ML18153B139
ML18153B139 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 11/04/1994 |
From: | Marshall B VIRGINIA, COMMONWEALTH OF |
To: | James Anderson VIRGINIA, COMMONWEALTH OF |
References | |
NUDOCS 9411160246 | |
Download: ML18153B139 (2) | |
Similar Documents at Surry | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217D5911999-05-17017 May 1999
[Table view]Forwards Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990329-0401 & 0412-15 at Surry Power Station ML20249A8021998-03-16016 March 1998 Discusses Re Review of Topical Programs ML20249A8001998-03-0909 March 1998 Forwards Ltr from VEPCO & WOG Requesting Waiver of Fee for Staff Review of Certain Submittals Re Pilot Program Effort risk-informed Inservice Insp Program ML18153A2541997-12-0808 December 1997 Forwards Matls Analysis Rept NESML-Q-333, Unit 2 Let Down Orifice Insp, for Use ML20211B9461997-08-0606 August 1997 Notifies of First Meeting of Plant on risk-informed ISI on 970814 in Surry,Va W/Listed Attendees to Discuss Categorization of Piping Segments & PRA Analyses & Results ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20136C8201995-10-10010 October 1995 Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl ML20137R9521995-03-22022 March 1995 Informs That Plant Performance Review of Listed Plants Was Held on 950316 ML18153B1391994-11-0404 November 1994 Forwards Surry Power Station Underground Oil Release Site Characterization Rept ML20057B1491993-09-14014 September 1993 Forwards Documents on Proposed rules,10CFR2 & 72 Re Interim Storage of Spent Fuel in Independent Spent Fuel Storage Installation & site-specific License to Qualified Applicant ML20057B1891993-09-14014 September 1993 Requests Commission Approval of Proposed Rulemaking to Eliminate Requirement of Prior Commission Approval for Specific License for ISFSI Under 10CFR2 & 72.Notice of Proposed Rulemaking & Addl Info Encl ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20245F6541989-08-10010 August 1989 Submits Daily Highlight.Notifies of 890816 Meeting W/Util to Discuss Proposed Mods to Svc Water Sys at Plant ML20245G3101989-07-31031 July 1989 Notification of 890807 Mgt Meeting W/Util in Atlanta,Ga to Discuss self-assessment Conducted at Facility ML20154N8361988-09-13013 September 1988 Notification of 880916 Significant Licensee Meeting in Region II Ofc in Atlanta,Ga to Discuss Circumstance Re Partial Loss of Level in Unit 1 Refueling Cavity on 880517 ML20196G4631988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector. Events Where Recovery of Stuck Detector & Cleaning of Thimble Tubes Led to Personnel Hazard,Discussed ML20196G4051988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector, for Consideration Due to Recent Events at Braidwood Unit 1 ML20237B2681987-12-11011 December 1987 Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche ML20153E9181987-11-16016 November 1987 Forwards Oct 1987 Significant Intergovernmental Activities & Issues Rept.Rept Represents Combined Efforts of NRC Regional State Liaison Officers,State,Local & Indian Tribes Programs Staff & Regional State Agreement Representatives ML20238B3081987-08-27027 August 1987 Notification of 870825 Meeting W/Util in Silver Spring,Md to Discuss New Nuclear Assurance Corp Cask Design & Util Part 72 License Amend Submittal ML20245B3651987-05-27027 May 1987 Forwards C Mccracken 870514 Memo on NRR Review Plan & Schedule for Info Requested from Licensees Re Responses to Facility Feedwater Pipe Rupture ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B3681987-05-14014 May 1987 Forwards Proposed Course of Action & Projected Schedule for Handling Info Received in Response to Facility Pipe Rupture Bulletin,Per J Sniezek 870507 request.SECY-86-97 Also Encl to Provide Reporting Format That Will Be Followed ML20215B6241987-04-20020 April 1987 Forwards EDO Principle Correspondence Including Question by Asselstine Re Enforcement Action Following Pipe