|
---|
Category:License-Operator
MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5792020-08-27027 August 2020 ES-301-6 ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5662020-08-27027 August 2020 ES-401-6 ML20245E5762020-08-27027 August 2020 ES-301-4 ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5642020-08-27027 August 2020 ES-401-4 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination 2024-01-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5662020-08-27027 August 2020 ES-401-6 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5762020-08-27027 August 2020 ES-301-4 ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5642020-08-27027 August 2020 ES-401-4 ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5792020-08-27027 August 2020 ES-301-6 ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination IR 05000282/20183012018-11-30030 November 2018 Errata - Prairie Island Nuclear Generating Plant, Units 1 and 2 - NRC Initial License Examination Report 05000282/2018301 and 05000306/2018301 (DRS-R.Baker) ML22179A2542018-10-16016 October 2018 2018 Prairie Island Ile Outline Review Comments-Final ML22179A2392018-10-16016 October 2018 2018 Prairie Island Ile ES-201-1 Exam Prep Checklist 2024-01-19
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 1 Op-Test No.: PI-ILT-NRC-2001S Examiners: Gary Callaway Operators: Hansen, Benjamin (SS)
Joe DeMarshall Lindner, Dan (LRO)
Dave Lanyi Snider, Philip (RO)
Initial Conditions:
Reactor Power: 1x10-8 AMPS Equipment OOS: NONE Boron Concentration: 1575 PPM RCS temperature: 549°F Other: B/U PRZR heaters are ON RCS pressure: 2235 PSIG Two 40 GPM orifices are in service Xenon: Free prior to S/U Rods: CBD @ 142 STEPS Main Generator: 0 MW Turnover:
Secure the 11 TD AFW Pump Raise reactor power to the point of adding heat (POAH)
Event Malf. Event Type* Event No. No. Description 1 N (BOP) SECURE 11 TD AUXILIARY FEEDWATER PUMP R (ATC) 2 RAISE POWER TO THE POAH N (SRO) 3 C (ATC) 12 CHARGING PUMP TRIP C (BOP) 4 11 TD AFWP ACCUMULATOR LOW AIR PRESSURE TS (SRO) 5 TS (SRO) 11 CTMT VACUUM BREAKER FAILS CLOSED 6 M (ALL) FAULTED 12 SG TO CONTAINMENT 7 C (ATC, SRO) 12 MD AFW PUMP FAILS TO AUTO START 8 C (BOP, SRO) SI TO FEEDWATER/CONDENSATE RELAY FAILURE
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 2 Op-Test No.: PI-ILT-NRC-2002S Examiners: Gary Callaway Operators: Hansen, Benjamin (SS)
Joe DeMarshall Lindner (LRO)
Dave Lanyi (RO)
Initial Conditions:
Reactor Power: 100% Equipment OOS: 11 TD AFW Pump Boron Concentration: 102 PPM RCS temperature: 560°F Other:
RCS pressure: 2235 PSIG Xenon: Equilibrium Rods: CBD @ 218 STEPS Main Generator: 582 MW Turnover:
Swap running EH Oil Pumps Event Malf. Event Type* Event No. No. Description 1 N (BOP) SWAP RUNNING EH OIL PUMPS I (ATC) 2 CONTROLLING PRZR PRESS CH FAILS LOW TS (SRO) 3 TS (SRO) D1 LOCAL ALARM 4 C (BOP) TURBINE EH VALVE MALFUNCTION R (ATC) 5 RAPID DOWNPOWER TO 50%
N (SRO) 6 M (ALL) LOSS OF ALL AC 7 C (BOP) TURBINE FAILS TO AUTO TRIP 8 C (BOP, SRO) D2 FAILS TO AUTO START 9 C (ATC, SRO) 12 MD AFW PUMP FAILS TO AUTO START
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 3 Op-Test No.: PI-ILT-NRC-2003S Examiners: Gary Calloway Operators: Shift Supervisor (SS)
Joe DeMarshall Balance of Plant (LRO)
Dave Lanyi At the Controls (RO)
Initial Conditions:
Reactor Power: 60% Equipment OOS: 11 SI Pump Boron Concentration: 230 PPM RCS temperature: 554°F Other:
RCS pressure: 2235 PSIG Xenon: Equilibrium Rods: CBD @ 178 STEPS Main Generator: 338 MW Turnover:
Swap running RMU pumps Event Malf. Event Type* Event No. No. Description 1 N (BOP) SWAP RMU PUMPS I (ATC) 2 1ST STAGE PRESSURE INSTRUMENT FAILS LOW TS (SRO)
R (ATC) 3 RESTORE TAVG TO TREF N (SRO)
I (ATC, BOP) 4 PRZR LEVEL INTERLOCK CHANNEL FAILS LOW TS (SRO) 5 M (ALL) 11 STEAM GENERATOR TUBE RUPTURE 6 C (BOP, SRO) 11 & 12 RHR PUMPS FAIL TO START AUTOMATICALLY 7 C (BOP, SRO) SI TO COOLING WATER RELAY SIGNAL FAILURE
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor