Similar Documents at Cook |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4701996-02-0808 February 1996 In-Service Pump Test Plan, Units 1 & 2 ML17334B5661995-11-30030 November 1995 Vols I & II of Third 10-Yr Interval Long-Term Inservice Exam Plan for Class,1,2 & 3 Sys & Components for DC Cook Nuclear Plant,Unit 1, Final Plan ML17334B5671995-11-30030 November 1995 Vols I & II of Third 10-Yr Interval Long-Term Inservice Exam Plan for Class 1,2 & 3 Sys & Components for DC Cook Nuclear Plant,Unit 2, Final Plan ML17332A2521994-08-0303 August 1994 Rev 3 to Plant Manager Procedure (PMP) 12 PMP 3150 PCP.100, Radwaste Pcp. ML17332A2491994-08-0303 August 1994 Rev 7 to Plant Manager Procedure (PMP) 12 PMP 6010 OSD.001, Odcm. ML20063K0631994-02-11011 February 1994 Change Sheet 1 to Rev 5 to Plant Manager Procedure (PMP) 12 PMP 6010 RPP.304, Use of HEPA Vacuum Cleaners. W/ Updated Index,Page 14 ML17331B0441993-11-0909 November 1993 Rev 15 to Emergency Response Manual. W/931109 Ltr ML17334B4851993-08-0909 August 1993 Rev 14 to Emergency Response Manual. W/930809 Ltr ML17334B4821993-04-0202 April 1993 Rev 3 of Pump Inservice Test Program. ML17329A5431992-06-11011 June 1992 Change Sheet 7 to Rev 6 to Procedure PMP 2080 EPP.107, Notification of Plant Personnel. ML20077S7281991-03-14014 March 1991 Rev 3 to PMP 6010.OSD.001, Odcm ML17325B3791990-03-0101 March 1990 Change Sheet 1 to Rev 3 to Procedure PMP 2080 EPP.106, Initial Offsite Notification. ML17334B3551990-02-0505 February 1990 Rev 2 to DC Cook Nuclear Plant Units 1 & 2 Inservice Testing Pump Program. ML17334B3561990-02-0505 February 1990 Rev 3 to DC Cook Nuclear Plant Unit 2 Inservice Testing Valve Program. ML17334B3571990-02-0505 February 1990 Rev 3 to DC Cook Nuclear Plant Unit 1 Inservice Testing Valve Program. ML20246M2191989-03-21021 March 1989 Procedure MS-3.2.1.9-1B, Maint & Surveillance Ite Medium Voltage Switchgear Equipment ML17325B0511988-12-0909 December 1988 Interim Acceptance Criteria for Safety-Related Piping Sys. ML17334B1491987-10-0505 October 1987 Rev 2 to DC Cook Nuclear Plant Unit 1 Inservice Testing Valve Program. ML17334B1501987-10-0505 October 1987 Rev 2 to DC Cook Nuclear Plant Unit 2 Inservice Testing Valve Program. ML20212A3191986-10-0202 October 1986 Rev 1 to Procedure 12 PMP 4021 TRP.001, Reactor Trip Review ML17324A9301986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.001, Maint Procedure for Repowering RHR Pump. ML17324A9321986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.003, Maint Procedure for Repowering Pressurizer Backup Heaters. ML17324A9331986-05-29029 May 1986 Rev 0 to Procedure 1MHP2140.082.005, Maint Procedure for Repowering Containment Valves. ML17324A9341986-05-29029 May 1986 Rev 0 to Procedure 1 Thp 6030 IMP.304, Pressurizer PORV Cable Repair. ML17324A9351986-05-29029 May 1986 Rev 0 to Procedure 1 Thp 6030 IMP.305, App R Post-Fire Repowering of In-Containment Valves. ML17334A9711986-05-22022 May 1986 Rev 0 to Procedure 12-OHP 4023.100.001, Unit 1 Emergency Remote Shutdown. ML20213F6011986-05-15015 May 1986 Rev 1 to Procedure PMP 6010.OSD.001, Offsite Dose Calculation Manual ML17324A9001986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part Iv,Training for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML17324A8991986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part Ii,Writers Guide for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML17324A8971986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part I,Specific Technical Guidelines for Donald C Cook Nuclear Plant. ML18005A0161986-05-0101 May 1986 Rev 1 to Procedures Generation Package,Part III, Verification/Validation for Donald C Cook Nuclear Plant Emergency Operating Procedures. ML20195C5361986-03-15015 March 1986 Public Version of Emergency Response Manual for DC Cook Nuclear Plant ML20141D7121986-02-28028 February 1986 Rev 0 to Master Insp Plan ML20137J6061985-12-17017 December 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 2 to Erp 2.07, Outside Agency Liaison, Rev 1 to Erp 2.08, Initial Assessment Group Runner & Rev 2 to Erp 5.01.W/860117 Release Memo ML17334A9441985-11-0505 November 1985 Change Sheet 1 of Rev 9 to Spec DCCFP101QCN, Matl & Application Spec - Initial & Repair Installations, Revising App D Silicon Foam Scope of Work to Identify New Fire Barriers & for Cross Referencing Fire Zones ML17334A9191985-10-15015 October 1985 Implementation Plan of Reg Guide 1.97,Rev 3 for Donald C Cook Nuclear Plant Units 1 & 2, Status Rept 1999-05-07
[Table view] |
Text
PMP EPP INDEX INDIAiVA 5 ilICH GAiV PO'riER COMPANY DONALD C.COOK HUCL~nR PLAiNT P NT MANA Indev Identific ion Numt.er PMP 2080 EPP.001 Tl tl e Emergency Plan Activation and Condition Classification Revision iVo.And Dato Revision 2 4-27-82 Ccmments TP-1,5-27-82 Exp NA EPP.OO EPP.003 EPP.OO EPP:005 EPP.OO Unusual Event Al ert Site Emergency General Emergency Initial Dose Assessment (Gaseous)CAiVCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81:".ev.2 4-27-82 EPP.007 EPP.008 EPP.009 EPP.010 EPP.011 EPP.012 Initial Release Assessments (Liquid)Calling Off-Duty Plant Personnel Fire Emergency Guidelines Toxic Gas Release Guidelines Natural Emergency Guidelines Initial Off-Site Notificatio]
Revision 0 4-1-81 Revision 1 4-29-82 Revision 1 6-15-82 Revision 1 6-2-82 Revision 0 4-1-81 Revision 1 4-27-82 TP-1,2-23-82 Exp NA P-1,4-30-82 Exp N/A 8207060048 820625 PDR ADOCK 05000315 F PDR'.v"a--~l-.'.
I , V C f I.C
~~PMP EPP INDEX IHOIAHA&MICHIGAN PO'riER COMPANY DONALD C.COOK NUCLEAR PLANT P ANT MANAGER PROCEDURE index Identification Number Ti tie Revision Ho.And Oat Ccmment-PMP 2080 EPP.013 EPP.014 EPP.015 EPP Appendix A Duties of the Individual Who Discovers an Emergency Condition Personnel Injury Responsibility of the On-Site Emergency.
Coordinator Telephone Numbers for Key Plant Personnel Revision 0 4-1-81 Revision.1 6-15-82" Revision 1 4-29-82 Revi sion 2 6-1-82 TP-1,5-27-82 Exp NA EPP Appendix 8 EPP Appendix C Hospital Assistance Plan Radiological Supplement Revision".3-31-81 Revision 0 4-1-81 Pace lA.-.ev..a-.-
(ikra.
INDIANA 8 NIICHIGAN ElECTRIC COMPANY DONALD C COOK NUClEAR PLANT PROCEDURE COVER SHEET Procedure No.pMp pp8O Epp Mg Revision No.1 FIRE EMERGENCY GUIDELINES SCOPE OF REVISION Revision I-Revised to provide clarification of Operator actions.OCR JUN 1 61982 SIGNATURES ORIGINAL Rev.I REV.2 Rev.S PREPARED BY QUALITY ASSURANCE REVIEVf INTERFACING DEPARTMENT HEAD CONCURRENCE DEPARTMENT HEAD APPROVAL PLANT NUCLEAR SAFETY COMMITI7E PLANT MANAGER APPROVAL N.A.N.A.A.DATE OF ISSUE 3-31-81 Fccm No.PN 2010-1~REV.2 PIP 2080 EPP.009 LEST OF EFFECTIVE PAGES Pa e Numbers Page 1 of 2 Page 2 of 2 Revision Number and Date Revision 1 6-15,82 Revision 1-6 15"8~Page 1 of 1 Rev.1, 6-15,82 PMP 2080 EPP.009 INDIANA 6 MICHIGAN ELECTRIC COMPAiW DONALD C.COOK NUCLEAR PLANT FIRE EMERGENCY GUIDELINES 1.0 OBJECTIVES This procedure sets forth those actions which must be taken during emergency situations involving the outbreak of fire at on-site plant locations.
2.0 RESPONSIBILITIES The Shift Supervisor (SS)/On-Site Emergency Coordinator (OSEC)and Fire Brigade members are responsible for the accomplishment of emergency actions required in response to a fire at DCCNP.3.0 APPLICABIIITY This procedure describes emergency fire activities including assessment and emergency classification, notifications and reporting, activation of the Fire Brigade or other emergency organizations, fire suppression activities, assistance requests to local fire departments, personnel safety, radiological considerations and response to protection.
4.0 INSTRUCTIONS 4.1 Shift Supervisor
-Immediate Actions 4.l.1" If possible, in a timely manner, confirm and determine the extent of the fire.4.1.2 Sound the plant fire alarm, make a P.A.announcement of the fire's location, and establish fire announcements on the fire conference circuit (telephone number 1800).4.1.3 Brief and dispatch a fire brigade leader to assume control of the fire brigade at the fire.4.1.4 Request,, if needed, that Security brings the F're Truck to the fire area.4.1.5 If the fire is within a controlled area, request assistance from the Radiation Protection Section to determine the following:
A.Radiation levels B.Airborne activity levels C.Contamination levels 4.1.5.1 The Fire Brigade Leader should instruct the fire br'gade on precautions to be taken if contamination or radioactive smoke are encountered.
Page 1 of 2.Rev.1, 6->>-82 PMP 2080 EPP.009 4.1.5.2 The Fire Brigade Leader should minimize the number or personnel involved and stay times when combatting fires in potential radiation hazard areas.4.1.5.3 Fire fighters should be aware of the possible loss of radiological shielding during a fire.4.1.6 Notify the Plant<tanager or Operations Superintendent.
4.1.7 Establish communications between the Shift Supervisor (Control Room)and the Fire Brigade Leader.4.1.8 Direct other Plant staff members required to support the fire-fighting effort in the tasks required.4.1.9 Request Outside assistance if required, and notify Plant Security to meet the incoming units and escort them to the fire area.4.1.10 Direct all on-site fire-fighting operations, including de-energizing electrical equipment and mechanical equipment, as necessary.
4.1.11 Determine need for additional support such as Reentry and Rescue Team and off-site medical support.4.1.12 Refer to and implement as required PUP 2080 EPP.001, Emergency Plan Activation and Condition Classification, and review Emergency Action Levels based upon reports ,from the fire scene.4.1.13'Notify the NRC, if required.Direct fire fighting effort until fire is out or relieved by the OSEC.4.2 Shift Supervisor
-Subsequent Actions 4.2.1 Restore Fire suppression equipment and alarm systems when the fire is out.4.2.2 Ensure all personnel and equipment are monitored for contamination when leaving a fire area within the Controlled Area.4.2.3 Investigate the cause of the fire and document findings per OHI 2271, Fire Investigation.
4.2.4 Ensure completion of initial off-site notification list from PMP 2080 EPP.012.4 2 5 Notify the QC Section to replace expended fire eauipment and check permanent equipment restored to standby readiness.
Page 2 of 2 Rev.1, 6-1""-82
/ND/AIIVA 8 lÃIC8!GAIII ELECTRIC CoiÃPAIIIY DONALD C.COOK NUCLEAR PLANT PROCEDURE COVER SHEET Procedure No.PMP-2080 EPP.014 Revision No.PERSONNEL INJURY SCOPE OF REVISION Revision 1-Added Step 9 to Exhibit B.DCR guN 1 61982 SIGNATURES ORIGINAL Rev.I REV.2 Rev.0 PREPARED BY QUALITY ASSURANCE REVIEW INTERFACING DEPARTMENT HEAD CONCURRENCE DEPARTMENT HEAD APPROVAL PLANT NUCLEAR SA~r.COMMITTEE PLANT MANAGER APPROVAL DATE OF ISSUE g-Z7-9 Form Na PMI 2010 1~REV.2 PMP-2080 EPP.014 LIST OF EFFECTIVE PAGES Pa e Numbers Page 1 of 4 Page 2 of 4 Page 3 of 4 EXHIBIT A Page 4 of 4 EXHIBIT B Revision Number and Date I Revision 1-6-15-82 Revision 1-6-15-82 Revision 1-6-15-82 Revision 1-6-15-82 6-lk-82 INDIANA 8 MICHIGAN ELECTRIC COMPANY DONALD C.COOK NUCLEAR PLANT PERSONNEL INJURY PMP-2080 EPP.014 1.0 OBJECTIVES This procedure provides general guidance to the On-Site Emergency Coordinator (OSEC)to ensure that injured personnel receive appropriate first-aid; that prompt and correct notification of Memorial Hospital takes place;and that appropriate members of the Plant Manager'Safety Investigation Comnittee are notified of the event.This procedure is supplemented by PMP-2081 EPP.008 when the injury occurs in an area where there is a potential for radiation/contamination.
2.0 RESPONSIBILITIES 2.1 The OSEC is responsible for implementation of this procedure upon notification of injured personnel.
The S;S shall act as the OSEC until relieved of this responsibility as described in PMP-2080 EPP.015 2.2 An Asst.Shift Supervisor (A.S.S.)will normally be responsible for coordinating activities at the scene of the injury.The" S.S will be assisted by someone trained in first aid as well as an individual trained in radiation protection when radiation/
contamination is involved.2.3 Radiation Protection personnel are responsible for coordinating Health Physics activities described in PMP-2081 EPP.008.Note: In general, the order of medical treatment will be: 1.Care of severe physical injuries 2.First aid to other injuries 3.Personnel decontamination 4.Definitive medical treatment 3.0 APPLICABILITY This procedure is applicable any time one of the following personnel injuries occurs on site: 3.1 An injury requiring transportation to the hospital in an ambulance.
3.2 Any time an injury involves transportation of contaminated individual to the hospital.Page 1 of 4 Rev.I, 6-15-82 PMP-2080 EPP.014 4.0 INSTRUCTIONS 4.1 Ensure that a team is dispatched to provide medical treatment to the injured.4.2 If radiation/contamination is involved, notify R.P.to assist as per PMP-2081 EPP.008 4.3 Obtain information necessary to complete Exhibit A and/or Exhibit B.4.4 If an ambulance is necessary, notify Security to request local ambulance service.4.5 If contaminated patients are involved, and an ambulance is to be used, request Security to bring the plant ambulance to the vehicle search portal for possible off-site agency use.4.6 Notify Memorial Hospital as per Exhibit A and/or Exhibit B.4.7 Be prepared for Memorial Hospital to call back to verify the existence of contaminated patients if Exhibit 8 is used.4.8 If contaminated patients are involved ensure at least one member of Radiation Protection accompanies the individual to the hospital.4.9 Ensure.appropriate plant staff notifications as per PMSO.048, Occupational-"Inj.uries.
4.10 Return to PMP-2080 EPP.001 as appropriate.
Page 2 of 4 Rev.J,6-15-82 HOSPITAL CALL-INDUSTRIAL ACCIDENT NO RADIOLOGICAL COMPL ICATIONS PMP-2080 EPP.Q14 EXHIS IT A Call MEMORIAL HOSPITAL EMERGENCY ROOM-983-8262 When the EMERGENCY ROOM personnel answer, say: "My name is I am the SMft Supervisor at the Cook an'n r>gman.'m calling for who is the Shift Suoervisor at the Cook an 1n rs gman).2."We have had an industrial injury which does not involve any radiation.
I repeat, the injury does not inv~ove any radiation." 3.Patient No."We have patients with the following injuries: Injury 2.4, 5.4."The (first)ambulance should be leaving in about minutes and will be brought to the EMERGENCY ROOM entrance." 5."Are there any questions?" Page 3 of 4 Rev.1 6-1.c-82 PMP-2080 EPP.014 EXHIBIT B HOSPITAL CAI L-RADIOLOGICAL HAZARDS Call MEMORIAL HOSPITAL-983-8262 When the telephone is answered, say: "This is a radiation emergency call from the Donald C.Cook Nuclear Plant.Please connect me with: (from 7:30 AM to 3:00 PM, Monday through Friday)-the Assistant Director, Emergency Room and Outpatient;(from 3:00 PM to 7:30 AM, Monday through Friday and on weekends)-
the Emergency Room Charge Nurse." When the Assistant Director or Charge Nurse answers, say: 3.l."My name is I am the Shift Supervisor at the Cook Plant.I am calling for who is the Shift Supervisor at the Cook Plant)." 2."Initiate the Donald C.Cook Plant Hospital Assistance Plan and prepare to receive radiation patients.""We have patients.Of these are contaminated and involve radiation hazards." 4."Can you receive these patients?" Answer 5."They ws e transporte sn am u ances.e erst ov which will leave in approxima~te y minutes.The travel<<h 6."The following information is available on the patients: Patient Contaminated?
Deconned?Radiation Radiation No.Injury Yes/No~Yes/No)~Yes/No)Level 2.3.4~5.7." e o low>ng precautions shou be o served as recommenae by R.P.)" a.No special precautions beyond those normally provided in the Hospital Assistance Plan.b.Treatment personnel should wear respiratory protection.
c.Radiation levels may create special problems.Be sure'o wait for dosimetry equipment.
d.(Others as given by R.P.)8."Are there any questions?" 9."I can be contacted at Extension if more information is needed".At the conclusion of the report, the Assistant Director or Charge Nurse will telephone the Shift Supervisor at the Donald.C.Cook Nuclear Plant to confirm'he report.Page 4 of 4 Rev.1, 6-15-82