IR 05000461/2012001

From kanterella
Revision as of 00:23, 12 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter for Clinton Power Station (Report 05000461/2012001)
ML13060A108
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/04/2013
From: Orlikowski R J
NRC/RGN-III/DRP/B1
To: Pacilio M J
Exelon Nuclear, Exelon Generation Co
References
IR-12-001
Download: ML13060A108 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 4, 201 3 Mr. Michael Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer , Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: ANNUAL ASSESSMENT LETTER FOR CLINTON POWER STATION (REPORT 05000461/201 2 00 1) Dear Mr. Pacilio

On February 13, 201 3, the Nuclear Regulatory Commission (NRC)

completed its end-of-cycle performance review of Clinton Power Station, Unit The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 201 2 , through December 31, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Clinton Power Station operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Clinton Power Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through December 31, 201 Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revised at the mid

-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections, which will be sent via separate, non

-publically available correspondenc M. Pacilio

-2- In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure , will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (630) 829

-97 53 with any questions you may have regarding this lette

Sincerely,

/RA/

Robert J. Orlikowski , Acting Chief Branch 1 Division of Reactor Projects Docket No. 50

-461 License No. NPF

-62 Enclosure:

Clinton Power Station Inspection/Activity Plan cc w/encl:

Distribution via ListServ

Ž