|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19009A1712019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report, NRC Public Meeting January 15, 2019 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1009900312010-04-13013 April 2010 Entergy Nuclear Operations (Entergy): Meeting Presentation 2009 Nuclear Safety Culture Assessment Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0809403832008-03-26026 March 2008 Attendance List for Pilgrim Annual Assessment Meeting ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0614201642006-05-17017 May 2006 Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts ML0507500022005-03-16016 March 2005 NRC Slides - Pilgrim Annual Assessment Meeting ML0309001032003-03-26026 March 2003 Annual Assessment Meeting Slides ML0225302662002-09-0909 September 2002 Attachment 2 to Summary of 07/24/2002 Meeting with Entergy Nuclear Operations, Inc., Regarding Pilgrim Nuclear Power Station Proposed Safety-Relief Valve Seismic Analysis Methodology ML0210802402002-03-28028 March 2002 Annual Assessment Meeting Slides ML0212004532002-03-28028 March 2002 Entergy Nuclear Generation Company - Pilgrim Nuclear Power Station Annual Assessment Meeting Slides ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-04-11
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22088A2172022-03-16016 March 2022 Liquid Effluent Discharge Presentation ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17191A7872017-07-13013 July 2017 Regulatory Conference Presentation 07-13-17 ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12262A3282012-09-13013 September 2012 9/13/2012 Pilgrim Watch Final Presentation NUREG-0654 Public Mtg ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1118105122011-06-30030 June 2011 Aam Slides ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0807011352008-03-10010 March 2008 Slides for the Pilgrim Station Annual Assessment Meeting CY2007 - ROP8 - 03/26/2008 ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0710102652007-04-11011 April 2007 Slides for 2006 Annual Assessment Meeting, NRC Annual Performance Assessment of Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0704304762007-01-30030 January 2007 License Renewal Inspection Exit Meeting - Slides with Notes ML0703305622007-01-24024 January 2007 Dseis Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0634800262006-12-0606 December 2006 Drop-In Visit (Entergy) Slides ML0609404082006-04-0404 April 2006 NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0632802522005-07-18018 July 2005 Briefing Slides for 07/18/2005, Pilgrim Station Force-on-Force Inspection 2023-04-11
[Table view] |
Text
Pilgrim Nuclear Power Station License Renewal Safety Evaluation Report Staff Presentation to the ACRS Perry Buckberg Project Manager Office of Nuclear Reactor Regulation September 6, 2007.V: 9 Introduction e Overview" Section* License" Section 2: Scoping and Screen ing Review Renewal Inspections 3: Aging Management Review Results*Section 4: Time-Limited Aging (TLAAs)Analyses 2 It Overview* LRA Submitted by Letter, January° GE BWR3 -MARK 1 Containment 27, 2006 e 2028 MWth, 690 MWe* Op License DPR-35 Expires June 8, 2012* Located in Plymouth, MA 3 Overview" SER Issued June 28, 2007 o SSER to be Issued September, 2007" Open Items (4) Have Been Closed" Four (4) License Conditions" 92 RAIs Issued, 329 Audit Questions* =82% Consistent With GALL Report, Revision 1 4 I Review Highlights
° AMP GALL Audit-May 22, 2006" Scoping and Screening Methodology
-June 6 -June 9, 2006" AMR GALL Audit-June 19, 2006" AMP/AMR Status Briefing-July 17 -19, 2006 Audit 0 Regional Inspections
-September 18 -22, 2006-October 2 -6, 2006-December 6 -7, 2006 5 Section 2: Scoping and Screening Review Section 2.1 -Scoping and Screening Methodology
- On-site Audit -June 6 -June 9, 2006* Pilgrim included all system components in scope if any components were (a)2 -exceptions stated Section 2.3* 4 Additional Components Brought Into Scope Section 2.2, 2.4, 2.5* No Omissions 6 Section 2: Scoping and Screening Review Section 2.3-Mechanica I Systems* Open Item 2.3.3.6: Security Diesel-LRA Did not Include System Drawings-Referred to Regional Inspector to Determine System Components in Scope Staff Considered the 3/9/2007 Inspector Input Adequate to Close the Open Item 7 Section 2: Scoping and Screening Summary* The Applicant's Scoping Methodology Meets The Requirements Of 10 CFR Part 54.4* Scoping And Screening Results, As Amended, Included All SSCs Within The Scope Of License Renewal And Subject To AMR 8 License Renewal Inspections Glenn Meyer Region I v Scoping and Screening 0 54.4(a)(2)
