MONTHYEARML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000237/20230052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2023005; 05000249/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 IR 05000237/20230112024-08-0707 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 IR 05000237/20200012024-08-0606 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 ML24184A1712024-08-0202 August 2024 SLRA Schedule Letter RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information ML24136A1322024-07-30030 July 2024 Transmittal Letter for Renewed License ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24204A1862024-07-24024 July 2024 – Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2; TSTF-591, Revision 0; and 10 CFR 50.69 ML24193A0882024-07-24024 July 2024 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Unit 1 Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations (Docket 50-10) IR 05000237/20243012024-06-27027 June 2024 NRC Initial License Examination Report 05000237/2024301; 05000249/2024301 ML24138A0572024-06-26026 June 2024 – Issuance of Amendment Nos. 285 and 278 Application to Adopt TSTF-564, Safety Limit MCPR ML24138A1812024-06-18018 June 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24128A2742024-06-14014 June 2024 Notice of Acceptance and Opportunity for Hearing - Letter ML24156A2332024-06-11011 June 2024 Letter Supplemental Information for Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24183A2752024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel SVPLTR 24-0020, Registration of Use of Casks to Store Spent Fuel2024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24145A0432024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel 10 CFR 72.212 ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 SVPLTR 24-0019, Registration of Use of Casks to Store Spent Fuel2024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel ML24158A0012024-05-22022 May 2024 License Amendment Request to Adopt TSTF-564 (EPID L-2023-LLA-0120) Illinois State Concurrence ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24135A0722024-05-10010 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report ML24134A1132024-05-0808 May 2024 Retraction: LER 2303-001-00 for Dresden Nuclear Power Station, Unit 2, HPCI Inoperable Due to Air Void Accumulation ML24129A1352024-05-0808 May 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-59 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24092A3412024-05-0101 May 2024 SLRA - Receipt and Availability - Letter IR 05000237/20240012024-05-0101 May 2024 Integrated Inspection Report 05000237/2024001 & 05000249/2024001 ML24127A0982024-04-30030 April 2024 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 IR 05000237/20244012024-04-18018 April 2024 – Security Baseline Inspection Report 05000237/2024401 and 05000249/2024401 ML24108A0082024-04-17017 April 2024 Application for Renewed Operating License RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-04-0202 April 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 2024-09-06
[Table view] Category:Report
MONTHYEARML24271A0292024-09-26026 September 2024 Enclosure - Dresden Nuclear Power Station, Unit 1 - Site Visit Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations SVPLTR 24-0010, Owners Activity Report (OAR-1) for D2R282024-03-15015 March 2024 Owners Activity Report (OAR-1) for D2R28 ML24071A1232024-03-0707 March 2024 Staff’S Assessment of Hazards from a Hypothetical Rupture and Subsequent Release of Natural Gas of the Three Rivers Pipeline Lateral to the Dresden Power Station Units 2 and 3 NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-082, Defueled Safety Analysis Report Update, Revision 112022-06-22022 June 2022 Defueled Safety Analysis Report Update, Revision 11 ML22047A1322022-02-15015 February 2022 Owner'S Activity Report Submittal Fifth 10-Year Interval 2021 Refueling Outage Activities RS-21-086, Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E2021-08-23023 August 2021 Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20300A2352020-11-17017 November 2020 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting RS-20-070, Defueled Safety Analysis Report Update, Revision 102020-06-22022 June 2020 Defueled Safety Analysis Report Update, Revision 10 RS-19-093, Secondary Containment Drawdown Analysis2019-10-17017 October 2019 Secondary Containment Drawdown Analysis ML18138A3852019-03-0606 March 2019 Staff Assessment of Flood Hazard Integrated Assessment (CAC Nos. MG0221 and MG0222; EPID L-2017-JLD-0050) SVPLTR 19-0005, Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities2019-02-0808 February 2019 Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities RS-18-077, Defueled Safety Analysis Report Update, Revision 92018-06-20020 June 2018 Defueled Safety Analysis Report Update, Revision 9 ML18082A0812018-03-13013 March 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-conformances Identified in Response to Regulatory Issues Summary 2015-06, Tornado Missile... RS-18-003, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-01-12012 January 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML18052A4862017-02-12012 February 2017 Owner'S Activity Report Submittal; Fifth 10-Year Interval 2017 Refueling Outage Activities ML16291A0212016-11-0808 November 2016 Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 RS-16-124, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML16190A1162016-07-0606 July 2016 2015 Regulatory Commitment Change Summary Report RS-16-100, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-06-30030 June 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation2016-04-0808 April 2016 Submittal of Post Accident Monitoring Report Instrumentation ML15307A0562015-11-0404 November 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanisms Reevaluation RS-15-265, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2015-10-23023 October 2015 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML15251A3842015-08-31031 August 2015 Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary) ML15215A3372015-07-30030 July 2015 Holtec International Report No. HI-2146153, Revision 2, Licensing Report for the Criticality Analysis of the Dresden Unit 2 and 3 SEP for Atrium 10XM Fuel Design