ML091100285

From kanterella
Revision as of 03:16, 17 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Site - Revision 27 to Core Operating Limits Report (Colr)
ML091100285
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/13/2009
From: Baxter D
Duke Energy Carolinas, Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML091100285 (36)


Text

Duke EnergyDAVE BAXTER Vice President Oconee Nuclear Station Duke Energy ON0I VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy.com April 13, 2009 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Site Docket No. 50-287 Core Operating Limits Report (COLR)Gentlemen:

Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 24, Rev. 27.If you have any questions, please direct them to Judy Smith at 864-873-4309.

Sincerely, Dave axter Site Vice President Oconee Nuclear Station Attachment 4Ado (www. duke-energy.

com NRC Document Control Desk April 13, 2009 Page 2 xc w/att: Mr. Luis Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Ga. 30303-8931 Mr. John Stang Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 8 G9A Washington, DC 20555 Mr. Andy Hutto Senior Resident Inspector Oconee Nuclear Site NRC Document Control Desk April 13, 2009 Page 3 bxc wo/att: NSRB -EC05P bxc w/att: ELL ONS Document Management ONEI-0400-70 Rev 27 Page 1 of 33 Duke Energy Oconee 3 Cycle 24 Core Operating Limits Report QA Condition 1 0 L 7 Prepared By: D.S. Orr Date: Checked By: W.D. Broome Date: 3 03 Date: CDR By: A.W. Strange ,444 Approved By: R.R. St.Clair Dat &.::,. e_Date : 3-3c) -Oq Document No. / Rev. ONEI-0400-70 Rev. 27 Date March 16, 2009 Page No. Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Date: 3/3c) f)Inspection Waived By: (Sponsor)

-I CATAWBA Inspection Waived MCE (Mechanical

& Civil) R Inspected By/Date: RES (Electrical Only) [] Inspected By/Date: RES (Reactor) 0I Inspected By/Date: MOD El Inspected By/Date: Other ( 0) [ Inspected By/Date: OCONEE Inspection Waived MCE (Mechanical

& Civil) Inspected By/Date: RES (Electrical Only) [] Inspected By/Date: RES (Reactor)

[I] Inspected By/Date: MOD Mx Inspected By/Date: Other ( M) Inspected By/Date: MCGUIRE Inspection Waived MCE (Mechanical

& Civil) Inspected By/Date: RES (Electrical Only) LI Inspected By/Date: RES (Reactor)

Inspected By/Date: MOD Inspected By/Date: Other ( ) LI Inspected By/Date: 0 ONEI-0400-70 Rev 27 Page 3 of 33 Oconee 3 Cycle 24 Core Operating Limits Report Insertion Sheet for Revision 27 Remove these Revision 26 pages Insert these Revision 27 pages 1 -33 1 -33 Revision Log Effective Date Pages Revised Pages Pages Total Effective Added Deleted Pages Revision Oconee 3 Cycle 24 revisions below 27 Mar2009 1 -33 26 Nov 2007 1-33 --33 25 Nov 2007 1-33 --33 1Oconee 3 Cycle 23 revisions below I 24 May 2006 1 -33 Oconee 3 Cycle 22 revisions below 23 Mar2006 1 -4,6,15-16,21,27,31

--33 22 Mar2005 1-5 --33 21 Nov 2004 1 -33 ONEI-0400-70 Rev 27 Page 4 of 33 Oconee 3 Cycle 24 1.0 Error Adjusted Core Operating Limits The Core Operating Limits Report for 03C24 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in references 1 through 11. The RPS protective limits and maximum allowable setpoints are documented in references 12 through 14. These limits are validated for use in 03C24 by references 15 through 17. The 03C24 analyses assume a design flow of 107.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, an axial peaking factor (Fz) of 1.5, and an EOC (<100 ppmB) Tavg reduction of up to 10' F provided 4 RCPs are in operation and Tavg does not decrease below 569" F.The error adjusted core operating limits included in section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C24 reload core.1.1 References

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1004-A, Revision 0, SER dated November 23, 1992.2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1002-A, Revision 2, SER dated October 1, 1985.3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 5, SER dated December 8, 2000.4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA, Revision 1, SER dated June 23, 2000.5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 3, SER dated September 1, 2002.6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008-PA, Revision 0, SER dated April 3, 1995.7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 2, SER dated September 24, 2003.8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, Rev. 3, SER dated September 24, 2003.9. BAW-10192-PA, BWNT LOCA -BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, Rev. 0, SER dated February 18, 1997.10. BAW-10164P-A, Rev. 4, RELAP5/MOD2-B&W

-An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis, SER dated April 9, 2002.11. BAW-10227-PA, Evaluation of Advanced.Cladding and Structural Material (M5) in PWR Reactor Fuel, Rev. 1, June 2003 (SER to BAW-10186P-A dated June 18, 2003).12. RPS RCS Pressure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.14. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.15. 03C24 Maneuvering Analysis, OSC-9099, Revision 3, March 2009.16. 03C24 Specific DNB Analysis, OSC-9171, Revision 1, November 2007.17. 03C24 Reload Safety Evaluation, OSC-9222, Revision 2, March 2009.