Break ML20215H8851987-04-13013 April 1987 Requests Description of NRC Approach to Problem of Corrosion & Erosion in Feedrings & J-tubes Based on 870312 Nucleonics Wk Article Re French Investigation Into Pipe Wall Thinning. Rationale for Not Citing Util for Poor GDC-1 Also Requested ML20245A4951987-03-0909 March 1987 Forwards Regional Ofcs Response to NRC Request for Survey of Licensee Programs for Monitoring Secondary Pipe Thinning,Per IE Info Notice 86-106, Feedwater Line Break. Survey Conducted During Wk of 870207.Draft IE Bulletin Encl ML20210M9631987-02-0303 February 1987 Summarizes 870130 Telcon W/M Specter of Washington Post Re Plant Pipe Failure & AEOD/E416, Erosion in Nuclear Power Plants. AEOD Procedure for Distribution of Repts,Nrc Actions & Whether Rept Sent to Util Discussed ML20207Q6961987-01-0909 January 1987 Notification of 870115 Meeting W/Technical Experts in Washington,Dc to Discuss Parameters W/Significant Role in Pipe Failure & Development of Generic Guidance to Predict & Mitigate erosion-corrosion Piping Damage Effects ML20215B3581986-12-29029 December 1986 Informs Augmented Insp Team (AIT) of Activities During Jan 1987 in Order to Conclude AIT Insp & Issuance of Insp Rept. Insp Rept Based on 861217 Draft Executive Summary Requested by 870109.AIT Will Reconvene During Wk of 870112 ML20214J6961986-11-21021 November 1986 Notification of 861124 Meeting W/Util in Bethesda,Md to Discuss Util Request to Amend Licenses for 40-yr Operation from Date of Issuance of OLs ML20210K0781986-04-0303 April 1986 Forwards FEMA Rept on 851004 Emergency Exercise.State Supplied Schedule of Corrective Actions Will Be Forwarded When Received.Overall Capability of Offsite Authorities Acceptable & 44CFR350 Approval Remains in Effect ML20134N7891985-08-21021 August 1985 Forwards Investigation Rept 2-84-015 to Be Provided to Ofc of Investigations Region II for Release to Licensee & Pdr. Part 21 Related ML20127F3061985-06-18018 June 1985 Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed ML20128H7661985-06-0505 June 1985 Discusses Substantive Changes in 850416 Rev to Radiological Emergency Plans.Revs Meet Requirements of 10CFR50.54(q) & 50.47(b) ML20210P6381984-03-0808 March 1984 Comments on Statement That NRC Has Already Authorized Three Utils to Load & Use Fuel Intended for Burnup,Per 840222 Memo.Authorization Not Yet Granted.Forwards Paper Presented at ANS Meeting ML20197G2791984-03-0707 March 1984 Forwards SER for Radiological Consequences of Accidents for Extended Burnup.Calculated Dose to Thyroid for Fuel Handling Accident Indicates Plant Design Adequate.Salp Also Encl ML20080D5321983-10-17017 October 1983 Informs of 831015 Fatal Accident Involving Wc Jones. Expansion Joint Ruptured During High Pressure Drain Pump Valve Operation ML20244C1011983-02-16016 February 1983 Forwards Engineering Evaluation of 811128 Event Involving Svc Water Valve Pit Flooding.Licensee Has Installed Dikes & Lights & Upgraded Maint Procedures to Preclude Future Occurrences.No Further Action Necessary ML20127A3681982-08-18018 August 1982 Forwards List of Plants for Which Leak Test Repts Were Selected for Review by Ornl.Leak Testing Criteria Will Be Prepared from Review.W/O Encl ML20062E0791982-07-29029 July 1982 Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA ML20062D3291982-07-29029 July 1982 Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA ML20126L2271981-05-0101 May 1981 Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities1980-12-31031 December 1980 Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities ML20134L4961980-12-31031 December 1980 Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities ML20128Q7331980-07-28028 July 1980 Discusses Proposed Rev to IE Bulletin 79-14,per 800528 Memo. Region II Requested to Identify Design Organizations Which Did Static Analyses for Plant Resistance Temp Detector Lines.Reanalysis Necessary ML20128Q7131980-05-28028 May 1980 