ML20246G732

From kanterella
Jump to navigation Jump to search
Ile As-Administered Simulator JPMs
ML20246G732
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/27/2020
From:
Nuclear Management Co, Xcel Energy
To:
NRC/RGN-III/DRS/OLB
Callaway G
Shared Package
ML19127A306 List:
References
Download: ML20246G732 (78)


Text

Rev. 0 (1211412018)

A XcelEnergy JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION JPM NUMBER: VC.29SF REV. 3 RELATED PRA INFORMATION: NONE TASK NUMBERS /

TASK TITLE(S): GRO OOO 023 05 01 OO / INADVERTENT REACTIVITY CHANGES K/A NUMBERS: 004 A4.12 Rating SRO/RO: 3.8/3.3 APPLIGABLE METHOD OF TESTING:

Discussion: tr Simulate/walkthrough: I Perform: X EVALUATION LOCATION: ln-Plant: tr Control Room: tr Simulator: X other: tr Lab: tr Time for Completion: Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: x RO: x NLO I Additional site-specific si natures ma be added as desired.

Developed by: Fredrick Collins

-t1- 7az;s Developer Validated by: Jesse Maunu Validator (See JPM Validation Checklist,'Attachment 1)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 2 of 9 VC-29SF, MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION, Rev. 3 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Unit 1 is at 100% Power.

INITIATING CUES:

The Unit 1 Shift Supervisor directs you to perform a 10 gallon BORATION to the RCS using 1C12.5, Unit 1 Boron Concentration Control, section 5.10.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 3 of 9 VC-29SF, MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION, Rev. 3 JPM PERFORMANCE INFORMATION Required Materials: NONE General

References:

1C12.5, Unit 1 Boron Concentration Control FP-OP-COO-01, Conduct of Operations C12.5 AOP 2, Malfunction of Automatic Make-up Task Standards: Examinee takes makeup mode selector switch to borate and secures the boration.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1C12.5 Section 5.10 Critical N

1. IF not yet reviewed this shift, THEN perform a review of the precautions in section 5.7.

Standard: Examinee reviews precautions in section 5.7.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C12.5 Section 5.10 Critical N

2. Verify the Boric Acid Integrator is reset.

Standard: Examinee determines the Boric Acid Integrator is reset.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 4 of 9 VC-29SF, MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION, Rev. 3 Performance Step: 1C12.5 Section 5.10 Critical N

3. Set 1YIC-110, BA TO BLENDER BATCH INTEGRATOR, to the quantity desired.

Standard: Examinee sets 1YIC-110 to 10.0 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C12.5 Section 5.10 Critical Y

4. Place CS-46300, MAKE-UP MODE SELECTOR, to BORATE Standard: Examinee places CS-46300 to borate.

Evaluator Note: When the make-up mode selector switch is taken to borate, a boration will begin immediately.

Performance: SATISFACTORY UNSATISFACTORY Comments:

ALTERNATE PATH STARTS HERE Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 5 of 9 VC-29SF, MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION, Rev. 3 Performance Step: FP-OP-COO-01, 5.3.4 Conservative Bias, step 7:

Critical Y Operators understand plant conditions and know the appropriate action to take when plant or component control cannot be maintained, including stopping the evolution. Operators identify unexpected plant responses and take manual control when necessary to control or stabilize the plant.

Stop makeup flow using one or more of the following methods:

A. Place CS-46300, MAKE-UP MODE SELECTOR TO OFF.

B. 1HC110, BA TO BLENDER FLOW CONT CV-31199, to MANUAL and CLOSE C. STOP the reactor makeup pumps and boric acid transfer pumps o CS-46161, 11 BORIC ACID TRANSFER PUMP D. CLOSE CV-31200, BA BLENDER TO VC TNK OUTLT E. CLOSE CV-31199, BA INLT TO BLENDER Standard: Examinee secures the boration.

Evaluator Note There are multiple ways to stop the boration. A list of the effective methods from C12.5 AOP2, in addition to appropriate valve isolations, are listed above.

Evaluator Cue: If examinee informs the evaluator about the automatic boration malfunction, as examinee as the Shift Supervisor what action they recommend taking to remedy the situation.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the examinee takes makeup mode selector switch to borate and secures the boration, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 6 of 9 VC-29SF, MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION, Rev. 3 Simulator Setup:

1. If running this JPM in conjunction with VC-104S and/or RC-26S, & ZC-1SF, then refer to ZC-1SF for set up instructions. If not, then continue with next step.
2. Reset the simulator to designated IC created for this JPM.
3. Place the simulator in RUN and go to step 5.
4. If an IC is NOT created for this scenario, then create as follows:
a. Reset to IC-10.
b. Place the simulator in RUN.
5. If available, run schedule file VC-29SF.sch as follows:
a. Select open file in the Schedule application.
b. Locate schedule file.
c. Open schedule file by double clicking it.
d. Run the schedule file by pressing the Stopped button on the toolbar.
e. Verify the schedule file is running.
6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
7. If available, open event file VC-29SF.evt as follows:
a. Select open file in the EVENT application.
b. Locate event file.
c. Open by double clicking file.
8. If event file is NOT available, then enter event codes as specified by the Simulator Event Summary below.
9. Place simulator in FREEZE.
10. If desired, save to an available IC.
11. Place simulator in RUN.
12. Place a yellow CAUTION TAG on CS-46294, 13 CHG PUMP.
13. Clear recorder memory after each reset.
14. Verify Boric Acid and RMU Counters are RESET after each reset.
15. Verify Director or Schedule File matches the input summary below.

SIMULATOR INPUT

SUMMARY

SIMULATOR EVENT

SUMMARY

Event ID Event CODE Event DESCRIPTION BORIC ACID MU CONTROL TO 1 ZVCR457(1)==1 START Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 7 of 9 VC-29SF, MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION, Rev. 3 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 8 of 9 VC-29SF, MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION, Rev. 3 ATTACHMENT 2 JPM Number: VC-29SF JPM

Title:

MALFUNCTION OF AUTOMATIC MAKEUP DURING BORATION, REV. 3 Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 9 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Unit 1 is at 100% Power.

INITIATING CUES:

The Unit 1 Shift Supervisor directs you to perform a 10 gallon BORATION to the RCS using 1C12.5, Unit 1 Boron Concentration Control, section 5.10.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12t14t2018)

O XcetEnergy- JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: PERIODIC ROTATION OF CHARGING PUMPS JPM NUMBER: RC-265 REV. O RELATED PRA NONE INFORMATION:

TASK NUMBERS / CRO 011 ATI OO OO OO2 TRANSFER CHARGING PUMPS TASK TTTLE(S): TO/FROM MANUAL AND AUTOMATIC l(lA NUMBERS: 004 A4.08 Rating SRO/RO: 3.8/3.4 APPLICABLE IVIETHOD OF TESTING:

Discussion: I Simulateiwalkthrough: f per-form:

X EVALUATION LOCATTON: tn_ptant. f Control Room: I Simulator: X other: I Lab: T Time for Completion: 8 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X Ro: X NLo tr Additional site-specific si natures ma be added as desired.