ONEI-0400-70 Rev 27 Page 5 of 33 Oconee 3 Cycle 24 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.Referred to by TS 3.5.4.Spent fuel pool boron concentration shall be greater than 2220 ppm.Referred to by TS 3.7.12.The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.Referred to by TS SLC 16.5.13.CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm. Referred to by TS 3.5.1.RCS and Refueling canal boron concentration shall be greater than 2220 ppm.Referred to by TS 3.9.1.Shutdown Margin (SDM) shall be greater than 1% Ak/k.Referred to by TS 3.1.1.Moderator Temperature Coefficient (MTC) shall be less than: Linear interpolation is valid within the table provided.Referred to by TS 3.1.3.MTC x 10-4 Ap/0 F+0.70+0.525 0.00 0.00 0.00% FP 0 20 80 100 120 Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1. 4 RCP: measured hot leg pressure > 2125 psig 3 RCP: measured hot leg pressure > 2125 psig DNB parameter for RCS loop average temperature shall be: Referred to by TS 3.4.1.The measured Tavg must be less than COLR limits minus instrument uncertainty.

ATc is the setpoint value selected by the operators.

Values are expanded by linear interpolation on page 33 of this document without instrument uncertainty.

Max Loop Tavg (Incl 2'F unc)ATc, 'F 4 RCP Op 3 RCP Op 0 581.0 581.0 1 581.4 581.2 2 581.8 581.4 3 582.1 581.7 4 582.5 581.9 5 582.9 582.1* This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.DNB parameter for RCS loop total flow shall be: Referred to by TS 3.4.1.4 RCP: Measured > 107.5 %df 3 RCP: Measured > 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.Referred to by TS 3.2.1.Regulating rod group overlap shall be 25% + 5% between two sequential groups.Referred to by TS 3.2.1.Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).

ONEI-0400-70 Rev 27 Page 6 of 33 Oconee 3 Cycle 24 EFPD 0 to 446 446 to EOC Core Power Level, %FP Full Incore Out of Core Backup Incore Steady State Operating Band Rod Index APSR Min Max Min 292+/- 5 300 30 292 +/- 5 300 100%WD Max 40 100 Quadrant Power Tilt Setpoints Steady State Transient 30-100 0-30 30-100 0-30 3.50 7.61 7.11 9.40 2.35 6.09 5.63 7.72 2.25 3.87 3.63 4.81 Referred to by TS 3.2.3 Maximum 0- 100 16.55 14.22 10.07 Correlation Slope (CS)1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).

ONEI-0400-70 Rev 27 Page 7 of 33 Oconee 3 Cycle 24 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 P = 2355 psig T=618 F 2300 2200 (_0)c 2100 Acceptable U) Operation 0oP = 11.14 *Tout -470 0 0? 2000 U Unacceptable 1900 Operation P =1800 psig 1800 T=584 F 1700 I I 540 560 580 600 620 640 Reactor Coolant Outlet Temperature, OF ONEI-0400-70 Rev 27 Page 8 of 33 Oconee 3 Cycle 24 RPS Power Imbalance Setpoints 4 Pumps% FP 0.0 87.5 107.9 107.9 90.4 0.0% Imbalance-33.0-33.0-11.4 14.4 33.0 33.0-33.0-33.0-11.4 14.4 33.0 33.0 3 Pumps 0.0 60.2 80.6 80.6 63.1 0.0 Maximum Allowable RPS Power Imbalance Limits 4 Pumps% FP 0.0 87.1 109.4 109.4 90.0 0.0% Imbalance-35.0-35.0-11.4 14.4 35.0 35.0-35.0-35.0-11.4 14.4 35.0 35.0 3 Pumps 0.0 59.4 81.7 81.7 62.3 0.0 ONEI-0400-70 Rev 27 Page 9 of 33 0 Oconee 3 Cycle 24 Operational Power Imbalance Setpoints Full Backup Out of%FP Incore Incore Core 4 Pumps 0.0 -28.0 -28.0 -28.0 80.0 -28.0 -28.0 -28.0 90.0 -25.4 -25.4 -25.4 100.0 -14.7 -14.7 -14.7 102.0 -12.6 -12.6 -12.6 102.0 15.7 15.7 15.7 100.0 17.8 17.8 17.8 90.0 28.0 28.0 28.0 80.0 28.0 28.0 28.0 0.0 28.0 28.0 28.0 3 Pumps 0.0 -28.0 -28.0 -28.0 60.2 -28.0 --28.0 60.2 --28.0 -77.0 -10.2 -10.2 -10.2 77.0 13.2 13.2 13.2 63.1 -28.0 -63.1 28.0 -28.0 0.0 28.0 28.0 28.0 ONEI-0400-70 Rev 27 Page 10 of 33 Oconee 3 Cycle 24 Operational Power Imbalance Setpoints Operation with 4 RCS Pumps, BOC to EOC% FP I RPS Trip [ Full Incore Alarm I Out of Core Alarm 107.9 107.0 106.0 105.0 104.0 103.0 102.0 101.0 100.0 99.0 98.0 97.0 96.0 95.0 94.0 93.0 92.0 91.0 90.4 90.0 89.0 88.0 87.5 87.0 86.0 85.0 84.0 83.0 82.0 81.0 80.0 0.0-11.4-12.3-13.4-14.4-15.5-16.6-17.6-18.7-19.7-20.8-21.9-22.9-24.0-25.1-26.1-27.2-28.2-29.3-30.0-30.4-31.4-32.5-33.0-33.0-33.0-33.0-33.0-33.0-33.0-33.0-33.0-33.0 14.4 15.4 16.4 17.5 18.5 19.6 20.7 21.7 22.8 23.9 24.9 26.0 27.0 28.1 29.2 30.2 31.3 32.3 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0-12.6-13.7-14.7-15.8-16.9-17.9-19.0-20.1-21.1-22.2-23.2-24.3-25.0-25.4-25.6-25.9-26.0-26.2-26.4-26.7-26.9-27.2-27.5-27.7-28.0-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0-12.6-13.7-14.7-15.8-16.9-17.9-19.0-20.1-21.1-22.2-23.2-24.3-25.0-25.4-25.6-25.9-26.0-26.2-26.4-26.7-26.9-27.2-27.5-27.7-28.0-28.0 15.7 16.7 17.8 18.8 19.8 20.9 21.9 22.9 23.9 24.9 26.0 27.0 27.6 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0% FP RPS Trip Full Incore Alarm j Out of Core Alarm ONEI-0400-70 Rev 27 Page 11 of 33 Oconee 3 Cycle 24 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC% FP RPS Trip Full Incore Alarm Out of Core Alarm 80.6 80.0 79.0 78.0 77.0 76.0 75.0 74.0 73.0 72.0 71.0 70.0 69.0 68.0 67.0 66.0 65.0 64.0 63.1 63.0 62.0 61.0 60.2 60.0 0.0-11.4-12.0-13.0-14.1-15.2-16.2-17.3-18.3-19.4-20.5-21.5-22.6-23.7-24.7-25.8-26.8-27.9-29.0-30.0-30.0-31.1-32.2-33.0-33.0-33.0 14.4 15.0 16.1 17.1 18.2 19.3 20.3 21.4 22.4 23.5 24.6 25.6 26.7 27.8 28.8 29.9 30.9 32.0 33M0 33.0 33.0 33.0 33.0 33.0 33.0-10.2-11.2-12.3-13.3-14.4-15.5-16.5-17.6-18.7-19.7-20.8-21.8-22.9-24.0-25.0-25.0-26.1-27.2-28.0-28.0-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0-10.2-11.2-12.3-13.3-14.4-15.5-16.5-17.6-18.7-19.7-20.8-21.8-22.9-24.0-25.0-25.0-26.1-27.2-28.0-28.0-28.0 13.2 14.3 15.3 16.4 17.4 18.5 19.6 20.6 21.7 22.8 23.8 24.9 25.9 27.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0% FP RPS Trip Full Incore Alarm Out of Core Alarm ONEI-0400-70 Rev 27 Oconee 3 Cycle 24 Page 12 of 33 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120.0 (-11.4,107.9)

(14.4,107.9) 100.0 M1 = 0.942 M2 = -0.942 Acceptable 4 Pump Operation (-33.0,87.5)

(33.0,90.4)

(-11.4,80.6)

(14.4,80.6)

I ~ ~U.(-33.0,60.2) 60.0 (33.0,63.1)

Acceptable 3 or 4 Pump Operation:

40.0 20.0 I l 0.0 I 'II ,-40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 Percent Power Imbalance Oconee 3 Cycle 24 Imbalance Setpoints for 4 Pump Operation, BOC to EOC aONE -70 Rev 27*age 13 of 33 110.0 100.0 90.0 80.0 70.0 0 0. 60.0 U-0 E 50.0 ci,, 40.0 30.0 20.0 10.0-35PS Trip --n 2-35 25 -20 I-ncore & Outcore Alarrr IRPS Trip SetpoinýI 0.0-40-15-10-5 0 5 10 Percent Axial Imbalance 15 20 25 30 35 40 0 0 Oconee 3 Cycle 24 Imbalance Setpoints for 3 Pump Operation, BOC to EOC ONEI-0 0 0 Rev 27 Page 14 of 33 -w 0 0~n U-0 C 0)0 a, 0~110 100 90 80 70 60 50 40 30 20 10 0-40 30 20 10 -5 0 5 Percent Axial Imbalance 10 15 20 25 30 35 40 ONEI-0400-70 Rev 27 Page 15 of 33 0 Oconee 3 Cycle 24 4 Pumps 3 Pumps Operational Rod Index Setpoints RI Insertion Setpoint%FP No nop Rod 1 Inop Rod 102.0 263.5 283.4 100.0 261.5 281.5 90.0 251.5 271.9 80.0 251.5 262.3 50.0 201.5 233.4 48.0 195.2 231.5 15.0 91.5 165.5 13.0 76.5 161.5 5.0 16.5 93.5 3.0 1.5 76.5 2.8 0.0 74.8 0.0 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 77.0 75.0 50.0 48.0 15.0 13.0 5.0 3.0 2.8 0.0 246.5 243.2 201.5 195.2 91.5 76.5 16.5 1.5 0.0 0.0 285.2 281.5 235.2 231.5 165.5 161.5 93.5 76.5 74.8 51.0 ONEI-0400-70 Rev 27 Page 16 of 33 Oconee 3 Cycle 24 Shutdown Margin Rod Index Setpoints 4 Pumps 3 Pumps%FP 102.0 100.0 48.0 13.0 3.0 2.8 0.0 77.0 75.0 48.0 13.0 3.0 2.8 0.0 RI Insertion Setpoint No Inop Rod 1 Inop Rod 224.6 283.4 221.5 281.5 141.5 231.5 76.5 161.5 1.5 76.5 0.0 74.8 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 227.4 221.5 141.5 76.5 1.5 0.0 0.0 285.2 281.5 231.5 161.5 76.5 74.8 51.0 Oconee 3 Cycle 24 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 27 Page 17 of 33 Shutdown Margin Setpoint , Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7.102 101 100 99 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69.8 69 68 67 66 65 64.1 63 62 61 60 59 100 100 99.8 24.8 99.0 24.0 100 100 100 100 63.5 62.5 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 98.2 97.5 96.7 95.9 95.2 94.4 93.6 92.9 92.1 91.3 90.6 89.8 89.0 88.2 87.5 86.7 85.9 85.2 84.4 83:6 82.9 82.1 81.3 80.6 79.8 79.0 78.2 77.5 76.7 75.9 75.2 75.0 73.8 72.3 70.7 69.2 67.7 66.3 64.6 63.0 61.5 60:0 58.4 23.2 22.5 21.7 20.9 20.2 19.4 18.6 17.9 17.1 16.3 15.6 14.8 14.0 13.2 12.5 100 100 100 100----100 100 100 100 100 100 100 100 100 100 100~~~100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 11.7 10.9 100 1-ý00-100 100 10.2 100 100 9.4 8.6 100 100 7.9 7.1 6.3 5.6 4.8 4.0 3.2 2.5 1.7 0.9 0.2 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 61.5 60.5 59.5 58.5 57.5 56.5 55.5 54.5 53.5 52.5 51.5 51.5 51.5 51.5 51.5 51.5 51.5 51.5 51.5 51.5 51.5 49.8 48.2 46.5 44.8 43.2 41.5 39.8 38.2 36.5 34.8 34.5 33.2 31.5 29.8 28.2 26.5 25.0 24.1 23.2 22.4 21.6 20.8 19.9 19.1 18.2 17.4 16.6 15.8 14.9 14.1 13.2 58 57 56 55 54 53 52 51 50 100 100 100 100 100 100 100 100 100-- -56.9 55.3 53.8 52.3 50.7 49.2 47.7 46.1 44.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100--100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99.1 98.2 97.4 96.6 95.8 94.9 94.1 93.2 92.4 91.6 90.8 100 100 100 89.9 89.1 88.2%FP CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint 11 Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.Continued on next page.

