ES-D-1, Scenario Outline
ML20245E548
Person / Time
Site: Prairie Island  
Issue date: 08/27/2020
From:
NRC/RGN-III/DRS/OLB
To:
Callaway G
Shared Package
ML19127A303 List:
References
50-282/20-01, 50-306/20-01, ES-D-1 50-282/OL-20, 50-306/OL-20
Download: ML20245E548 (3)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.:

1 Op-Test No.: PI-ILT-NRC-2001S Examiners:

Gary Callaway Operators: Hansen, Benjamin (SS)

Joe DeMarshall Dave Lanyi Lindner, Dan (LRO)

Snider, Philip (RO)

Initial Conditions:

Reactor Power:

1x10-8 AMPS Equipment OOS:

NONE Boron Concentration:

1575 PPM RCS temperature:

549°F Other:

B/U PRZR heaters are ON RCS pressure:

2235 PSIG Two 40 GPM orifices are in service Xenon:

Free prior to S/U Rods:

CBD @ 142 STEPS Main Generator:

0 MW Turnover:

Secure the 11 TD AFW Pump Raise reactor power to the point of adding heat (POAH)

Event No.

Malf.

No.

Event Type*

Event Description 1

N (BOP)

SECURE 11 TD AUXILIARY FEEDWATER PUMP 2

R (ATC)

N (SRO)

RAISE POWER TO THE POAH 3

C (ATC) 12 CHARGING PUMP TRIP 4

C (BOP)

TS (SRO) 11 TD AFWP ACCUMULATOR LOW AIR PRESSURE 5

TS (SRO) 11 CTMT VACUUM BREAKER FAILS CLOSED 6

M (ALL)

FAULTED 12 SG TO CONTAINMENT 7

C (ATC, SRO) 12 MD AFW PUMP FAILS TO AUTO START 8

C (BOP, SRO)

SI TO FEEDWATER/CONDENSATE RELAY FAILURE (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.:

2 Op-Test No.: PI-ILT-NRC-2002S Examiners:

Gary Callaway Operators: Hansen, Benjamin (SS)

Joe DeMarshall Dave Lanyi Lindner (LRO)

(RO)

Initial Conditions:

Reactor Power:

100%

Equipment OOS:

11 TD AFW Pump Boron Concentration:

102 PPM RCS temperature:

560°F Other:

RCS pressure:

2235 PSIG Xenon:

Equilibrium Rods:

CBD @ 218 STEPS Main Generator:

582 MW Turnover:

Swap running EH Oil Pumps Event No.

Malf.

No.

Event Type*

Event Description 1

N (BOP)

SWAP RUNNING EH OIL PUMPS 2

I (ATC)

TS (SRO)

CONTROLLING PRZR PRESS CH FAILS LOW 3

TS (SRO)

D1 LOCAL ALARM 4

C (BOP)

TURBINE EH VALVE MALFUNCTION 5

R (ATC)

N (SRO)

RAPID DOWNPOWER TO 50%

6 M (ALL)

LOSS OF ALL AC 7

C (BOP)

TURBINE FAILS TO AUTO TRIP 8

C (BOP, SRO)

D2 FAILS TO AUTO START 9

C (ATC, SRO) 12 MD AFW PUMP FAILS TO AUTO START (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.:

3 Op-Test No.: PI-ILT-NRC-2003S Examiners:

Gary Calloway Operators: Shift Supervisor (SS)

Joe DeMarshall Balance of Plant (LRO)

Dave Lanyi At the Controls (RO)

Initial Conditions:

Reactor Power:

60%

Equipment OOS:

11 SI Pump Boron Concentration:

230 PPM RCS temperature:

554°F Other:

RCS pressure:

2235 PSIG Xenon:

Equilibrium Rods:

CBD @ 178 STEPS Main Generator:

338 MW Turnover:

Swap running RMU pumps Event No.

Malf.

No.

Event Type*

Event Description 1

N (BOP)

SWAP RMU PUMPS 2

I (ATC)

TS (SRO) 1ST STAGE PRESSURE INSTRUMENT FAILS LOW 3

R (ATC)

N (SRO)

RESTORE TAVG TO TREF 4

I (ATC, BOP)

TS (SRO)

PRZR LEVEL INTERLOCK CHANNEL FAILS LOW 5

M (ALL) 11 STEAM GENERATOR TUBE RUPTURE 6

C (BOP, SRO) 11 & 12 RHR PUMPS FAIL TO START AUTOMATICALLY 7

C (BOP, SRO)

SI TO COOLING WATER RELAY SIGNAL FAILURE (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor