ML16111A608

From kanterella
Revision as of 07:15, 27 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2016 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Examination Transmittal Letter
ML16111A608
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/30/2016
From: Northard S
Northern States Power Co, Xcel Energy
To:
Region 3 Administrator
References
L-Pl-16-024
Download: ML16111A608 (2)


Text

ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

Page 1 fl Xcel Energy Regional Administrator, Region Ill U S Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 L-Pl-16-024 NUREG-1021 Prairie Island Nuclear Generating Plant (PINGP) Initial Operator Licensing Examination Materials

Reference:

1. Nuclear Regulatory Commission (NRC) letter to Mr. Kevin Davison, "Prairie Island Nuclear Generating Plant, Confirmation of Initial License Examination," dated November 13, 2015, Accession Number ML 15320A062.

In response to Reference 1, Northern States Power Company, a Minnesota Corporation doing business as Xcel Energy (hereafter "NSPM"), submits the written examinations, operating tests, and supporting reference materials (Enclosure

1) for the initial operator licensing examinations to be administered at PINGP the weeks of May 30 and June 6, 2016. This information is provided in accordance with guideline ES-201 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. NUREG-1021 physical security requirements state that the enclosed examination materials shall be withheld from public disclosure until after the examinations are complete.

1717 Wakonade Drive East

651.388.1121

,;; RECEIVED MAR 3 0 2016 ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Scott Northard Acting Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure cc: Dell McNeil, US NRC Region Ill, with enclosure Robert Orlikowski, US NRC Region Ill, without enclosure 1717 Wakonade Drive East

651.388.1121 ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

Page 1 fl Xcel Energy Regional Administrator, Region Ill U S Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 L-Pl-16-024 NUREG-1021 Prairie Island Nuclear Generating Plant (PINGP) Initial Operator Licensing Examination Materials

Reference:

1. Nuclear Regulatory Commission (NRC) letter to Mr. Kevin Davison, "Prairie Island Nuclear Generating Plant, Confirmation of Initial License Examination," dated November 13, 2015, Accession Number ML 15320A062.

In response to Reference 1, Northern States Power Company, a Minnesota Corporation doing business as Xcel Energy (hereafter "NSPM"), submits the written examinations, operating tests, and supporting reference materials (Enclosure

1) for the initial operator licensing examinations to be administered at PINGP the weeks of May 30 and June 6, 2016. This information is provided in accordance with guideline ES-201 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. NUREG-1021 physical security requirements state that the enclosed examination materials shall be withheld from public disclosure until after the examinations are complete.

1717 Wakonade Drive East

651.388.1121

,;; RECEIVED MAR 3 0 2016 ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Scott Northard Acting Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure cc: Dell McNeil, US NRC Region Ill, with enclosure Robert Orlikowski, US NRC Region Ill, without enclosure 1717 Wakonade Drive East

651.388.1121