Oconee 3 Cycle 24 Rod Index Setpoints 4 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 27 Page 18 of 33 Shutdown Margin S%FP CRGP 5 CRGP 6 49 100 43.0 48 100 41.5 47 100 39.6 46 100 37.8 45 100 35.9 44 100 34.1 43 100 32.2 42 100 30.4 41.6 100 29.6 41 100 28.5 40 100 26.6 39.1 100 25.0 39 99.9 24.9 38 99.0 24.0 37 98.0 23.0 36 97.1 22.1 35 96.2 21.2 34 95.2 20.2 33 94.3 19.3 32 93.4 18.4 31 92.5 17.5 30 91.5 16.5 29 90.6 15.6 28 89.7 14.7 27 88.8 13.8 26 87.8 12.8 25.7 87.5 12.5 Operational Alarm Setpoint CRGP 5 CRGP 6 CRGP 7 100 86.7 11.7 100 85.1 10.1 100 83.5 8.5 100 82.0 7.0 100 80.4 5.4 100 78.8 3.8 100 77.2 2.2 100 75.7 0.7 100 75.0 100 100 73.2 70.1 100 100 100 100 100 100 100 67.3 66.9 63.8 60.6 57.5 54.3 51.2 0 0 0 0 0 0 100 100 100 100 100 100 100 100 48.1 44.9 41.8 38.6 35.5 32.4 29.2 26.1 25.0 24.0 22.4 20.8 19.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 24 23 22 21 20 19 18 17 16 15 14 13 1.2.8 12 11 10 9 8 7 6 5 4 3 2.8 2 0 86.9 86.0 85.0 84.1 83.2 82.2 81.3 80.4 79.5 78.5 77.6 76.7 75.8 75.0 69.0 61.5 54.0 46.5 39.0 31.5 24.0 16.5 9.0 1.5 0 0 0 0 11.9 11.0 10.0 9.1 8.2 7.2 6.3 5.4 4.5 3.5 2.6 1.7 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0-0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 99.0 97.4 95.8 94.2 92.7 91.1 89.5 88.0 86.4 84.8 83.2 79.5 75.8 75.0 69.0 61.5 54.0 46.5 39.0 31.5 24.0 16.5 9.0 1.5 0 0 0 0 17.7 16.1 14.5 13.0 11.4 9.8 8.2 4.5 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Shutdown Margin Setp int Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 24 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 27 Page 19 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint%FP CRGP5 I CRGP6 CRGP77 CRGP I5 CRGP6 CRGP7 77 76.2 76 75 74 73 72 71 70 69 68 67 66 65 64.1 63 62 61 60 59.3 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 100 100 100 100 100 100 100 100 100 100 100 100 100 99.7 98.2 96.8 95.3 93.8 92.3 90.8 89.4 87.9 27.4 25.0 24.7 23.2 21.8 20.3 18.8 17.3 15.8 14.4 12.9 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 86.4 84.9 83.4 82.1 80.5 79.0 77.5 76.0 75.0 74.1 71.1 68.2 65.2 62.2 59.3 56.3 53.4 50.4 47.4 44.5 41.5 39.6 37.8 35.9 34.1 32.2 11.4 9.9 8.4 7.1 5.5 4.0 2.5 1.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100=1:0:0F 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99.1 98.3 97.4 96.6 96.0 95.8 94.9 94.1 93.3 92.4 91.6 90.8 89.9 89.1 88.2 86.7 85.1 83.5 82.0 80.4 78.8 77.2 75.7 75.0 73.2 70.1 46.5 45.2 44.9 43.2 41.5 39.9 38.2 36.5 34.9 33.2 31.5 29.9 28.2 26.5 25.0 24.1 23.3 22.4, 21.6 21.0 20.8 19.9 19.1 18.3 17.4 16.6 15.8 14,9 14.1 13.2 11.7 10.1 8.5 7.0 5.4 3.8 2.2 0.7 0.0 0 0 1~ -I- --II-42 41.6 41 100 100 100 30.4 0 f-29.6 28.5 0 100 0 100 40 100 26.6 0 100 39.1 39 38 37 36 35ý-34 33 32 31 30 29 28 100 99.9 99.0 98.0 97.1 96.2 95.2 94.3 93.4 92.5 91.5 90.6 89.7 25,0 0 100 67.3 24.9 24.0 23.0 22.1 21.2 20.2 19.3 18.4 17.5 16.5 15.6 14.7 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 66.9 63.8 60.6 57.5 54.3 51.2 48.1 44.9 41.8 38.6 35.5 32.4 0 0 0 0 0 0 0 0 0 0 0 ii I~ II 4'Shutdown Margin Setpoint Operational Alarm Setpoint IL RI = 300 is withdrawal limit at all power levels.Continued on next page.

Oconee 3 Cycle 24 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 27 Page 20 of 33 Shutdown Margin Setpoint 11 Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 27 26 25.7 25 24 23 22 21 20 19 18 17 16 15 14 13 12.8 88.8 87.8 87.5 86.9 86.0 85.0 84.1 83.2 82.2 81.3 80.4 79.5 78.5 77.6 76.7 75.8 75.0 13.8 12.8 12.5 11.9 11.0 10.0 9.1 8.2 7.2 6.3 5.4 4.5 3.5 2.6 1.7 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 99.0 97.4 95.8 94.2 92.7 91.1 89.5 88.0 86.4 84.8 83.2 79.5 75.8 75.0 29.2 26.1 25.0 24.0 22.4 20.8 19.2 17.7 16.1 14.5 13.0 11.4 9.8 8.2 4.5 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 11 10 9 8 7 6 5 4-3 --2.8 2 1 0 69.0 61.5 54.0 46.5 39.0 31.5 24.0 16.5 9.0 1.5 0 0 0 0 0 0 0 69.0 0 0 1 0 0 0 61.5 54.0 46.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 39.0 31.5 24.0 16.5 9.0 1.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 24 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 27 Page 21 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP7 CRGP 51 CRGP 6 CRGP 7 102 101 100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 83.4 82.5 100 100 100 100 100 100 100 100 100 81.5 80.5 79.6 78.6 77.7 76.7 75.7 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 74.8 73.8 72.8 71.9 70.9 70.0.69.0 68.0 85 84 83 82 81 80 79 78 77 76 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 67.1 66.1 65.2 64.2 63.2 62.3 61.3 60.3 59.4 58.4 57.5 56.5 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 75 100 100 100 100 100 100 100 100 100 IO00 100 100 100 IO00 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 O00 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 10 100 O00 100 100 83.4 82.5 81.5 80.5 79.6 78.6 77.7 76.7 75.7 74.8 73.8 72.9 71.9 70.9 70.0 69.0 68.1 67.1 66.1 65.2 64.2 63.3 62.3 61.3 60.4 59.4 58.4 57.5 56.5 55.6 54.6 53.6 52.7 51.7 50.7 49.8 48.8 47.8 46.9 45.9 45.0 44.0 43.0 42.1 41.1 40.2 39.2 38.2 37.3 36.3 35.3 34.4 33.4 32.5 74 100 100 73 72 71 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 55.5 54.6 53.6 52.7 51.7 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 50.7 100*49.8 48.8 47.8 46.9 45.9 45.0 44.0 43.0 42.1 41.1 40.2 39.2 38.2 37.3 36.3 35.3 34.4 33.4 32.5 31.5 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 31.5-- -]I Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.Continued on next page.

