ML19007A113

From kanterella
Revision as of 02:28, 30 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301
ML19007A113
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/03/2019
From: Vincent Gaddy
Operations Branch IV
To: Welsch J M
Pacific Gas & Electric Co
References
50-275/19-301, 50-323/19-301
Download: ML19007A113 (3)


See also: IR 05000323/2019301

Text

January 3, 2019 Mr. James Welsch , Chief Nuclear Officer, and Vice President, Nuclear Generation

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA

93424 SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND

2 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000275/201

9301; 05000323/201

9 301 Dear Mr. Welsch: The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at your Diablo Canyon Power Plant, Units 1 and 2. The NRC has completed its review of the operator license applications submitted in connection

with this examination and separately provided a list of approved applicants to Mr. R. Fortier, Lead Examination Developer. Note that any examination waivers and applications denials

have been addressed in separate correspondence.

The Nuclear Regulatory Commission (NRC) has approved the subject examinations and hereby authorizes you to administer the

written examination in accordance with NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11, on January 25 , 201 9. The NRC staff will administer the operating tests during the week of January 14 , 201 9. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG

-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG

-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 817

-200-1159.

J. Welsch 2 Please contact your Chief Examiner, Clyde Osterholtz, at 817

-200-1269, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or

complete written examination and/or operating test) specified for each applicant.

Sincerely, /RA/ Vince nt G. Gaddy, Chief Operations Branch

Division of Reactor Safety

Docket Nos.

50-275 and 50

-323 License Nos.

DPR-80 and DPR

-82

J. Welsch 3 DIABLO CANYON POWER PLANT, UNITS 1 AND

2 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2019301; 05000323/2019301

- DATED JANUARY 3 , 2019 DISTRIBUTION:

Regional Administrator (Scott.Morris@nrc.gov) Deputy Regional Administrator (Mark.Shaffer@nrc.gov) DRS Director Acting (Ryan.Lantz@nrc.gov) DRS Deputy Director

Acting (Geoff.Miller@nrc.gov

) DRP Director (Anton.Vegel@nrc.gov)

DRP Deputy Director (Michael.Hay@nrc.gov)

Regional Counsel (David.Cylkowski@nrc.gov)

RIV/ETA: OEDO (Aida.Rivera-Verona@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov

) Licensing Assistant (Jennifer.Bridges@nrc.gov)

Acting Team Lead er, DRS/IPAT (Ray.Kellar@nrc.gov) Project Engineer, DRS/IPAT (Peter.Jayroe@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Branch Chief, DRP/A (Mark.Haire@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Larry.Newman@nrc.gov)

Senior Resident Inspector (Christopher.Newport@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Administrative Assistant (Madeleine.Arel@nrc.gov

) ADAMS ACCESSION

NUMBER: ML19007A113

SUNSI Review

ADAMS: Non-Publicly Available

Non-Sensitive Keyword: By: CCO Yes No Publicly Available

Sensitive OFFICE OB:SOE C:OB NAME COsterholtz

VGaddy SIGNATURE /RA/ /RA/ DATE 01/03/19 01/03/19 OFFICIAL RECORD COPY