NRC Emergency Preparedness Annual Inspection Report Nos. 05000461-12-501 and 05000461-12-502
ML13007A197
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/07/2013
From: Richard Skokowski
Plant Support Branch II
To: Pacilio M
Exelon Generation Co
References
IR-12-502, IR-12-501
Download: ML13007A197 (3)


Text

nuary 7, 2013

SUBJECT:

CLINTON POWER STATION NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000461/2012501 AND 05000461/2012502

Dear Mr. Pacilio:

On December 31, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Clinton Power Station. This inspection began on January 1, 2012. Issuance of this letter closes Inspection Report Numbers 2012501 and 2012502. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief ary 7, 2013

SUBJECT:

CLINTON POWER STATION NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000461/2012501 AND 05000461/2012502

Dear Mr. Pacilio:

On December 31, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Clinton Power Station. This inspection began on January 1, 2012. Issuance of this letter closes Inspection Report Numbers 2012501 and 2012502. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ'

DISTRIBUTION:

See next page DOCUMENT NAME: CLI EP Annual Closeout Ltr Jan 2013.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RJickling:cs JMaynen for DFunk RSkokowski DATE 01/04/13 01/04/13 01/07/13 OFFICIAL RECORD COPY

Letter to Mr. Michael from Mr. Richard A. Skokowski dated January 7, 2013.

SUBJECT: CLINTON POWER STATION NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000461/2012501 AND 05000461/2012502 DISTRIBUTION:

Cayetano Santos RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Christine Lipa Linda Linn DRSIII DRPIII Tammy Tomczak ROPreports.Resource@nrc.gov