Oconee 3 Cycle 24 Rod Index Setpoints 4 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 27 Page 22 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 1 CRGP 6 CRGP 7 47 46 45 44.8 44 43 42 41 40 39 38 37 36 35 34 33-32 31 30 29 28 27 26 25 24 23 22 21 20 19.8 19 18 17 16 15 14 13 12 11 10--9 8.7 8 7 6 5 4 3 2.8 2 1 0 100 100 100 100 100 100 100 100 100 100~~*100 100 100 100__100 100 100 100 100 100 100 100 100 100 100 100 100 100-ioo 100 100 100 100 100 100 100 100-100 100 100 100'100 97.0 92.8 10.0 75,8 75.0 68.0 59.5 51.00 100 100 100 100 99.2 98.2 97.2 29.5 27.5 25.5 25.0 24.2 23.2 22.2 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99.2 98.2 97.2 96.2 95.2 94.2 93.2 92.2 91.2 90.2 96.2 95.2 94.2 93.2 92.2 91.2 90.2 89.2 88.2 87.2 86.2 85.2 84.2 83.2 82.2 21.2 20.2 19.2 18.2 17.2 16.2 15.2 14.2 13.2 12.2 11.2 10.2 9.2 100 100 100 100 100 100 100 100 89.2 88.2 87.2 86.2 85.2 84.2 83.2 82.2 8.2 7.2 81.2 80.2 79.2 78.2 77.2 76.2 75.2 75.0 73.5 71.5 69.5 67.5 65.5 63.5 61.5 53.0 44.5 36.0 27.5 25.0 22.0 17.8 13.5 9.2 5.0 0.8 0 0 0 0 _____6.2 5.2 4.2 3.2 2.2 1.2 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 97.0 92.8 88.5 84.2 80.0 75.8 75.0 68.0 59.5 51.0 81.2 80.2 79.2 78.2 77.2 76.2 75.2 75.0 73.5 71.5 69.5 67.5 65.5 63.5 61.5 53.0 44.5 36.0 27.5 25.0 22.0 17.8 13.5 9.2 5.0 0.8 0 0 0 0 29.5 27.5 25.5 25.0 24.2 23.2 22.2 21.2 20.2 19.2 18.2 17.2 16.2 15.2 14.2 13.2 12.2 11.2 10.2 9.2 8.2 7.2 6.2 5.2 4.2 3.2 2.2 1.2 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0" 0 0 0 0% FP CRGP 5 1 CRGP 6 CRGP 7 CRGP 5 CRGP6 J CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 24 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 27 Page 23 of 33 Shutdown Margin Setpoint 11 Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 77 76 75 74 73 72 71 70 69 68--67-66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 100 100 100 100 100 100 100 100 100 100 100 100--100 iyod 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 85.2 83.4 81.5 100 100 100 100 100 100 85.2 83.4 81.5 100 100 100 100 100 100 100 100 100--100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 I i 79.6 77.8 75.9 74.1 72.2 70.4 68.5 66.7 64.8 63.0 61.1 59.3 57.4 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 55.6 53.7 51.9 100 100 100 50.0 48.2 46.3 44.5 42.6 40.8 38.9 37.1 35.2 33.4 31.5 29.5 27.5 25.5 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100-o-100 100 100 100 100 100 100 100 100 100 100 100 100 99.2 79.6 77.8 75.9 74.1 72.2 70.4 68.5 66.7 64.8 63.0 61.1 59.3 57.4 55.6 53.7 51.9 50.0 48.2 46.3 44.5 42.6 40.8 38.9 37.1 35.2 33.4 31.5 29.5 27.5 25.5 25.0 24.2 23.2 22.2 21.2 20.2 19.2 18.2 17.2 16.2 15.2 14.2 13.2 12.2 11.2 10.2 9.2 8.2 7.2 6.2 5.2 4.2-f ff 44.8 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99.2 98.2 97.2 25.0 24.2 23.2 22.2 100 100 100 100 98.2 97.2 96.2 95.2 94.2 93.2 92.2 91.2 90.2 89.2 88.2 87.2 86.2 85.2 21.2 20.2 19.2 18.2 17.2 16.2 15.2 14.2 13.2 12.2 11.2 10.2 100 100 100 100 100 100 100 100 100 100 100 100 96.2 95.2 94.2 93.2 92.2 91.2 90.2 89.2 88.2 87.2 86.2 85.2 100 100 100 100 100 100 84.2 9.2 100 83.2 82.2 81.2 80.2 79.2 8.2 7.2 6.2 5.2 4.2 100 100 100 100 100 84.2 83.2 82.2 81.2 80.2 79.2 II + 4 Shutdown Marain Setooint Ooerational Alarm Setnoint -Shutdown Magi ...... n O .... rato a Alarm.. ..... .S t .....RI = 300 is withdrawal limit at all power levels..Continued on next page.