Developed by:

J/*s

--r-G6-/

Validated by:

Validator

,b/

Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Retention: Life of plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-O1.

Rev. 0 (12/14/2018) Page 2 of 10 RC-26S, PERIODIC ROTATION OF CHARGING PUMPS, REV. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is at 100%.
  • You are the Unit 1 Reactor Operator.

INITIATING CUES (IF APPLICABLE):

  • The Shift Supervisor directs you place 11 Charging Pump in MANUAL and 12 Charging Pump in AUTOMATIC per section 6.6 of 1C12.1, Letdown, Charging, and Seal Water Injection - Unit 1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 3 of 10 RC-26S, PERIODIC ROTATION OF CHARGING PUMPS, REV. 0 JPM PERFORMANCE INFORMATION Required Materials:

  • NONE General

References:

  • 1C12.1 Letdown, Charging, and Seal Water Injection - Unit Task Standards:
  • Examinee places 11 Charging Pump in MANUAL and 12 Charging Pump in AUTOMATIC.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1C12.1, step 6.6.1:

Critical Y IF it is desired to swap auto speed control between two running Charging Pumps, THEN perform the following:

A. Transfer the speed control for the charging pump operating in AUTOMATIC to MANUAL per C7, Reactor Control System.

  • 1HC428A, 11 CHG PUMP SPEED CONT Standard: Examinee places 11 Charging Pump speed control to MANUAL.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 4 of 10 RC-26S, PERIODIC ROTATION OF CHARGING PUMPS, REV. 0 Performance Step: C7 6.3.1.A:

Critical N Switching from Automatic to Manual Control:

Place the transfer switch in the AUTO-BALANCE position.

Standard: Examinee places 1HC428A,11 Charging Pump speed control, transfer switch in MANUAL-BALANCE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C7 6.3.1.B:

Critical N Switching from Automatic to Manual Control:

Adjust the MANUAL control knob for zero deviation on the deviation indicator.

Standard: Examinee adjusts the 1HC428A MANUAL control knob for zero deviation on the deviation indicator.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C7 6.3.1.C:

Critical N Switching from Automatic to Manual Control:

Place the transfer switch in the MANUAL position.

Standard: Examinee places 1HC428A, 11 Charging Pump speed control, transfer switch to MANUAL.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 5 of 10 RC-26S, PERIODIC ROTATION OF CHARGING PUMPS, REV. 0 Performance Step: 1C12.1, step 6.6.1:

Critical Y IF it is desired to swap auto speed control between two running Charging Pumps, THEN perform the following:

A. Raise the speed of the pump to be placed to AUTOMATIC while reducing the speed of the second pump.

  • 1HC428B, 12 CHG PUMP SPEED CONT Standard: Examinee raises speed of 12 Charging Pump while reducing speed of 11 Charging Pump.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C12.1, step 6.6.1:

Critical Y IF it is desired to swap auto speed control between two running Charging Pumps, THEN perform the following:

B. WHEN charging pump flow and pressurizer level are stable, THEN transfer the desired pump to AUTOMATIC per C7, Reactor Control System.

  • 1HC428B, 12 CHG PUMP SPEED CONT Standard: Examinee places 12 Charging Pump speed control to AUTOMATIC.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C7 6.3.2.A:

Critical N Switching from Manual to Automatic Control:

Place the transfer switch in the MANUAL-BALANCE position.

Standard: Examinee places 1HC428A, 11 Charging Pump speed control, transfer switch to MANUAL-BALANCE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 6 of 10 RC-26S, PERIODIC ROTATION OF CHARGING PUMPS, REV. 0 Performance Step: C7 6.3.2.B:

Critical N Switching from Manual to Automatic Control:

Adjust the BIAS dial for zero deviation on the deviation indicator.

Standard: Examinee adjusts the 1HC428A BIAS dial for zero deviation on the deviation indicator.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C7 6.3.2.C:

Critical N Switching from Manual to Automatic Control:

Place the transfer switch in the AUTO position.

Standard: Examinee places 1HC428A, 11 Charging Pump speed control, transfer switch to AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C7 6.3.2.D:

Critical N Switching from Manual to Automatic Control:

Over the next several minutes, adjust the BIAS dial to 0.

Standard: Examinee adjusts 1HC428A, 11 Charging Pump speed control, BIAS dial as necessary.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee places 11 Charging Pump in MANUAL and 12 Charging Pump in AUTOMATIC, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 7 of 10 RC-26S, PERIODIC ROTATION OF CHARGING PUMPS, REV. 0 Simulator Setup:

1. If an IC is already created for this JPM, then go to step 3.
2. If an IC is NOT created for this JPM, then create one as follows:
a. Reset to IC-10.
b. Verify 11 Charging Pump is running in AUTOMATIC and 12 Charging Pump is running in MANUAL at minimum speed.
c. Place simulator in RUN.
3. If running this JPM in conjunction with ZC-1SF and/or VC-29SF, then place a yellow CAUTION TAG on CS-46294, 13 CHG PUMP.
4. Clear recorder memory after each reset.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 8 of 10 RC-26S, PERIODIC ROTATION OF CHARGING PUMPS, REV. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 9 of 10 RC-26S, PERIODIC ROTATION OF CHARGING PUMPS, REV. 0 ATTACHMENT 2 JPM Number: RC-26S JPM

Title:

PERIODIC ROTATION OF CHARGING PUMPS Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 10 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is at 100%.
  • You are the Unit 1 Reactor Operator.

INITIATING CUES (IF APPLICABLE):

  • The Shift Supervisor directs you place 11 Charging Pump in MANUAL and 12 Charging Pump in AUTOMATIC per section 6.6 of 1C12.1, Letdown, Charging, and Seal Water Injection - Unit 1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12t14t2018)

O XcetEnergy" JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE JPM NUMBER: RC-2sSF REV. O RELATED PRA IMPORTANT COMPONENT INFORMATION: - 1 PRZR PORV B CV TASK NUMBERS / CRO O{O OOl 01 01 OOO GONTROL PRZR PRESSURRE TASK TITLE(S): USING H EATE RS/S PRAY MAN UA LLY CRO Of O OO7 01 01 OOO / MONITOR THE PRZR PRESSURE RELIEF SYSTEM I(7A NUMBERS: 007 A4.10 Rating SRO/RO: 3.6/3.8 APPLICABLE METHOD OF TESTING:

Discussion. f Simulate/walkthrough: I perform: X EVALUATION LOCATTON: tn_ptant: I Control Room: I Simulator: X other. f Time for Completion:

Lab. r Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: X Ro: X NLo r Additional site-specific si natures ma be added as desired.

Developed by:

Validated by:

(See JPM Validation Checklist, Attachment

"/*A 1)

Retention: Life of plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 2 of 10 RC-25SF, ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE, REV. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Unit 1 is at 100%.

You are the Unit 1 Reactor Operator.