ML15097A5192015-04-27027 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Relating to Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi ML15007A4912015-02-11011 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) SVPLTR 15-0014, Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities2015-02-11011 February 2015 Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities RS-14-310, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality2014-12-30030 December 2014 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 RS-14-208, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14115A2692014-05-30030 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident RS-14-122, Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flooding Hazard Reevaluation Report - Redacted2014-05-19019 May 2014 Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flooding Hazard Reevaluation Report - Redacted ML14153A0062014-04-29029 April 2014 Revision 4 to Local Intense Precipitation Evaluation Report RS-14-067, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of The..2014-03-31031 March 2014 Seismic Hazard and Screening Report (Central and Eastern United States (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of The.. SVPLTR 14-0013, Owner'S Activity Report Submittal Fifth 10-Year Interval 2013 Refueling Outage Activities2014-02-28028 February 2014 Owner'S Activity Report Submittal Fifth 10-Year Interval 2013 Refueling Outage Activities RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.2013-12-19019 December 2013 Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. ML13220A2382013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A8292013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Dresden Nuclear Power Station Units 2 and 3, TAC Nos.: MF1046 and MF1047 ML13126A1902013-03-28028 March 2013 Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 10 of 13 ML13126A1892013-03-28028 March 2013 Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 9 of 13 ML13126A1812013-03-28028 March 2013 Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 2 of 13 RS-12-167, Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 12 of 132013-03-28028 March 2013 Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 12 of 13 RS-13-067, Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 11 of 132013-03-28028 March 2013 Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 11 of 13 ML13126A1792013-03-28028 March 2013 Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 1 of 13 ML13126A1802013-03-28028 March 2013 Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 13 of 13 ML13126A1882013-03-28028 March 2013 Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 8 of 13 2024-09-26
[Table view] Category:Administrative
[Table view] |
Text
Exelkan.Exelon Generation Company, LLC www.exeloncorp.coM Nuclear Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450-9765.
February 20, 2007 SVPLTR #07-0010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Unit 3 Facility Operating License No. DPR-25 NRC Docket No. 50-249
Subject:
Owner's Activity Report Submittal Fourth 10-Year Interval 2006 Refueling Outage Activities This letter submits the Owner's Activity Report (i.e., Form OAR-i) and Invessel Visual Inspection (IVVI) Report for the Dresden Nuclear Power Station (DNPS) Unit 3 refueling outage (D3R19) whicti°began on November 3, 2006, and was completed on November 22, 2006. This is the first refueling outage conducted in the second inspection period of the fourth 10-year inservice inspection interval for DNPS Unit 3. A copy of the Owner's Activity Report and IVVI Report are provided as attachments to this letter.This Owner's Activity Report is submitted in accordance with American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-1, "Alternate Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission," and Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section Xl, Division 1," Revision 14. Code Case N-532-1 requires an Owner's Activity Report Form OAR-1 to be prepared and certified upon completion of each refueling outage. In accordance with the conditions of Regulatory Guide 1.147, this OAR-1 form is being submitted within ninety days of the completion of the refueling outage.The IVVI report meets the reporting requirements of BWRVIP-18, "BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines" and BWRVIP-94, "BWR Vessel and Internals Project Program Implementation Guide."
February 20, 2007 U. S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this letter, please contact Mr. James Ellis, Regulatory Assurance Manager, at (815) 416-2800.Respectfully, Danny G. Bost Site Vice President Dresden Nuclear Power Station Attachments:
Owner's Activity Report, Form OAR-1 Invessel Visual Inspection Report cc: Regional Administrator
-Region III NRC Senior Resident.
Inspector, Dresden Station FORM OAR-I OWNER'S ACTIVITY REPORT Report Number Refueling Outage D3R19 OAR-1 Owner Exelon Generation Company (EGC, LLC), 300 Exelon Way, Kennett Square, PA, 19348 (Name and Address of Owner)Plant Dresden Nuclear Power Station, 6500 N. Dresden Road, Morris, IL 60450 (Name and Address of Plant)Date 11-16-1971 Unit No. 3 Commercial Service I (if applicable)
Current inspection interval 4 t" Inspection Interval Current inspection period 2nd Inspection Period Refueling OutageNo.D3R19 (1st, 2nd, 3rd, 4th, other)(I st, 2nd, 3rd)Edition and Addenda of Section XI applicable to the inspection plan _1995 Edition with 1996 Addenda Date and revision of inspection plan 09/15/2006 Revision 5 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan N/A CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.Certificate of Authorization No. None (if applicable)
Signed k ci. "t(' , ISI Coordinator Expiration Date jNot Applicable Date 2 1/ ,,- 7 Owner or Owner's Designee, Title (¶ I-~CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois , and employed by The HSBCT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, during the period 02/18/2006 to 02/15/2007, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations tests, repairs, replacements, evaluations, and corrective measures described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
- -.- Commissions IL 1546 Insoector's Sionature National Board. State. Province.