Oconee 3 Cycle 24 Rod Index Setpoints 3 Pump Operation, 1 Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 27 Page 24 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint% FP CRGP 5 1 CRGP6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 22 21 20 19.8 19 18 17 16 15 14 13 12 11 10 9 8.7 8 7 6 5 4 3 2.8 2 1 0 100 100 100 100.100 100 100 100 100 100 100 100 100 100 100 100-100 97.0 92.8 88.5 84.2 80.0 75.8 75.0 68.0 59.5 51.0 78.2 77.2 76.2 75.2 75.0 73.5 71.5 69.5 67.5 65.5 63.5 61.5 53.0 44.5 36.0 27.5 25.0 22.0 17.8 13.5 9.2 5.0 0.8 0 0 0 0 3.2 2.2 1.2 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 97.0 92.8 88.5 84.2 80.0 75.8 75.0 68:0 59.5 51.0 78.2 77.2 76.2 75.2 75.0 73.5 71,5 69.5 67.5 65.5 63.5 61.5 53.0 44.5 36.0 27.5 25.0 22.0 17.8 13.5 U 9.2 5.0 0.8 0 0 0 0 3.2 2.2 1.2 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C24->The f(ir in the applii our "contingency" 2.0 wt% Mk-B1 1 feed:ation of the above limits to the contingei CY K -% FP CRGP 5 CRGP 6 [ CRGP 7 CRGPS 5 CRGP6 CRGPP7 Shutdown Margin Setpoint T Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 24 ONEI-0* Rev 27 Page 25 of 33 0-U-0 10 a)105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 I Control Rod Position Setpoints No InoDerable Rods. 4 PumD Floi itililil iff10 5 M100l Restricted 95 Operation I fil II lt1 H111 HIM. it- 90 85.... .a l 80 Acceptable

-5 3A 0 I -20 fi l I N1 11 il 15 10 75 l 85 95 tfll Ifl 0 il 10 20 30I 40 50 607i8l0l0 Hill I I I GrIoup7 Control Rod Position, % WD Oconee 3 Cycle 24 I.O ONEI-000 Rev 27 Page 26 of 33..... .. ..I 105 105 100 95 90 85 80 75 70 65 Control Rod Position Setpoints NoIoerable Rods, 3 Pump Floi T---ibo0 95 90 IT]....1 85 80 75........LLLH[N Unacceptable Operation CL rL aI)[II 60 55 50 45 40 Restricted Operation~Th 70 65 60 55 50 45 40 35 TF 35 30 25 20 15 10!..Li H+tH Acceptable Operation H 4t 25 20 15 10 5 I i 25 Group 6 qI4!I5 5 35 45 55 65 75 85 95 5 0 15 0 10 20 30 40 50 60 70 80 90 100 Group 51 0 10 20 30 40 50 60 70 80 90 1001 1 Group 7 Control Rod Position, % WD Oconee 3 Cycle 24 ID ONEI-000 Rev 27 Page 27 of 33 105 105 95 Control Rod Position Setpoints 1Inoperable Rod, 4 Pump Flow i i p i I LL 0 L)90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 H 444 IT It 1 Unacceptable Operation 100 95 90 85 80 75 70 65 R 60 55 Acceptable Operation II 40 35 30 25 20 15 10 II H TIIIq[I 5 0 Group 6 45 55 65 75 85 95--I 1 Jo 10 20 30 40II115 15 25 35 I0 10 20 30 40 50 60 70 80 90 100I!HI'l H!,1111 llllllllll~ll

>l~lll 0 Group 5 t0 10 20 30 40 50 60 70 80 90 1001 Group7 7 Control Rod Position, % WD Oconee 3 Cycle 24 O NEI- C 0 Rev 27 Page 28 of 33 105 100 105 100 1 I E Control Rod Position Setpoints 95 ..............