Crew is making preparations for Flexible Power Operations next shift.

INITIATING CUES (IF APPLICABLE):

The Shift Supervisor directs you to energize PRZR Back-up Heaters per step 5.5.1 of 1C4, Reactor Coolant System.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 3 of 10 RC-25SF, ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE, REV. 0 JPM PERFORMANCE INFORMATION Required Materials: NONE General

References:

1C4, Reactor Coolant System C47012-0406, PRZR RELIEF TANK HI TEMP/LVL/PRESS OR LO LVL C47012-0506, PRZR POWER RELIEF LINE HI TEMP Task Standards: Examinee energizes at least one group of PRZR Back-up Heaters and isolates CV-31231 leakage by closing MV-32195.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1C4, step 5.5.1:

Critical Y IF desired, THEN turn on pressurizer backup heaters as follows:

Place CS-46241, 1 SFGD PRZR BACK-UP HTRS GRP A ON/AUTO/OFF CS, to ON.

Standard: Examinee places CS-46241 to ON.

Evaluator Note: PRZR Back-up heaters can be energized in any order. Event Trigger 1 will enter when Group A heaters are energized. Depending on examinee pace and timing all back-up heaters may or may not be energized prior to relief line high temp alarm coming in.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 4 of 10 RC-25SF, ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE, REV. 0 Performance Step: 1C4, step 5.5.1:

Critical N IF desired, THEN turn on pressurizer backup heaters as follows:

Place CS-46242, 1 SFGD PRZR BACK-UP HTRS GRP B ON/AUTO/OFF CS, to ON.

Standard: Examinee places CS-46242 to ON.

Evaluator Note: Examinee may or may not complete this step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C4, step 5.5.1:

Critical N IF desired, THEN turn on pressurizer backup heaters as follows:

Place CS-46244, 1 PRZR BACK-UP HTRS GRP D ON/AUTO/OFF CS, to ON.

Standard: Examinee places CS-46244 to ON.

Evaluator Note: Examinee may or may not complete this step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C4, step 5.5.1:

Critical N IF desired, THEN turn on pressurizer backup heaters as follows:

Place CS-46245, 1 PRZR BACK-UP HTRS GRP E ON/AUTO/OFF CS, to ON.

Standard: Examinee places CS-46245 to ON.

Evaluator Note: Examinee may or may not complete this step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 5 of 10 RC-25SF, ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE, REV. 0 ALTERNATE PATH STARTS HERE Performance Step: C47012-0506, step 1:

Critical N Check pressurizer relief line temperature.

Standard: Examinee determines pressurizer relief line temperature is abnormally high.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C47012-0506, step 2.A:

Critical N Check pressurizer pressure.

A. If pressure high, then control pressure in manual utilizing heaters and sprays.

Standard: Examinee determines pressurizer pressure is normal (not high).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C47012-0506, step 2.B:

Critical N Check pressurizer pressure.

B. Verify power operated relief reseated by noting relief line temperature decrease, valve position indication, and relief valve flow monitor lights.

Standard: Examinee determines PRZR PORV continues to leak.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 6 of 10 RC-25SF, ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE, REV. 0 Performance Step: C47012-0506, step 2.C.1.a:

Critical Y Check pressurizer pressure.

C. If pressure normal, then isolate power operated reliefs one at a time to determine which valve is leaking:

1) Isolate CV-31231 by performing the following:

a) Close MV-32195 PRZR RELIEF ISOL (1-8000A) using CS-46263.

Standard: Examinee isolates CV-31231 by closing MV-32195 using CS-46263.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C47012-0506, step 2.C.1.b:

Critical N Check pressurizer pressure.

C. If pressure normal, then isolate power operated reliefs one at a time to determine which valve is leaking:

1) Isolate CV-31231 by performing the following:

b) Observe relief line temperature.

Standard: Examinee determines relief line temperature is lowering.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee has energized at least 1 group of PRZR Back-up Heaters and has isolated CV-31231 by closing MV-32195, then this JPM is complete.

Stop Time:

Historical Record:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 7 of 10 RC-25SF, ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE, REV. 0 Simulator Setup:

1. Perform the following to set up the simulator:
a. Reset to IC-10.
b. Place simulator in RUN.
c. If available, run schedule file RC-25SF.sch as follows:
1) Select open file in the Schedule application.
2) Locate schedule file.
3) Open schedule file by double clicking it.
4) Run the schedule file by pressing the Stopped button on the toolbar.
5) Verify the schedule file is running.
d. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary below.
e. If available, run event file RC-25SF.evt as follows:
1) Select open file in the EVENT application.
2) Locate event file.
3) Open by double clicking file.
f. If event file is NOT available, then enter event codes as specified by the Simulator Event Summary below.
2. Clear recorder memory after each reset.

SIMULATOR INPUT

SUMMARY

SIMULATOR EVENT

SUMMARY

Event ID Event CODE Event DESCRIPTION HWZRXSHTA(1)==1 1 GROUP A PRZR HEATERS ENERGIZED Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 8 of 10 RC-25SF, ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE, REV. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 9 of 10 RC-25SF, ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE, REV. 0 ATTACHMENT 2 JPM Number: RC-25SF JPM

Title:

ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO PRZR PORV LEAKAGE Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 10 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Unit 1 is at 100%.

You are the Unit 1 Reactor Operator.

Crew is making preparations for Flexible Power Operations next shift.

INITIATING CUES (IF APPLICABLE):

The Shift Supervisor directs you to energize PRZR Back-up Heaters per step 5.5.1 of 1C4, Reactor Coolant System.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075.01 Rev. S (FP-T-SAT-ZS)

Page 1 of 11 O XcelEnergy" JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: LOSS OF COOLING WATER HEADER PRESSURE JPM NUMBER: CL.11SF REV.

RELATED PRA LOCL (<1%l 4i^r INFORMATION: IMPORTANT COMPONENT .12 DD CLG WTR PMP IMPORTANT COMPONENT

- 22 DD CLG WTR PMP TASK NUMBERS / CRO 076 ATI OO OO OA2ISHUTDOWN A COOLING WATER PUMP TASK TITLE(S): CRO 076 ATI OO OO O,l3 / LOSS OF PUMPING CAPAGITY OR HEADER WITHOUT SI

}(/A NUMBERS: 075 A4.01 (3.2"13.2*l APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough  : Pefform:

EVALUATION LOCATTON: tn-ptant:

tl Control Room: []

Simulator:

E Other: []

Lab: t:]

Time for Completion: Minutes Time Critical: NO Alternate Path: YES TASK APPLICABlLlW: SRO:

Additjonal site-specific signatures ma be ad E rn NLo tl desired Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in Fp-G-RM-01,

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 2 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Unit 1 is at 100%.

11 and 21 Motor Driven Cooling Water Pumps are RUNNING.

12 and 22 Diesel Driven Cooling Water Pumps are in STANDBY.

121 Motor Driven Cooling Water Pump is RUNNING.

121 Motor Driven Cooling Water Pump is NOT aligned as a safeguards pump.

Steps 5.10.1 through 5.10.3 of C35, COOLING WATER, are complete.

