. c11 .. :io9 *LE:AK.S THHU ON PT16. I! REPAIRED VALVE 2 907101130 2'1 11120/79 Cll VALVE HCV112310A REPAIR POSITION INDICATOR ADJUSTED :l 911160805 5 11/20179 C/J VALVE FCV112160 POS2'10N INlllCA2'0R Rfi:PAIRED 2 911160806 5 11/20/79 CIJ VALVE llCV;i2"11 RE:blIH POSI2'IO.V ON 11/DICATOR

  • 1 ADJUSTED 2 911160808 5 11}21/79 :JI VAT.VE 2.s.r .. 109 REPLACE S2'UDS REPLACED S-l'UO:J 2 911061501 1108 11l21J79 cc l1'iSJ'R FI 111:c .. 21aB 1Nt1'ALL fl,01/ INDICATOR REPAIRE.'D 2 9112001!21!

1 11/22/79 cc VA/,VE 2 .. cc .. 9ss llALl'E l:J MISS.ING IJANDYIJEEL VALVE HANIMl/EEL 2 911200821 37 ..... \ !.. _,_:. ------*--*-* --------------

DEPl'=MECH RETSERVl11 sxs COMP 11.J2EJ.7!ll SI VALVE 11J2eJ79 Sl VALVE 11/26J79 SI VALVE 11/26179 SI VALVE un6n9 SI VALV8 HJ26/79 SI VALVE UJ27179 RC 'llALVE 11J21ns RC VALVE 11)27179 CH l'UMP 11)28,179 SI VALVE 11J21!,l79 SI VALVE 11}29J79 SI VAL'IB 11}29}79 SI VALVE 11/29)79 BR VALVE 12J01J79 BR PUMP DEPT TOTAL .{ ., f/NI'r2d2/03/79 (MAINTENANCE OF SAFETY RELATED SXSTEMS DURING OUTAGE OR REDUCED POYER PERIODS) MARKNO SUMMAR! WKPERF 2nSI .. e5 RE'PLACE S'l'UDS REPLACED S'l'UDS 2.sr .. 211a R/i.'l'LACE REPLACED STUDS 211Siw2'10 REPLACE S'J.'UIJS REPLACED STUDS 2.s.r.2ii2 REPLACE S'.l'UDS REPLACED WITH UPGRADED STUDS 2*Siw9'1 REPLACE S'l'UDS REPLACED ST/JDS 3 DEC 79 2116 PM PAGE 2 lJ HR 7'0TDWNTM 2 911131015 169 2 911131016 tee 2 911131010 161! *2 911131020 111ii 2 911131025 160 2*8111230 REl 1 LACE S'l'IJDS REPLACED WI2'H UPGRADED BOLTS+NUTS 2 911131026 1'1'1 2wRC1111fll.

REPLACE STUDS REPLACED SWDS 2 911051620 501 2 .. RCd58 REPLACE S'.l'UDS REPLACED STUDS 2 911051622 507 2wCHwPw2C REPAIR OIL LEAK ON SIGHT GLASS REPLACED OIL FEEDER 2 9112'10535 5 211Siw02 REPLACE STUDS REPLACED DEGRADED S'rUDS+NUTS 2 911131019 192 2wSI.08 REPLACE S'rUDS REPLACED DEGRADED STUDS+NUTS 2 911131023 192 2JJSiw91 REPLACE S'J.'UDS REPLACED STUDS 2 911131021 31 2wSiw239 REPLN:E STUDS RE.'PLACB

°s'IUDS 2 911131022 3'l MOVwBRdOtB REPACK REPACKED VALVE 2 91127111113 25 BR11PdA INLET+ DISCHARGE FLANGES.LEAK.

REPAIRED 2 91127111115 26 ...........

  • e I I N 00 ! *,) ** I 0 Maintenance of Safety Related Systems During Outage or.Reduced Power* Periods UNIT !Fl Electrical Maintenance

.-1


,..--::-:-*,*

UNI'l'1w12/03J79 (MAINTENANCE OF SAFETK RELATED SYS'l'll'MS DURING OUTAGE OR REDUCED POWER PERIOIJS)

RETSENVTYf S'JS COMP MARKNO SUMMARJ! llKPERF U/19J79 CH INS'IR DEf'ECTIVE RELAX REPLACE COIL DEPT TOTAL 3 DEC 79 2:14 PM PAGE 1 MR 1'01'DWN1'M i 9111411lli6 120 120 I w 0 n 0 .. . . 0 ... .. -.. ..

