ML16256A185 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 08/25/2016 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16256A115 | List:
|
References | |
W3F1-2016-0053 | |
Download: ML16256A185 (4) | |
Similar Documents at Waterford | |
---|---|
Category:Drawing
MONTHYEARML20258A0922019-09-11011 September 2019
[Table view]11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted W3F1-2016-0053, Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.8, Figures 3.8-1 Through 3.8-472016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.8, Figures 3.8-1 Through 3.8-47 ML16344A2502016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6A, Figures 3.6A-1 Through 3.6A-67 ML16257A1532016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix B, Figure 15B-1 ML16256A2102016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.3, Figures 4.3-1 Through 4.3-60 ML16344A2962016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.2, Figures 5.2-1 Through 5.2-30 ML16344A2712016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Appendix 4.3A, Figures 4.3A-1 Through 4.3A-19b ML16256A1842016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.7, Figures 3.7-1 Through 3.7-36 ML16257A1522016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 2, Figures 15.2-1 Through 15.2-65 ML16344A2932016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1, Figures 5.1-1 Through 5.1-4 ML16256A1852016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.7A, Figures 3.7A-1 Through 3.7A-4 ML16256A2132016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.4, Figures 4.4-1 Through 4.4-11 ML16256A1832016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6C, Figures 3.6C-1 Through 3.6C-9 ML16256A1982016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.9, Figures 3.9-1 Through 3.9-20 ML16256A1962016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6B, Figures 2.1.1 Through 4.19 ML16357A7602016-08-25025 August 2016 Redacted Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.2, Figures 4.2-1 Through 4.2-12 ML16257A2672015-07-0101 July 2015 Revision 309 to Final Safety Analysis Report, Drawing G162, Sh. 2, Rev. 37, Flow Diagram Sampling System. ML16257A2692014-11-13013 November 2014 Revision 309 to Final Safety Analysis Report, Drawing G162, Sh. 1, Rev. 24, Flow Diagram Sampling System. W3F1-2010-0050, Drawing G287, Revision 21, 125 Vdc and 120 Vac One Line Diagram. Sheet 12008-06-0202 June 2008 Drawing G287, Revision 21, 125 Vdc and 120 Vac One Line Diagram. Sheet 1 ML0612801112005-06-0606 June 2005 ER-W3-2004-0122-000, Pressurizer Heater Sleeve and Instrument Nozzle Repair ML0612800912005-02-25025 February 2005 ER-W3-2004-0122-000, Pressurizer Heater Sleeves and Instrument Nozzles Weld Repair ML0331401672003-11-0404 November 2003 Table, CEDM Nozzle Freespan Lengths ML0223202032002-07-30030 July 2002 Drawing SK-G-M-530, Rwsp Refuel Water Storage Purification System. ML0223201952002-07-30030 July 2002 Drawing SK-G-M-529, Rwsp Refuel Water Storage Purification System. ML0223201422002-07-30030 July 2002 Drawing SK-G-M-528, Rwsp Refuel Water Storage Purification System. 2019-09-11 Category:Final Safety Analysis Report (FSAR) MONTHYEARML20258A0872019-09-11011 September 2019
[Table view]11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted ML20258A0882019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML20258A0712019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted ML20258A0912019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML20258A0922019-09-11011 September 2019 11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2422018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML20255A2532018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML20255A2182018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2392018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted W3F1-2017-0078, Final Safety Analysis Report, Revision 3102017-12-0606 December 2017 Final Safety Analysis Report, Revision 310 ML16256A4332016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 8, Table of Contents ML16256A2832016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2B ML16256A1932016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.4 - Water Level (Flood) Design ML16257A1182016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 14, Initial Test Program, Table of Contents ML16256A1382016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.9, Figures 1.93 Through 1.94 ML16257A1502016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15D, Figures 15D.1-1 Through 15D.1-7 ML16257A0912016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Table of Contents ML16256A1822016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6C - Bend Force Calculation in a Piping System Using CALPLOTF2421 ML16257A1442016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Figures 15A.3-1 Through 5A.3-2 ML16256A2762016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2C ML16257A0952016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.3 ML16257A0962016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.4 ML16257A0882016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 12, Radiation Protection, Section 12.4 ML16257A1412016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A ML16257A0992016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.7 ML16257A0982016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.6 ML16256A1742016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.3 ML16256A4812016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Table of Contents ML16257A0972016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.5 ML16256A1282016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.6 ML16257A0942016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.2 ML16256A1892016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.9A - Seismic Considerations for Equipment Specifications ML16257A1002016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Appendix 13A ML16257A1382016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.8 ML16257A1582016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML16256A1272016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.4 ML16256A4902016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4.9A, Figure 10.4.9A-1 ML16256A2412016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.2B, Figures 5.2B-1 Through 5.2B-3 ML16256A2392016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.2A, Figures 5.2A-1 Through 5.2A-4 ML16256A3262016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Appendix 7.7A ML16257A1512016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix D, Figures 15D.2-1 Through 15D.2-7 ML16256A1232016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.0 ML16256A2702016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Section 6.0 ML16256A1922016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.10 - Seismic Qualifications of Seismic Category 1 Instrumentation & Electrical Equipment ML16256A4822016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Sections 10.0 and 10.1 ML16257A0792016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Section 11.2, Figures 11.2-1 Through 11.2-2 ML16256A3322016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Section 7.8 ML16256A1362016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.5 ML16257A1472016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15C 2019-09-11 |
Text
a I-N LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station SOIL SHEAR MODULUS DISTRIBUTION DURING SAFE SHUTDOWN EARTHQUAKE Figure