An out-plant operator is stationed near the 121 Motor Driven Cooling Water Pump with a radio.

INITIATING CUES:

The SS directs you to secure 121 Motor Driven Cooling Water Pump by performing steps 5.10.4 through 5.10.6 of C35, COOLING WATER.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 3 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1 JPM PERFORMANCE INFORMATION Required Materials: NONE General

References:

C35, COOLING WATER C35 AOP2, LOSS OF PUMPING CAPACITY OR SUPPLY HEADER WITHOUT SI C47020-0106,11 COOLING WATER PUMP LOCKED OUT Task Standards: Examinee secures 121 Motor Driven Cooling Water Pump and restores cooling water header pressure above 85 psig when 11 Motor Driven Cooling Water Pump locks out.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: C35, COOLING WATER, Step 5.10.4 Critical N While monitoring 4101202 or 4150402 [4101302 or 4150502], LOOP A [B]

CLG WTR DISCH HDR PRESS, CLOSE CL-39-3, 121 CLG WTR PUMP DISCH.

Standard: Examinee monitors Cooling Water Header Pressure while directing an out-plant operator to close CL-39-3.

EVALUATOR CUE: When examinee directs an out-plant operator to close CL-39-3, enter TRIGGER 1, wait 1 minute, and then inform examinee CL-39-3 is closed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 4 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1 Performance Step: C35, COOLING WATER, Step 5.10.5 Critical N IF either Header A or B pressure lowers to below 85 psig or Annunciator 47020-0204 OR 47520-0203 [47020-0205 OR 470520-0204], LOOP A [B]

COOLING WATER LO PRESS, alarms THEN:

A. OPEN CL-39-3, 121 CLG WTR PUMP DISCH.

B. Perform one of the following:

1. Start another cooling water pump AND return to Step 5.10.4.

OR

2. Leave 121 Cooling Water Pump in service AND go to Step 5.10.7.

Standard: Examinee determines this step is NOT applicable because Cooling Water Header Pressure is stable above 85 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C35, COOLING WATER, Step 5.10.6 Critical Y IF cooling water pressure is maintained, THEN:

A. Place CS-46052, 121 CLG WTR PUMP, in STOP.

Standard: Examinee stops 121 CLG WTR PUMP using CS-46052.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 5 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1 Performance Step: C35, COOLING WATER, Step 5.10.6 Critical N IF cooling water pressure is maintained, THEN:

B. OPEN CL-39-3, 121 CLG WTR PUMP DISCH.

Standard: Examinee directs an out-plant operator to open CL-39-3.

EVALUATOR CUE: When examinee directs an out-plant operator to open CL-39-3, acknowledge the order, wait 1 minute, and then report CL-39-3 is stuck in the closed position.

After the report for CL-39-3 being stuck closed is given, enter TRIGGER 2 to cause 11 Motor Driven Cooling Water Pump to lockout.

EVALUATOR NOTE: Examinee may place 121 CLG WTR PUMP in PULLOUT to prevent auto start.

This is NOT a JPM failure.

Performance: SATISFACTORY UNSATISFACTORY Comments:

ALTERNATE PATH STARTS HERE Performance Step: C47020-0106,11 COOLING WATER PUMP LOCKED OUT, Step 1 Critical N Verify Cooling Water Header pressure restored to normal.

Standard: Examinee determines cooling water header pressure is NOT restored to normal.

EVALUATOR NOTE: The examinee may respond using C47020-0204, C47020-0205, C47520-0203, C47520-0204, or C35 AOP2 instead of C47020-0106.

EVALUATOR CUE: If the examinee requests the status of Unit 2 SI and Non-Safeguards 4KV Buses, then inform examinee SI is NOT active on Unit 2 and all Unit 2 Non-Safeguards 4KV Buses are ENERGIZED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 6 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1 Performance Step: C47020-0106,11 COOLING WATER PUMP LOCKED OUT, Step 1 (continued)

Critical Y Start available Cooling Water Pumps, as necessary.

Standard: Examinee starts at least one Cooling Water Pump as follows:

12 Diesel Driven Cooling Water Pump

1. Place CS-46336 in MANUAL.
2. Momentarily place CS-46053 in START.

AND/OR 22 Diesel Driven Cooling Water Pump

1. Place CS-46537 in MANUAL.
2. Momentarily place CS-46523 in START.

EVALUATOR NOTE: The examinee may respond using C47020-0204, C47020-0205, C47520-0203, C47520-0204, or C35 AOP2 instead of C47020-0106.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the examinee has secured 121 Motor Driven Cooling Water Pump and has restored Cooling Water Header Pressure above 85 psig when 11 Motor Driven Cooling Water Pump locks out, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 7 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1 Simulator Setup:

1. If an IC is already created for this JPM, then go to step 3.
2. If an IC is NOT created for this scenario, then create as follows:
a. Reset to IC-10.
b. Place the simulator in RUN.
c. Start 121 Motor Driven Cooling Water Pump using CS-46052.
d. Increase Cooling Water load as follows:
1) D1 Diesel Generator:

(a) Start D1 using CS-46935, D1 DIESEL GENERATOR.

(b) Place CS-46902, D1 DSL GEN EXCITER CONTROL SEL SW, in MANUAL.

(c) Place CS-46948, BKR 15-2 MAN/AUTO CLOSURE SEL SW, in MANUAL.

(d) Place CS-46906, BUS 15 SYNCHROSCOPE SEL SW, in D1.

(e) Adjust CS-46934, D1 DSL GEN GOVERNOR SPEED CONTROL, until the indicator on 41911, SYNCHROSCOPE, is turning slowly in a clockwise direction.

(f) As the synchroscope indicator approaches 12 oclock, CLOSE BKR 15-2 using CS-46950, BUS 15 SOURCE FROM D1 DSL GEN.

(g) Place CS-46948, BKR 15-2 MAN/AUTO CLOSURE SEL SW, in AUTO.

(h) Place CS-46906, BUS 15 SYNCHROSCOPE SEL SW, in OFF.

(i) Raise D1 load to approximately 2060 KW using CS-46934, D1 DSL GEN GOVERNOR SPEED CONTROL.

(j) Raise D1 VARs to approximately 1000 KVARs by adjusting CS-46933, D1 DSL GEN EXCITER CONTROL.

2) Cooling Water to Unit 1 and Unit 2 CFCUs:

(a) Perform the following for the switches listed below:

(1) Place all four switches to ISOL.

(2) Wait one minute.

(3) Place all four switches to RESET.

(4) Place all four switches to AUTO.

CS-46080, TRAIN A - UNIT 1 CLG WTR/CHILLED WTR ISOL VALVES.

CS-46081, TRAIN B - UNIT 1 CLG WTR/CHILLED WTR ISOL VALVES.

CS-46772, TRAIN A - UNIT 2 CLG WTR/CHILLED WTR ISOL VALVES.

CS-46773, TRAIN B - UNIT 2 CLG WTR/CHILLED WTR ISOL VALVES.

(b) Insert remote CH128, 11/12 CRDM CLG COIL SPLY/RTN VLVs, to OPEN.

e. On the Unit 1 G-Panel ERCS display, run a TREND-4 with the following points:

(a) 1P2601A (b) 1P2602A (c) 1F2609A (d) 1F2610A

f. Place simulator in FREEZE.
g. If desired, save to an available IC.
h. Place simulator in RUN.
i. Go to step 4.
3. Reset the simulator to IC-255, or the IC created from step 2 and place in RUN.
4. Verify total cooling water flow rate is approximately 18000 GPM.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 8 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1

5. If available, run schedule file CL-11SF.sch as follows:
a. Select open file in the Schedule application.
b. Locate schedule file.
c. Open schedule file by double clicking it.
d. Run the schedule file by pressing the Stopped button on the toolbar.
e. Verify the schedule file is running.
6. If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
7. Verify the G-Panel ERCS computer is displaying as set-up in step 2.e.
8. Markup steps 5.10.1 - 5.10.3 of C35 as complete.

SIMULATOR INPUT

SUMMARY

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 9 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 10 of 11 CL-11SF, LOSS OF COOLING WATER HEADER PRESSURE, REV. 1 ATTACHMENT 2 JPM Number: CL-11SF JPM

Title:

LOSS OF COOLING WATER HEADER PRESSURE Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 5 (FP-T-SAT-75) Page 11 of 11 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Unit 1 is at 100%.

11 and 21 Motor Driven Cooling Water Pumps are RUNNING.

12 and 22 Diesel Driven Cooling Water Pumps are in STANDBY.

121 Motor Driven Cooling Water Pump is RUNNING.

121 Motor Driven Cooling Water Pump is NOT aligned as a safeguards pump.

Steps 5.10.1 through 5.10.3 of C35, COOLING WATER, are complete.

An out-plant operator is stationed near the 121 Motor Driven Cooling Water Pump with a radio.

INITIATING CUES:

The SS directs you to secure 121 Motor Driven Cooling Water Pump by performing steps 5.10.4 through 5.10.6 of C35, COOLING WATER.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (1?11412018)

'W,XcelEnergy JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS JPM NUMBER: ZC-1SF REV. 2 RELATED PRA NONE INFORMATION:

TASK NUMBERS I CRO 022 ATI OO OO AO7 ICHANGE FAN COIL UNIT FAN SPEED TASK TITLE(S)r K/A NUMBERS: 022 A4.01 Rating SROIRO: 3.6/3.6 APPLICABLE METHOD OF TESTING:

Discuss!on: I Simulate/walkthrough: n Perform: X EVALUATION LOCATION: ln-Plant: tr Control Room: T Simulator: x Other: I Lab: tr Time for Completion: 7 Minutes T[me Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: X RO: X NLO tr Additional si be added as desired.

Retention. Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 2 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Unit 1 is at 100% power.

11 FCU is in FAST to the SUPPORT COOLING.

12 FCU is in SLOW to the DOME.

13 FCU is in FAST to the GAP.

14 FCU is in SLOW to the DOME.

INITIATING CUES:

The SS directs you to alternate FCUs per Section 6.6.4.A of 1C19.2, Containment System Ventilation Unit 1, as follows:

11 FCU in SLOW to the DOME.

12 FCU in FAST to the SUP CLG.

13 FCU in SLOW to the DOME.

14 FCU in FAST to the GAP.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 3 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 JPM PERFORMANCE INFORMATION Required Materials: If desired, provide consumable copies of 1C19.2 with the appropriate items N/Ad, circled, and one-lined.

General

References:

1C19.2, CONTAINMENT SYSTEM VENTILATION UNIT 1 C47019-0405, 12 CONTAINMENT FAN COIL UNIT MOTOR STATOR HI TEMP Task Standards: Examinee alternates FCUs, stops 12 FCU due to high temperature, and re-aligns 11 FCU to SUPPORT in fast speed.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1C19.2, step 6.6.4.A.1:

Critical Y Containment Fan Coil Fans and Discharge Dampers

1. Shift the desired fan coil units to SLOW by placing the control switch in OFF for 15 seconds, then placing the control switch in SLOW:

CS-46018, 11 CNTMT FAN COIL UNIT CS-46020, 12 CNTMT FAN COIL UNIT CS-46019, 13 CNTMT FAN COIL UNIT CS-46021, 14 CNTMT FAN COIL UNIT Standard: Examinee shifts 11 and 13 FCUs to slow speed using CS-46018 and CS-46019.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 4 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 Performance Step: 1C19.2, step 6.6.4.A.2:

Critical Y Align fan coil unit discharge dampers as desired, observing Precaution 4.7:

CS-46440, 11 FCU DISCH TO CNTMT DOME/SUPPORT DMPRS CS-46441, 12 FCU DISCH TO CNTMT DOME/SUPPORT DMPRS CS-46442, 13 FCU DISCH TO CNTMT DOME/GAP DAMPERS CS-46443, 14 FCU DISCH TO CNTMT DOME/GAP DAMPERS Standard: Examinee aligns FCU Discharge dampers as follows:

11 CFCU to DOME using CS-46440 12 CFCU to SUPPORT using CS-46441 13 CFCU to DOME using CS-46442 14 CFCU to GAP using CS-46443 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C19.2, step 6.6.4.A.3:

Critical N Verify associated white fan coil unit damper improper lights remain NOT LIT:

ML-44002-0101, 11 CNTMT FCU DISCH DMPRS IMPROPER ML-44002-0102, 12 CNTMT FCU DISCH DMPRS IMPROPER ML-44002-0201, 13 CNTMT FCU DISCH DMPRS IMPROPER ML-44002-0202, 14 CNTMT FCU DISCH DMPRS IMPROPER Standard: Examinee determines the IMPROPER lights are NOT lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 5 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 Performance Step: 1C19.2, step 6.6.4.A.4:

Critical Y Shift the desired fan coil units to FAST by placing the control switch in OFF for at least one (1) second, then placing the control switch in FAST:

CS-46018, 11 CNTMT FAN COIL UNIT CS-46020, 12 CNTMT FAN COIL UNIT CS-46019, 13 CNTMT FAN COIL UNIT CS-46021, 14 CNTMT FAN COIL UNIT Standard: Examinee shifts 12 and 14 FCUs to fast speed using CS-46020 and CS-46021.

Evaluator Note: When examinee places CS-46020 & CS-46021, 12 & 14 CFCUs, in FAST, then verify AUTO Trigger 1, 12 CFCU High temp, is entered.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C47019-0405, 12 CONTAINMENT FAN COIL UNIT MOTOR STATOR HI TEMP Critical N ALTERNATE PATH STARTS HERE Standard: Examinee acknowledges annunciator.