  • Maintenance of Safety Related Systems During or Reduced Power Periods UNIT IFZ Electrical Maintenance DEP.r=ELEC RETSENVIY.A' sxs COMP 11/02/79 EPDC CHARGER U/03/7!!1 EPDC CHARGE U./05/79 MDV U/05/79 SW MDV 11}05)79 CH PUMP U/06J79 FW MOV 11/111/79 CH HT 11/14/79 CH HT 11/19/79 Cll MOV HJ19J79 EPDC BA7'1' 11/21179 CH MOY 11/26J79 CH MOV 11nen9 RC VALVE 11J2BJ79 RC VALVE DEPI 'J'OTAL 3 DEC 79
  • 2116 H/ IJNIT2d2J03/79 (MAINTENANCE OF SAl'E1'Y RELATED SXSTEMS DURING OUTAGE OR REDUCED POWER PERIODS) MARKNO SU/.JMAR'i WKPERF u Mil 2A2 CllA'CK f'Oli INSULll7'ION DliEAK!J<MN cm:CJCED WIRING TESTED SllT 2 9052311130 28111 INSTALL NE:W CAl'ACITORS

!Nb'TALLED NEW CAPACITORS LOAD TESTED 2 910290725 HOVwSJlw2061i

  1. IOV l'MS COMPLETED AS PER EMP1tPnMov

.. q5 2 901251535 MOVnSW*206B MOV l'HS COMPLETED AS PER KMP .. l'*MOV"q5 2 901251536 2wCllwPd8 AUX OIL 7'11EliMALS OUT LOAD CHECKED SAT 2 909290210 MOVwE'Jln251D MOV PHS COMPLETED AS PER EMP*l'n/.lOVwqS 2 9012511109 PNLU..6 UN ALARM ALARM HAD CLEARED 2 911111010 PNL8w6 LOW ALARM ALANM HAD CLEARE.'D 2 911111811 MOV*Cllw2310 DISCONNECT FOR MECHANIC COMPLETED AS PR EMPwCnMOVn11 2 903002151 PERFORM P'l'. 23, IJAI COMPLETED E/.IP*P*EPDC1t'lll PT 23. S 2 911091*100 MOV*2310 HOV PMS COMPLETED AS PER EAfp,.p.,./.fOVwll5 2 9012511t56 DISCONNECT FOR MECH MOVe2286B VIXONNECTEDtHECONNECTED 2'ESTEO SAT 2 900190951t HCVwRCw2556C CONNECT SOV TESTED VALVE VALVE TESTED OK 2 911201331 HCVnRCw2551C CONNECT SOV TES'l'ED VALVE JI LV TES'J' OK 2 911201331t PAGE 3 TOTWNTM llO 100 6600 1600 792 6504 26 26 51100 33 6725 173 10*1 1811 ...... """ ****** * -I w !'.) I _;I

  • I 1'" -'

_r1 v 0 ----JJ-*9 Maintenance of Safety *Related Systems During Outage or Reduced Power UNIT Ill Instrument Maintenance

    • , fill UNIT /Fl e Instrument Maintenance None during this reporting period.

'. *1* * .. d\ 'd Maintenance of Safety Related* Systems During Outage or Reduced Power Periods UNIT ff2 Instrument 1-f...a.intenance DEFJ'=INST IJNI'12d2}03/79 (MAINTENANCE OF SAFE'11 RELA'IED SXSTEHS DURING OUTAGE OR REDlJCED POWER PERIODS) RETSERVO'f SJ!S COMP MARKNO Sl/NMARX llKPERF U/07}79 RC INSR CALIBRATE PRESS '1RANSNI2"J'ER CALIBRATED TRANSMITTERS UJ21A79 Gii INS'l'R H2"Gll*203 COMPLETE CALIDRKI'ION CAL+OP CHECK 11/29/79 RH INSTR FCVlllRH-2605 REPAIR VALVE REPLACED RELAX ADJl/S'.rMENT E/P DEPJ' TOTAL 3 DEC 79

  • 2116 PM PAGE IJ lJ /.IR TOTWN7W 2 911060000 30 2 9111111051 11111 2 9112'11200 911 2E9 -I w C\ ! ,. .. ...,; -

* 4 . '""!'\ ...

  • fl. <<, ' ---------------

---___ --HEA11'H--PHYSICS -------NOVEMBER, 1979 There was no single release of radioactivity or radiation exposure specifically associated with an outage that accounted for more than 10% of the allowable annual values in 10CFR20.

  • ... I I. lJRE DEVIATIONS REVIEWED BY ST "ION NUCLEAR . AND OP.ERATING COMMITTEE AFT U!E LIMITS SPECIFIED IN TECHNiCAL SPECIFICATIONS :: .* 1--". l .. *""* *----*--. NOVfilIBER, 19 79 NUMBER UNIT TITLE DEVIATION OP-7.1 1 Safety Injection System l-SI-21 Left Closed Valve Check.off Sheet This procedure was deviated October 17, 1979 and reViewed by the Station Nuclear Safety and Operating Committee November 7, 1979. OP-32A Valve Checkoff Sheet 1 Steam Generator Blowdown System l-BD-37 Left Closed *. This procedure was deviated October 15, 1979, and reviewed by the Station Nuclear Safety and Operating Committee November 7, 1979.