Inoperable Rod, 3 Pump Flow CL 0 (0_0 r-)90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0----+lili+......1 w H ill i H!t H+Ht¢I411 H"ll4 Hill It H+H-H t71 TI IA H Unacceptable Operation 70 J i I IL .......L 14+85 w-w 55 ii II H+H-HilT Hill 1 H4I~H[W 4~50 Acceptable Operation 40 35_4 30 25 I-I H+f nTm H 11!1 1 20 15 10!!"Group 6~Ii44 1!I4~,I!+1 It!!!!!II 55 65 75 85 95 i 0 10 20 30 40 50 60 70 80 90 10 Group5 0 10 20 30 40 50 60 70 80 90 100 I Group 7 Control Rod Position, % WD ONEI-0400-70 Rev 27 Page 29 of 33 Oconee 3 Cycle 24 2.0 Core Operating Limits -- Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.Core Power Level, Quadrant Power Ti Core Outl p I 1 2¢21 22 23%FP 3(it, %Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State T 0-100 0-30 30-10 5.40 10.00 9.44 ransient 0 0-30 12.00 Maximum 0 -100 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 et Pressure Reactor Coolant Outlet Temperature, OF sia 3 RCS Pumps 4 RCS Pumps 800 581.0 578.3 900 590.0 587.3)00 598.9 596.3 100 607.9 605.2?00 616.9 614.2 300 625.9 623.2 S ONEI-0400-70 Rev 27 Page 30 of 33 Oconee 3 Cycle 24 Axial Power Imbalance Protective Limits Referred to by TS 2.1.1 4 Pumps 3 Pumps%FP 0.0 80.0 87.1 90.0 100.0 109.4 109.4 100.0 90.0 80.0 0.0 0.0 59.4 77.0 81.7 81.7 77.0 62.3 0.0 RPS Operational

-35.0-35.0-11.4 14.4 35.0 35.0-35.0-35.0-11.4 14.4 35.0 35.0-39.5-39.5-37.0-24.7 28.4 39.5 39.5 39.5-39.5-39.5 39.5 39.5 ONEI-0400-70 Rev 27 Page 31 of 33 Oconee 3 Cycle 24 Rod Index Limits Referred to by TS 3.2.1 Operational RI Shutdown Margin RI Insertion Limit%FP Insertion Limit No Inop Rod 1 Inop Rod 4 Pumps 3 Pumps 102 100 90 80 50 15 5 77 50 15 5 262 260 250 250 200 90 0 245 200 90 0 220 140 75 0 220 140 75 0 280 230 160 75 280 230 160 75 RI Withdrawal Limit 300 300 300 300 300 300 300 300 300 300 300 ONEI-0400-70 Rev 27 Page 32 of 33 Oconee 3 Cycle 24 LOCA Limits Core Elevation Feet LOCA LHR kw/ft Limit Versus Burnup Mk-B11 Fuel*WH-177 Fuel 0.000 2.506 4.264 6.021 7.779 9.536 12.00 0.000 2.506 4.264 6.021 7.779 9.536 12.00 0 GWd/mtU 16.6 17.5 17.6 17.7 17.6 17.5 16.6 0 GWd/mtU 14.9 15.7 15.8 15.9 15.8 15.7 14.9 40 GWd/mtU 16.6 17.5 17.6 17.7 17.6 17.5 16.6 40 GWd/mtU 14.9 15.7 15.8 15.9 15.8 15.7 14.9 62 GWd/mtU 12.2 12.2 12.2 12.2 12.2 12.2 12.2 62 GWd/mtU 11.0 11.0 11.0 11.0 11.0 11.0 11.0*Note for 03C24-->The four "contingency" 2.0 wt% Mk-B1 1 feed assemblies used in this cycle have penalized LOCA limits. The penalties are accounted for in the application of the above limits to the contingency assemblies, as described in the MA.

ONEI-0400-70 Rev 27 Page 33 of 33 Oconee 3 Cycle 24 4 RCP Operation

-Loop Average Temp., 'F 3 RCP Operation

-Loop Average Temp., 'F ATcold, TF Tavg (Analytical)

Tavg (Analytical) 0., <581:0 <581.0 0.1 <581.0 <581.0 0.2 <581.1 <581.0 0.3 <581.1 <581.1 0.4 <581.2 <581.1 0.5 <581.2 <581.1 0.6 <581.2 <581.1 0.7 <581:3 <581.2 0.8 <581.3 <581.2 0.9 <581.3 <581.2 1.0 <581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 <581.3 1.3 <581.5 <581.3 1.4 <581.5 <581.3 1.5 <581.6 <581.3 1.6 <581.6 <581.4 1.7 <581.6 <581.4 1.8 <581.7 <581.4 1.9 <581.7 <581.4 2.0 <581.8 <581.4 2.1 <581.8 <581.5 2.2 <581.8 <581.5 2.3 <581.9 <581.5 2.4 <58129 <581.5 2.5 <582.0 <581.6 2.6 <582.0 <581.6 2.7 <582.0 <581.6 2.8 <582.1 <581.6 2.9 <582.1 <581.6 3.0 <582.1 <581.7 3.1 <582.2 <581.7 3.2 <582.2 <581.7 3.3 <582.3 <581.7 3.4 <582.3 <581.7 3.5 <582.3 <581.8 3.6 <582.4 <581.8 3.7 <582.4 <581.8 3.8 <582.4 <581.8 3.9 <582.5 <581.9 4.0 <582.5 <581.9 4.1 <582.6 <581.9 4.2 <582.6 <581.9 4.3 <582.6 <581.9 4.4 <582.7 <582.0 4.5 <582.7 <582.0 4.6 <582.7 <582.0 4.7 <582.8 <582.0 4.8 <582.8 <582.1 4.9 <582.9 <582.1 5.0 <529<582.1