ML22270A237

From kanterella
Jump to navigation Jump to search
Form 5.1-1 Post Exam Checklist
ML22270A237
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/26/2022
From: Jim Nance
NRC/RGN-III/DORS
To:
Xcel Energy
Nance J
Shared Package
ML21188A222 List:
References
Download: ML22270A237 (274)


Text

Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: Dates of Examination:

Date Activity Description Complete

1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 08/22/2022
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination N/A completed. (ES-4.4)
3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. N/A (ES-3.6)
4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 08/23/2022
5. Completed licensing official review. 08/25/2022
6. Mailed licenses, preliminary results, and pass letters. 08/25/2022
7. Notified facility licensee of results. 08/26/2022
8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports). 08/31/2022
9. Returned reference material after final resolution of any informal N/A NRC staff reviews, hearing demands, or both.
10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and 09/26/2022 Management Directive 3.53, NRC Records and Document Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

ES-5.1, Page 8 of 20