Evaluator Note: 12 CFCU high stator temperature annunciator alarms 5 seconds after BOTH 12 & 14 CFCUs are in fast speed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 6 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 Performance Step: C47019-0405, step 1:

Critical N Verify one of 12 FCU discharge dampers is OPEN. IF necessary, THEN open appropriate damper using CS-46441, 12 FCU DISCH TO DOME/SUPPORT CD-34074/34075 CS.

Standard: Examinee determines one of 12 FCU discharge dampers are already open.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C47019-0405, step 2:

Critical N Verify cooling water alignment to 12 FCU:

MV-32379, 12 FCU CLG WTR INLT ISOL MV, OPEN.

MV-32135, 12 FCU CLG WTR OUTL ISOL MV A, OPEN.

MV-32136, 12 FCU CLG WTR OUTL ISOL MV B, OPEN.

Standard: Examinee determines cooling water is aligned to 12 FCU.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C47019-0405, step 3.A:

Critical Y IF Steps 1 & 2 did not cause stator temperature to decrease to below alarm setpoint, THEN perform the following:

1) Stop 12 FCU (FCU is not considered inoperable at this time).

Standard: Examinee stops 12 CFCU using CS-46020.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 7 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 Performance Step: C47019-0405, step 3.B:

Critical Y

2) Verify CD-34073, 11 FCU NORM DISCH TO RX VESSEL SUPPORT, OPEN.

Standard: Examinee aligns 11 FCU to SUPPORT using CS-46440.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C47019-0405, step 3.C:

Critical Y

3) Verify 11 CFCU running in fast.

Standard: Examinee shifts 11 FCU to fast speed using CS-46018.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the examinee has alternated FCUs, stopped 12 FCU due to high temperature, and has re-aligned 11 FCU to SUPPORT in fast speed, then this JPM is complete.

Stop Time:

Historical Record:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 8 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 Simulator Setup:

1. Reset the simulator to IC developed for this JPM.
2. Place the simulator in RUN and go to step 4.
3. If an IC is NOT created for this JPM, then create one as follows:
a. Reset simulator to IC-10 and place in RUN.
b. If running this JPM in conjunction with VC-104S, then:
1) Take CS-46294, 13 CHG PUMP, to PULLOUT.
2) If also running this JPM in conjunction with VC-29SF, then go to step 3.d, if not then continue with next step.
3) Place simulator in FREEZE.
4) If desired, save to an available IC.
5) Place simulator in RUN.
6) Go to step 4.
c. If running this JPM in conjunction with RC-26S, then:
1) Verify 11 Charging Pump is running in AUTOMATIC and 12 Charging Pump is running in MANUAL at minimum speed.
2) If also running this JPM in conjunction with VC-29SF, then go to step 3.d, if not then continue with next step.
3) Place simulator in FREEZE.
4) If desired, save to an available IC.
5) Place simulator in RUN.
6) Go to step 4.
d. If also running this JPM in conjunction with VC-29SF, then:
1) If available, run schedule files ZC-1SF.sch & VC-29SF.sch as follows:

(a) Select open file in the Schedule application.

(b) Locate schedule file.

(c) Open schedule file by double clicking it.

(d) Run the schedule file by pressing the Stopped button on the toolbar.

(e) Verify the schedule file is running.

2) If schedule file is NOT available, then insert malfunctions, remotes, and overrides, as specified by the Simulator Input Summary.
3) If available, open event file ZC-1SF.evt & VC-29SF.evt as follows:

(a) Select open file in the EVENT application.

(b) Locate event file.

(c) Open by double clicking file.

4) If event file is NOT available, then enter event codes as specified by the Simulator Event Summary below.
5) Place simulator in FREEZE.
6) If desired, save to an available IC.
7) Place simulator in RUN.
8) Go to step 4.
4. Reset the simulator to designated IC or the IC created from step 3 and place in RUN.
5. Place yellow CAUTION tag on CS-46294, 13 CHG PUMP.
6. Clear recorder memory after each reset.
7. Verify Director or Schedule File matches the input summary below.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 9 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 SIMULATOR INPUT

SUMMARY

SIMULATOR EVENT

SUMMARY

Event ID Event CODE Event DESCRIPTION BORIC ACID MU CONTROL TO 1 ZVCR457(1)==1 START 2 HWZCHFFCF(2)==1 & HWZCHFFCF(4)==1 12 & 14 CFCUs IN FAST Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 10 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 11 of 12 ZC-1SF, CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS Rev. 2 ATTACHMENT 2 JPM Number: ZC-1SF JPM

Title:

CFCU HIGH TEMP WHILE ALTERNATING FAN COIL UNITS, REV. 2 Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 12 of 12 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

Unit 1 is at 100% power.

11 FCU is in FAST to the SUPPORT COOLING.

12 FCU is in SLOW to the DOME.

13 FCU is in FAST to the GAP.

14 FCU is in SLOW to the DOME.

INITIATING CUES:

The SS directs you to alternate FCUs per Section 6.6.4.A of 1C19.2, Containment System Ventilation Unit 1, as follows:

11 FCU in SLOW to the DOME.

12 FCU in FAST to the SUP CLG.

13 FCU in SLOW to the DOME.

14 FCU in FAST to the GAP.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (1211412018)

O XcelEnergy" JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: MANUAL START OF D1 EMERGENCY DIESEL GENERATOR FROM THE CONTROL ROOM JPM NUMBER: EG.4S REV. 16 RELATED PRA IMPORTANT COMPONENT - Dl DSL GEN INFORMATION:

TASK NUMBERS / CRO 064 ATI OO OO OO2 I MANUALLY START DG FROM CONTROL TASK T!TLE(S): ROOM K/A NUMBERS: 064 A3.06 Rating SRO/RO: 3.3/3.4 APPLICABLE METHOD OF TESTING:

Discussion: tr Simulate/walkthrough: tr Perform: X EVALUATION LOCATION: In-Plant: tr Control Room: tr Simulator: X other: tr Lab: tr Time for Completion: 6 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLotr Additional site-specific si natures ma be added as Developed by: Cp ui 't

\

Validated by:

(See JPM Vdlidation Checklist, Attachment 1)

Approved by: Sara*s, Traininq Superuisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 2 of 10 EG-4S, MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM, REV.16 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Steps 5.1.1.A through 5.1.1.E of 1C20.7, D1/D2 DIESEL GENERATORS, have been completed.

INITIATING CUES:

  • The Shift Supervisor directs you to manually start D1 Emergency Diesel Generator per steps 5.1.1.F through 5.1.1.N of 1C20.7, D1/D2 Diesel Generators.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 3 of 10 EG-4S, MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM, REV.16 JPM PERFORMANCE INFORMATION Required Materials:

  • NONE General

References:

  • 1C20.7, D1/D2 DIESEL GENERATORS Task Standards:
  • Examinee starts D1 and places voltage control in manual.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1C20.7, step 5.1.1.F Critical N Verify the two (2) amber indicating lights on 44901, D1 DIESEL GEN GOV READY LIGHTS, are LIT.

Standard: Examinee verifies amber indicating lights are LIT.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 4 of 10 EG-4S, MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM, REV.16 Performance Step: 1C20.7, step 5.1.1.G Critical N Verify the governor load limit is set at (10).

