ML18136A283
Jump to navigation
Jump to search
| ML18136A283 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 12/12/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Haller N NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML18136A284 | List: |
| References | |
| NUDOCS 7912140324 | |
| Download: ML18136A283 (1) | |
Text
VIRGINIA ELEOTRIC AND POWER COMPANY RICHMOND, VIRGINIA 2 3 2 61 December 12, 1979 Mr. N. M. Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Haller:
Serial No. 1128 PO/RMT: scj.
Docket Nos. 50-280 50-281 License Nos.
DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of November, 1979.
Very truly yours,
&, l/)I). ~Cl~~~
C. M. Stallings Vice President-Power Supply and Production Operations Enclosure (3 copies) cc:
Mr. Victor Stello, Director (10 copies)
Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)
Office of Inspection and Enforcement - Region II Aoo8
.s
'19121403e4* I/;