-Non-safety SSCs Whose Failure Could Impact Safety SSCs" Spatial and Structural Interactions" LRA Drawings and Procedures Reviewed" Plant Walkdowns Performed 10 Scoping and Screening Conclusions" Spatial Interaction
-Acceptable" Structural Interaction
-Corrected" Scoping and Screening Acceptable for License Renewal 11 Aging Management e* ~ R~G&~0 I. 0 0 0* Reviewed* Reviewed 26 AMP Prog rams Programs, Evaluations, and Records" Program Procedures" Operational Experience Information
- Prior Pilgrim Issues Performed Plant Walk Downs* Interviewed Cognizant Personnel 12
- p~REG .Inspection A Conclusions
- Scoping and Aging Management Programs Support Conclusion That Aging Effects will be Managed* Drywell Shell Monitoring 13 ,Ib Current Performance" Licensee Response Column (Column I) of the NRC's Action Matrix -Green Pis and Findings" No Cross-cutting Issues" Reactor Oversight Process Baseline Inspections 14 Performance Indicators Radiation Safeguards Safety Occupational Public Physical Radiation Radiation Protection Safety Safety (NOT PUBLIC)Performance Indicators ISNor1/2l m. $tP E rniiengolyAC
- P4A' yse h'0F s*rVIP gjENjT.Sionw Sytem WaleT'IS7t
, Jactor, Coolantl Dr ý ill/Eecs syste Io-Micgali.R Dr4ll -15 40 Inspection Findings 2Q12007 1MG findings~'
$is qluarA ilqaf 2QQ00O7 e- r, tis quarterj [u l 4QW2006 iisqut&Most Significant Inspection Findings din ~ i$j findings E,~i q rer I i nN findings t hef tiqureris Afisce/Ianeous findings 16 Pilgrim Nuclear Power Station Aging Management Review Time Limited Aging Analysis Open Items Fire Protection Program -(B.1.13.1)
Open Item 3.0.3.2.10:
-Applicant did not Adequately Address how to Manage the Aging Effects of Inaccessible Seals.-Applicant Stated (ACRS) and Documented (June 2007) That There are Actually No Inaccessible Seals at PNPS 18 Co ntainment I nservice Inspection Program (B.1.16.1 e Orpen Item 3.0.3.3.2:
Regional Inspection Documented:
- Inoperative Bellows Rupture Drain Flow Switch e Drain Monitoring Inconclusive
& Undocumented e Water on Torus Room Floor 19 Containment Inservice Inspection Program (B.1.16.1 9 Ooen Item 3.0.3.3.2:
-Replace Switches Now and in 15 years-Identified Non-Aggressive Groundwater as Source of Water on Torus Room Floor e Tested November 2006 and June 2006-Provided Documentation of Drain Monitoring i Committed to Obtain Drywell UT Data 20 Containment Inservice REG Inspection Program (B.1.16.1)'.
Open Item 3.0.3.3.2:
-Torus Structure" Provided Evaluation of Effect on Torus Basemat* Commitments to Evaluate Groundwater/Torus Water i Commitment to Inspect Condition of Torus Hold Down Bolts and Grout 21 Section 4.2: Reactor Vessel Z"PA°Q Neutron Embrittlement 0'.Six TLAAs Affected by Neutron Fluence-Reactor Vessel Fluence-Pressure-Temperature Limits-Upper Shelf Energy-Adjusted Reference Temperature
-Circumferential Weld Inspection Relief-Axial Weld Failure Probability 22 Section 4.2: Reactor Vessel Neutron Embrittlement
- Open Item 4.2-Pilgrim -The First BWR-3 to Use RAMA Methodology to Calculate'Neutron Fluence-Dosimetry Data was not Available with Which to Benchmark the RAMA Calculated Results-Result -Fluence Calculation Not Acceptable Per Reg Guide 1.190 23 V Section 4.2: Reactor Vessel Neutron Embrittlement 0 Open Item 4.2-Applicant's Back Calculation of Limiting Fluence Values Considered Acceptable by the Staff-TLAA Identified Which Established the Limiting Fluence Value* Axial Welds @ RV Inner Surface -3.37 x 1018 n/cm2 (E > 1.0 MeV)24 REG Section 4.2: Reactor Vessel A0 Neutron Embrittlement Open Item 4.2 License Condition 4.2.6: On or before June 8, 2010, the applicant (Entergy) will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that will confirm that the neutron fluence for the lower intermediate shell axial welds, at the inner surface of the RV, will not reach the limiting value of 3.37 x 1018 n/cm2 (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).25 Section 4.2: Reactor Vessel Neutron Embrittlement
° Open Item 4.2-Commitment 47: Submit to the NRC An Action Plan for Benchmarking the Reactor Pressure Vessel Fluence Evaluation.
-Entergy Plan Submitted August 23, 2007.26 Section 4.3: Metal Fatigue Reactor Water Environment
-Removed Exception to Fatigue Monitoring Program regarding Environmentally Assisted Fatigue.-Combined FMP and EAF -FMP is Now Consistent with GALL.27'0'. .
Conclusions
- On the basis of its review of the LRA, with the closing of Open Items 2.3.3.6, 3.0.3.2.10, 3.0.3.3.2 and 4.2, the staff determines that the requirements of 10 CFR 54.29(a) have been met.28 Questions