Standard: Examinee directs an out-plant operator to perform step G.

Evaluator Cue: When examinee directs out-plant operator to perform step G, then inform examinee that the governor load limit is set at 10.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C20.7, step 5.1.1.H Critical N Commence a three (3) minute prelube by placing and holding CS-55313, D1 DSL GEN PRELUBE OIL PMP CS, in the ON position.

Standard: Examinee directs an out-plant operator to perform step H.

Evaluator Cue: When examinee directs an out-plant operator to perform step H & I, then inform examinee that CS-55313 is in the ON position and the prelube pump is running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 5 of 10 EG-4S, MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM, REV.16 Performance Step: 1C20.7, step 5.1.1.I Critical N After three (3) minutes of prelube, then release CS-55313, D1 DSL GEN PRELUBE OIL PMP CS, AND notify the Control Room that prelube is complete.

Standard: Examinee waits for report that prelube is complete.

Evaluator Cue: Inform examinee that the 3-minute prelube is complete. Time compression may be used at examiners discretion. It is not intended to wait 3 minutes before informing examinee the prelube is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C20.7, step 5.1.1.J Critical N Notify Operators stationed locally that D1 is about to be started.

Standard: Examinee notifies local operators they are about to start D1.

Evaluator Cue: When examinee informs local operators of D1 start, THEN acknowledge the information.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C20.7, step 5.1.1.K Critical Y Start D1 using CS-46935, D1 DIESEL GENERATOR.

Standard: Examinee starts D1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 6 of 10 EG-4S, MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM, REV.16 Performance Step: 1C20.7, step 5.1.1.L Critical N Verify 41925, D1 EMERG GENERATOR TACHOMETER, indicates approximately 900 rpm.

Standard: Examinee verifies 41925 indicates 900 rpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C20.7, step 5.1.1.M Critical N Verify the two (2) amber indicating lights on 44901, D1 DIESEL GEN GOV READY LIGHTS, are LIT.

Standard: Examinee verifies amber indicating lights are LIT.

Evaluator Note: Per note in 1C20.7, examinee may deem it necessary to adjust the governor speed setting to light the amber lights.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C20.7, step 5.1.1.N Critical Y Place CS-46902, D1 DSL GEN EXCITER CONTROL SEL SW, in MANUAL.

Standard: Examinee places CS-46902 in manual.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the examinee has started D1 and placed voltage control in manual, then the JPM is complete.

Stop Time:

Historical Record:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 7 of 10 EG-4S, MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM, REV.16 Simulator Setup:

1. If an IC is already created for this JPM, then go to step 3.
2. If an IC is Not created for this scenario, then create one as follows:
a. Reset the Simulator to IC-10.
b. Place the simulator in RUN.
c. Verify the following:
1) D1 Diesel Generator is NOT running.
2) D1 DSL GEN EXCITER CONTROL SW in AUTO.
3) D1 OUTPUT BKR (15-2) AUTO/MAN SEL SW is in MANUAL.
d. Place simulator in FREEZE.
e. If desired, save to an available IC.
f. Place the simulator in RUN.
g. Go to Step 4.
3. Reset the simulator to the IC created form step 2 and place in RUN.
4. Place a D1 DSL GEN OOS magnetic sign on the G Panel (U1).
5. Mark steps 5.1.1.A through 5.1.1.E of 1C20.7, D1/D2 DIESEL GENERATORS, as complete.
6. Clear recorder memory after each reset.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 8 of 10 EG-4S, MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM, REV.16 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 9 of 10 EG-4S, MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM, REV.16 ATTACHMENT 2 JPM Number: EG-4S JPM

Title:

MANUAL START OF D1 DIESEL GENERATOR FROM THE CONTROL ROOM Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 10 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Steps 5.1.1.A through 5.1.1.E of 1C20.7, D1/D2 DIESEL GENERATORS, have been completed.

INITIATING CUES:

  • The Shift Supervisor directs you to manually start D1 Emergency Diesel Generator per steps 5.1.1.F through 5.1.1.N of 1C20.7, D1/D2 Diesel Generators.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12t14t2018)

O XcetEnergy" JOB PERFORMANCE MEASURE (JPM)

PRAIRIE ISLAND JPM TITLE: SECURE SFP NORMAL VENTILATION JPM NUMBER: sF-3S REV. o RELATED PRA NONE INFORIVIATION:

TASK NUMBERS / CRO 088 ATI OO OO OO3 SHUTDOWN SFP NORMAL VENT TASK TTTLE(S):

I(/A NUMBERS: 2.1.20 Rating SRO/RO: 4.6t4.6 APPLICABLE METHOD OF TESTING:

Discussion: f Simulate/walkthrough: f perform:

X EVALUATTON LOCATTON: tn-ptant:

I Control Room: f Simulator:

X other: f Lab.

il Time for Completion:

Minutes Time Critical: NO Alternate path. NO TASK APPLICABILITY: SRO: X Ro: X NLof Additional site-specific si natures m be added as desired.

Developed by:

Validated by:

Validator ee JPM Validation Checktist, Attachment 1)

Approved by:

Training Supervisor sA/^^-

Retention: Life of plant Form rerained in accordance;1i'ii'J.',i;.Ifr,fffiffffi:1rre identiried in Fp-c-RM-'1

Rev. 0 (12/14/2018) Page 2 of 8 SF-3S, SECURE SFP NORMAL VENTILATION, REV. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is at 100%.
  • You are the Unit 1 Lead Reactor Operator.
  • Duty Chemist has requested to collect SFP ventilation sample filters.

INITIATING CUES:

  • The Shift Supervisor directs you to shutdown Spent Fuel Pool Normal Ventilation per section 5.1.3 of C37.2, Spent Fuel Pool Normal and Special Vent Systems.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 3 of 8 SF-3S, SECURE SFP NORMAL VENTILATION, REV. 0 JPM PERFORMANCE INFORMATION Required Materials:

  • NONE General

References:

  • C37.2 Spent Fuel Pool Normal and Special Vent Systems Task Standards:
  • Examinee stops 121 SPENT FUEL POOL MAKE-UP AIR FAN and 121 SPENT FUEL POOL NORMAL EXHST FAN.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: C37.2, step 5.1.3.A.1:

Critical Y Shutdown Spent Fuel Pool Normal Ventilation as follows:

1. Momentarily place CS-46071, 121 SPENT FUEL POOL MAKE-UP AIR FAN, in the STOP position.

Standard: Examinee stops 121 SPENT FUEL POOL MAKE-UP AIR FAN.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 4 of 8 SF-3S, SECURE SFP NORMAL VENTILATION, REV. 0 Performance Step: C37.2, step 5.1.3.A.2:

Critical Y Shutdown Spent Fuel Pool Normal Ventilation as follows:

2. Momentarily place CS-46079, 121 SPENT FUEL POOL NORMAL EXHST FAN, in the STOP position.

Standard: Examinee stops 121 SPENT FUEL POOL NORMAL EXHST FAN.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C37.2, step 5.1.3.B:

Critical N Notify the Duty Chemist that the Spent Fuel Pool Normal Ventilation System has been shutdown so the sample filters can be collected. Also inform the Duty Chemist of the status of the Spent Fuel Special Ventilation System.

Standard: Examinee reports that Spent Fuel Normal and Special Ventilation Systems are not running.

Evaluator Cue: When the examinee reports to the Duty Chemist, the status of Spent Fuel Pool Ventilation Systems, then acknowledge the report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee stops 121 SFP Normal Ventilation Make-up and Exhaust Fans and reported to the duty Chemist, then this JPM is complete.

Stop Time:

Historical Record:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 5 of 8 SF-3S, SECURE SFP NORMAL VENTILATION, REV. 0 Simulator Setup:

1. If an IC is already created for this JPM, then go to step 3.
2. If an IC is NOT created for this JPM, then create one as follows:
a. Reset to IC-10.
b. Verify Spent Fuel Pool Normal Ventilation is running.
c. Place simulator in RUN.
3. Clear recorder memory after each reset.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 6 of 8 SF-3S, SECURE SFP NORMAL VENTILATION, REV. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 7 of 8 SF-3S, SECURE SFP NORMAL VENTILATION, REV. 0 ATTACHMENT 2 JPM Number: SF-3S JPM

Title:

SECURE SFP NORMAL VENTILATION Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 8 of 8 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is at 100%.
  • You are the Unit 1 Lead Reactor Operator.
  • Duty Chemist has requested to collect SFP ventilation sample filters.

INITIATING CUES:

  • The Shift Supervisor directs you to shutdown Spent Fuel Pool Normal Ventilation per section 5.1.3 of C37.2, Spent Fuel Pool Normal and Special Vent Systems.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12114t2018)

A Xcel3nergy- JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: NIS POWER RANGE DAILY CALIBRATION JPM NUMBER: NI.5S REV. 2 RELATED PRA INFORMATION: NONE TASK NUMBERS / CRO 015 OO7 02 01 OOO / PERFORM NORMAUALTERNATE NIS TASK TITLE(S): CALIBRATION OF THERMAL POWER K/A NUMBERS: 015 A1.01 Rating SRO/RO: 3.5/3.8 APPLICABLE METHOD OF TESTING:

Discussion: tr Simulate/walkthrough: tr Perform: X EVALUATION LOCATION: ln-Plant: tr Control Room: tr Simulator: X other: tr Lab: tr Time for Completion: 12 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X Ro: X NLo tr Additional si natures m be added as desired.

Developed by: Fredrick Collins -l?-bb ogXIUeo q lcDfrrd?

Validated by: * +t-Qill \6*(t'-lyttUr(t Justin Hasner (See JPM Validation Checklist, Aft5chment 1)

Approved by:  ?/z+h, Traininq Superuisor Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 2 of 8 NI-5S, NIS POWER RANGE DAILY CALIBRATION Rev. 2 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is at 50% power.
  • Rod Control is in MANUAL.
  • A load change is NOT in progress.
  • Load follow is NOT in progress.
  • ERCS is out of service.
  • SP 1005, NIS Power Range Daily Calibration, is complete up to step 8.6.3.
  • Average Reactor Thermal Power has been calculated per SP 1005B and is 50.2%.

INITIATING CUES:

  • The SS directs you to complete step 8.6 of SP 1005, NIS Power Range Daily Calibration.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 3 of 8 NI-5S, NIS POWER RANGE DAILY CALIBRATION Rev. 2 JPM PERFORMANCE INFORMATION Required Materials: Consumable copy of SP 1005 with section 6.0 complete, section 7.0 marked as N/A, and section 8.0 complete up to step 8.6.3.

General

References:

SP 1005, NIS POWER RANGE DAILY CALIBRATION Task Standards: Examinee determines N42 requires adjustment and adjusts the gain on N42 until N42 power is between 50.2% and 50.7%.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: SP 1005 Step 8.6.4 Critical Y Record INITIAL GAIN SETTING R303 for the NIS channel in Table 1, Part C.

Standard: Examinee records the initial gain setting for N42 (~5.04)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: SP 1005 Step 8.6.5, Attachment B Step 1 Critical Y Unlock potentiometer.

Standard: Examinee unlocks N42 GAIN potentiometer.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 4 of 8 NI-5S, NIS POWER RANGE DAILY CALIBRATION Rev. 2 Performance Step: SP 1005 Step 8.6.5, Attachment B Step 2 Critical Y Adjust the gain on the NIS POWER RANGE B drawer until NIS power is within the range of, equal to thermal power to 0.5% (2.0% for load change conditions) greater than thermal power.

Standard: Examinee adjusts the gain on N42 until N42 power is between 50.2% and 50.7%.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: SP 1005 Step 8.6.5, Attachment B Step 3 Critical N Lock the potentiometer in place.

Standard: Examinee locks the potentiometer in place.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: SP 1005 Step 8.6.6 Critical N Record the FINAL GAIN SETTING in Table 1, Part C Standard: Examinee records the final gain setting for N42.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee has determined N42 requires adjustment and has adjusted the gain on N42 until N42 power is between 50.2% and 50.7%, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 5 of 8 NI-5S, NIS POWER RANGE DAILY CALIBRATION Rev. 2 Simulator Setup:

1. If an IC is already created for this JPM, then go to step 3.
2. If an IC is NOT created for this JPM, then create one as follows:
a. Reset to IC-8.
b. Place the simulator in RUN.
c. Place rods in MANUAL.
d. Slowly adjust the following remotes one at a time (~ remote FINAL VALUE):
1) NI141 until N41 is reading 50.4% (53.5).
2) NI142 until N42 is reading 50.0% (should not require adjustment).
3) NI143 until N43 is reading 50.3% (53.4).
4) NI144 until N44 is reading 50.4% (53.5).
3. Reset the simulator to IC-255, or the IC created from step 2.
4. Provide a marked up copy of SP 1005 (see link below).
5. Ensure N41 pot is adjusted back to its normal position when JPM is complete.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 6 of 8 NI-5S, NIS POWER RANGE DAILY CALIBRATION Rev. 2 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 7 of 8 NI-5S, NIS POWER RANGE DAILY CALIBRATION Rev. 2 ATTACHMENT 2 JPM Number: NI-5S JPM

Title:

NIS POWER RANGE DAILY CALIBRATION, REV. 2 Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

Rev. 0 (12/14/2018) Page 8 of 8 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is at 50% power.
  • Rod Control is in MANUAL.
  • A load change is NOT in progress.
  • Load follow is NOT in progress.
  • ERCS is out of service.
  • SP 1005, NIS Power Range Daily Calibration, is complete up to step 8.6.3.
  • Average Reactor Thermal Power has been calculated per SP 1005B and is 50.2%.

INITIATING CUES:

  • The SS directs you to complete step 8.6 of SP 1005, NIS Power Range Daily Calibration.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.