Discusses Proposed Rev to IE Bulletin 79-14 as Result of Overstressed Resistance Temp Detectors Found at Plants. Bulletin Should Be Revised to Include Small Bore Piping Under 2.5 Inches ML20125E4221980-01-15015 January 1980 Accepts Integrated Startup Program for Facility.Baseline Eddy Current Insp of Tubing Should Be Performed After Field Hydrostatic Test & Be Considered Preservice Insp as Defined in Westinghouse STS ML20133N1661979-03-27027 March 1979 Submits Info Re Cost of Replacement Power While Facilities Shut Down.Info Will Aid in Responding to Senate Appropriations Subcommittee 790313 Question ML20133M2111979-03-14014 March 1979 Submits Schedule for S&W to Complete Calculations.Ofc of Policy Evaluation Should Prepare Paper Re Impact on Each Region of Shutdown,Degree of Relaxation from Stds Allowable & If Mods Can Be Done Over Extended Period by 790415 1999-05-17 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217D5911999-05-17017 May 1999
[Table view]Forwards Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990329-0401 & 0412-15 at Surry Power Station ML20249A8021998-03-16016 March 1998 Discusses Re Review of Topical Programs ML20249A8001998-03-0909 March 1998 Forwards Ltr from VEPCO & WOG Requesting Waiver of Fee for Staff Review of Certain Submittals Re Pilot Program Effort risk-informed Inservice Insp Program ML18153A2541997-12-0808 December 1997 Forwards Matls Analysis Rept NESML-Q-333, Unit 2 Let Down Orifice Insp, for Use ML20216B2411997-08-28028 August 1997 Staff Requirements Memo Re SECY-97-182, Proposed Enforcement Action Against VA Electric & Power Co for Violations of Maint Rule at Surry Power Station ML20211B9461997-08-0606 August 1997 Notifies of First Meeting of Plant on risk-informed ISI on 970814 in Surry,Va W/Listed Attendees to Discuss Categorization of Piping Segments & PRA Analyses & Results ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20136C8201995-10-10010 October 1995 Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl ML20137R9521995-03-22022 March 1995 Informs That Plant Performance Review of Listed Plants Was Held on 950316 ML18153B1391994-11-0404 November 1994 Forwards Surry Power Station Underground Oil Release Site Characterization Rept ML20057B1491993-09-14014 September 1993 Forwards Documents on Proposed rules,10CFR2 & 72 Re Interim Storage of Spent Fuel in Independent Spent Fuel Storage Installation & site-specific License to Qualified Applicant ML20057B1891993-09-14014 September 1993 Requests Commission Approval of Proposed Rulemaking to Eliminate Requirement of Prior Commission Approval for Specific License for ISFSI Under 10CFR2 & 72.Notice of Proposed Rulemaking & Addl Info Encl ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20245F6541989-08-10010 August 1989 Submits Daily Highlight.Notifies of 890816 Meeting W/Util to Discuss Proposed Mods to Svc Water Sys at Plant ML20245G3101989-07-31031 July 1989 Notification of 890807 Mgt Meeting W/Util in Atlanta,Ga to Discuss self-assessment Conducted at Facility ML20154N8361988-09-13013 September 1988 Notification of 880916 Significant Licensee Meeting in Region II Ofc in Atlanta,Ga to Discuss Circumstance Re Partial Loss of Level in Unit 1 Refueling Cavity on 880517 ML20196G4631988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector. Events Where Recovery of Stuck Detector & Cleaning of Thimble Tubes Led to Personnel Hazard,Discussed ML20196G4051988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector, for Consideration Due to Recent Events at Braidwood Unit 1 ML20237B2681987-12-11011 December 1987 Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche ML20153E9181987-11-16016 November 1987 Forwards Oct 1987 Significant Intergovernmental Activities & Issues Rept.Rept Represents Combined Efforts of NRC Regional State Liaison Officers,State,Local & Indian Tribes Programs Staff & Regional State Agreement Representatives ML20238B3081987-08-27027 August 1987 Notification of 870825 Meeting W/Util in Silver Spring,Md to Discuss New Nuclear Assurance Corp Cask Design & Util Part 72 License Amend Submittal ML20245B3651987-05-27027 May 1987 Forwards C Mccracken 870514 Memo on NRR Review Plan & Schedule for Info Requested from Licensees Re Responses to Facility Feedwater Pipe Rupture ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B3681987-05-14014 May 1987 Forwards Proposed Course of Action & Projected Schedule for Handling Info Received in Response to Facility Pipe Rupture Bulletin,Per J Sniezek 870507 request.SECY-86-97 Also Encl to Provide Reporting Format That Will Be Followed ML20215B6241987-04-20020 April 1987 Forwards EDO Principle Correspondence Including Question by Asselstine Re Enforcement Action Following Pipe Break ML20215H8851987-04-13013 April 1987 Requests Description of NRC Approach to Problem of Corrosion & Erosion in Feedrings & J-tubes Based on 870312 Nucleonics Wk Article Re French Investigation Into Pipe Wall Thinning. Rationale for Not Citing Util for Poor GDC-1 Also Requested ML20207R2651987-03-11011 March 1987 Staff Requirements Memo Re 870225 Commission Briefing Concerning 861209 Feedwater Line Rupture Event at Facility. Commission Requested Info on Completion Dates for Generic Issue Re Check Valves & on Other Listed Items ML20245A4951987-03-0909 March 1987 Forwards Regional Ofcs Response to NRC Request for Survey of Licensee Programs for Monitoring Secondary Pipe Thinning,Per IE Info Notice 86-106, Feedwater Line Break. Survey Conducted During Wk of 870207.Draft IE Bulletin Encl ML20210M9631987-02-0303 February 1987 Summarizes 870130 Telcon W/M Specter of Washington Post Re Plant Pipe Failure & AEOD/E416, Erosion in Nuclear Power Plants. AEOD Procedure for Distribution of Repts,Nrc Actions & Whether Rept Sent to Util Discussed ML20207Q6961987-01-0909 January 1987 Notification of 870115 Meeting W/Technical Experts in Washington,Dc to Discuss Parameters W/Significant Role in Pipe Failure & Development of Generic Guidance to Predict & Mitigate erosion-corrosion Piping Damage Effects ML20215B3581986-12-29029 December 1986 Informs Augmented Insp Team (AIT) of Activities During Jan 1987 in Order to Conclude AIT Insp & Issuance of Insp Rept. Insp Rept Based on 861217 Draft Executive Summary Requested by 870109.AIT Will Reconvene During Wk of 870112 ML20214J6961986-11-21021 November 1986 Notification of 861124 Meeting W/Util in Bethesda,Md to Discuss Util Request to Amend Licenses for 40-yr Operation from Date of Issuance of OLs ML20210K0781986-04-0303 April 1986 Forwards FEMA Rept on 851004 Emergency Exercise.State Supplied Schedule of Corrective Actions Will Be Forwarded When Received.Overall Capability of Offsite Authorities Acceptable & 44CFR350 Approval Remains in Effect ML20134N7891985-08-21021 August 1985 Forwards Investigation Rept 2-84-015 to Be Provided to Ofc of Investigations Region II for Release to Licensee & Pdr. Part 21 Related ML20127F3061985-06-18018 June 1985 Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed ML20128H7661985-06-0505 June 1985 Discusses Substantive Changes in 850416 Rev to Radiological Emergency Plans.Revs Meet Requirements of 10CFR50.54(q) & 50.47(b) ML20210P6381984-03-0808 March 1984 Comments on Statement That NRC Has Already Authorized Three Utils to Load & Use Fuel Intended for Burnup,Per 840222 Memo.Authorization Not Yet Granted.Forwards Paper Presented at ANS Meeting ML20197G2791984-03-0707 March 1984 Forwards SER for Radiological Consequences of Accidents for Extended Burnup.Calculated Dose to Thyroid for Fuel Handling Accident Indicates Plant Design Adequate.Salp Also Encl ML20080D5321983-10-17017 October 1983 Informs of 831015 Fatal Accident Involving Wc Jones. Expansion Joint Ruptured During High Pressure Drain Pump Valve Operation ML20244C1011983-02-16016 February 1983 Forwards Engineering Evaluation of 811128 Event Involving Svc Water Valve Pit