and Endorsements Date -// -I)2 TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) To Examination Required for Credited for Credited (%) Date for The Category The Interval This Period For The Period Interval Remarks B-A 2 1 50 50 Components scheduled in accordance with Program B.One during the second inspection period and one during the third inspection period.23 0 0 0 Deferral Permissible B-D 62 5 8 34 Components scheduled in accordance with Program B.B-G-1 8 0 0 38 Deferral Permissible B-G-2 37 7 19 41 Components scheduled in accordance with Program B.1 0 0 100 Examinations limited to components selected under Examination Category B-L-2 and B-M-2.B-K 11 4 36 64 Components scheduled in accordance with Program B.B-L-2 N/A N/A N/A N/A Examinations limited to disassembled components.
B-M-1 1 0 0 0 Deferral Permissible B-M-2 5 0 0 100 Examinations limited to disassembled components.
B-N-1 1 0 0 100 One component examined each inspection period.B-N-2 80 0 0 1 Deferral Permissible B-O 8 0 0 0 Deferral Permissible B-P 2 2 100 200 Two pressure tests performed each refuel outage.C-A 2 0 0 0 Components scheduled in accordance with Program B.One during the second inspection period and one during the third inspection period.C-B 12 0 0 17 Components scheduled in accordance with Program B.6 0 0 100 Six components examined each inspection period.C-C 10 0 0 30 Components scheduled in accordance with Program B.C-H 17 1 6 106 Eighteen pressure tests performed each inspection period.F-A 154 41 27 54 Components scheduled in accordance with Program B.R-A 71 20 28 52 Components scheduled in accordance with Program B.24 24 100 200 Twenty-one components examined each refuel outage.
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw Examination Item Characterization Flaw or Relevant Condition Found During Scheduled Section Xl Category Item Number Description (IWA-3300)
Examination or Test (Yes or No)No items with flaws or relevant conditions required evaluation for continued service during the period covered by this report.
TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Repair, Flaw or Relevant Condition Replacement, Found During Scheduled Repair/Code or Corrective Section Xl Examination or Replacement Class Measure Item Description Description of Work Test (Yes/No) Date Completed Number U3 Target Rock Tightened Lock Nuts Corrective Snubber Lock Nuts To Proper Torque 1 Measure Found Loose Value No 11/18/06 N/A Loose Nuts On Corrective Penetration X-137 Torqued Penetration MC Measure Cover Cover Bolts. Yes 11/20/06 N/A 3A CCSW Pump Corrective Suction Support Found 3 Measure Unloaded Support Adjusted.
No 9/14/06 N/A Spring Can For Support Corrective M-1 164D-88 Required Scheduled For 3 Measure Adjustment Adjust Support. Yes 4/19/07 N/A Loose Bracket Found Corrective On Iso Cdr Pipe 2 Measure Support Tightened Bracket. No 3/22/06 N/A Dresden Unit 3 In-Vessel Visual Inspection Report Refueling Outage D3R19 Core Spray System Inspections During D3R18, Dresden performed a Lower Sectional Replacement (LSR) on all four Core Spray lines. The LSR replaced the piping with previously identified cracking.
In D3R19, a visual inspection was performed on the LSR after one cycle of operation.
The inspection included a VT-I of the accessible bolting and locking devices and a general visual examination (VT-3) to confirm the repair hardware is in place and has not shifted or changed from the installed condition.
The inspection resulted in no relevant indications. (Note: All of the welds in the LSR are solution annealed after welding and are located in low carbon steel base material.Fabrication requirements include appropriate measures from BWRVIP-84 to prevent surface cold work. Therefore, no periodic inspections of the welds in the LSR hardware are required.)
Steam Dryer Inspections The steam dryer was replaced with a new dryer similar to the steam dryers previously installed at Quad Cities 1 and 2. Inspections were performed on outer hood welds on the removed steam dryer where cracking had been identified and repaired during previous outages. No relevant indications were identified during these inspections.
The purpose of the inspections was to evaluate the previous repairs and modifications for applicability to Dresden 2. The Dresden 2 steam dryer has not been replaced and has the same repairs/modifications as the old steam dryer removed from Unit 3.Shroud Inspections Ultrasonic examinations were performed on the accessible core shroud vertical welds (excluding ring welds). Eleven welds were examined including all six in the beltline region. One relevant indication was identified in weld V27, which is below the beltline region. Over 69% of weld V27 was examined from each side. The indication was 1.8 inches in length (4.8% of weld) and less than 0.2 inches in depth (less than 10% thruwall).
The flaw was evaluated in accordance with the guidance provided in BWRVIP-76.
The evaluation concluded the V27 weld is acceptable until the next inspection (10 years).