Flooding.Licensee Has Installed Dikes & Lights & Upgraded Maint Procedures to Preclude Future Occurrences.No Further Action Necessary ML20127A3681982-08-18018 August 1982 Forwards List of Plants for Which Leak Test Repts Were Selected for Review by Ornl.Leak Testing Criteria Will Be Prepared from Review.W/O Encl ML20062D3291982-07-29029 July 1982 Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA ML20062E0791982-07-29029 July 1982 Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA ML20126L2271981-05-0101 May 1981 Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities1980-12-31031 December 1980 Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities ML20134L4961980-12-31031 December 1980 Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities ML20128Q7331980-07-28028 July 1980 Discusses Proposed Rev to IE Bulletin 79-14,per 800528 Memo. Region II Requested to Identify Design Organizations Which Did Static Analyses for Plant Resistance Temp Detector Lines.Reanalysis Necessary ML20128Q7131980-05-28028 May 1980 Discusses Proposed Rev to IE Bulletin 79-14 as Result of Overstressed Resistance Temp Detectors Found at Plants. Bulletin Should Be Revised to Include Small Bore Piping Under 2.5 Inches ML20125E4221980-01-15015 January 1980 Accepts Integrated Startup Program for Facility.Baseline Eddy Current Insp of Tubing Should Be Performed After Field Hydrostatic Test & Be Considered Preservice Insp as Defined in Westinghouse STS 1999-05-17 |
Text
....
- November A, 1994 Mr. J. Meade R. Anderson, P.G. Department of Environmental Quality Piedmont Water Regional Office P.O. Box 6030 Glen Allen, VA 23058 e SPS/ENV 43/SUBSURF OIL RE: PC# 94-3824 SURRY POWER STATION UNDERGROUND OIL RELEASE SITE CHARACTERIZATION REPORT
Dear Mr. Anderson:
Enclosed is the Site Characterization Report for the underground oil release at Surry Power Station, PC# 94-3824. The report was initially due July 8 1994; however, we requested and received an extension until November 7, 1994. The report includes the SCR checklist.
In keeping with the risk based approach for determination of remedial action, Virginia Power believes that there is adequate evidence to demonstrate that natural in-situ passive degredation is the appropriate corrective action for the site. Therefore, we request the DEQ to render a Case Closed decision for PC# 94-3824. Please contact Wes Sprouse at 273-3552 if you have any questions.
Sincerely, B. M. Marshall, P.E. Manager, Water Quality Attachment cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta St., NW Suite 2900 Atlanta, GA 30323 Re: Surry Units 1 & 2 Docket Nos. 50-280/50281 License Nos. DPR-32/DPR-37 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Re: Surry Units 1 & 2 Docket Nos. 50-280/50281 License Nos. DPR-32/DPR-37 1150117 ... u -fi... Mr. M. W. Branch NRC Senior Resident Surry Power Station Inspe~~_gr
_____________________
_ 9411160246 941104 PDR ADOCK 05000280 601_} I D P PDR
., .... ..:-~ \_ . be: Mr. D. Mr. fv'r. Mr. J. Mr. T. Mr. w. .*; A. L. A. B. R. *
- Christian
-SPS Bowling -IN 2SE Price -SPS Sowers -SPS Benthall -SPS -w/enclosure Mr. Thornton -IN 2SE w. A. Mr. A. R. Fletcher -SPS -w/enclosure Mr. B. R. Belsches -SPS -w/enclosure Mr. J. W. White Mr. M. F. Kadlubowski Mr. D. L. James Jtc;;1~1fr Mr. W. A. Sprouse, Jr~ w/enclosure Power Operations Management
-IN GW -w/enclosure Concurrences Mr. D. A. Christian Yr,+L.w/B~B Mr. M. L. Bowling ~sr faLi ~~*v14LJ1-/):y,fi-Mr. B. R. Belsches °ti;J ri,L,_, ,)zW Action Plan 1. Respond to comments from Virginia Department of Environmental Quality as appropriate.
Verification of Accuracy The information in the subject Site Characterization Report was furnished by station personnel, Water Quality Dept. personnel, and the consultant.
The consultant analyzed the site data and information, and prepared the report. Commitments Carry out Action Plan Requirements or changes to UFSAR or QA Topical Report None.