Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2
ML18152B651
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/31/1999
From: ASHLEY J S, PINCUS J R, STIEF R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18152B650 List:
References
NUDOCS 9904190257
Download: ML18152B651 (18)


Text

1*~ I e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-03 Approved:

t./ 12. I ,~ 9904190257 990413 PDR ADOCK 05000280 R PDR Date -1 e TABLE OF CONTENTS Section e Surry Monthly Operating Report No. 99-03 Page 2 of 18 Page Operating Data Report -Unit No. 1 ............................................................................................................................

3 Operating Data Report -Unit No. 2 ............................................................................................................................

4 Unit Shutdowns and Power Reductions

-Unit No. 1 ..................................................................................................

5 Unit Shutdowns and Power Reductions

-Unit No. 2 ..................................................................................................

6 Average Daily Unit Power Level -Unit No. 1 ..............................................................................................................

7 Average Daily Unit Power Level -Unit No. 2 ..............................................................................................................

8 Summary of Operating Experience

-Unit Nos. 1 and 2 ..............................................................................

..............

9 Facility Changes That Did Not Require NRC Approval ............................................................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval.

................................................

11 Tests and Experiments That Did Not Require NRC Approval ..................................................................................

12 Chemistry Report .....................................................................................................................................................

13 Fuel Handling -Unit Nos. 1 and 2 ............................................................................................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications

.......................................................................................................................

18

1. 2. 3. 4. 5. 6. 7. e OPERATING DATA REPORT e Surry Monthly Operating Report No. 99-03 Page 3 of 18 Docket No.: Date: Completed By: 50-280 04/01/99 R. Stief Unit Name: .......................................................... . Reporting Period: ...............................................

.. Licensed Thermal Power (MWt): ........................

.. Nameplate Rating (Gross MWe): .......................

.. Design Electrical Rating (Net MWe): ..................

.. Maximum Dependable Capacity (Gross MWe): .. . Maximum Dependable Capacity (Net MWe): ...... . Surry Unit 1 March 1999 2546 847.5 788 840 801 Telephone:

(757) 365-2486 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 230304.0 12. Hours Reactor Was Critical 744.0 2160.0 163476.5 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5 14. Hours Generator On-Line 744.0 2160.0 160931.4 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2 16. Gross Thermal Energy Generated (MWH) 1893613.0 5497465.9 379688423.4
17. Gross Electrical Energy Generated (MWH) 629447.0 1830877.0 124601033.0
18. Net Electrical Energy Generated (MWH) 608218.0 1769724.0 118756328.0
19. Unit Service Factor 100.0% 100.0% 69.9% 20. Unit Availability Factor 100.0% 100.0% 71.5% 21. Unit Capacity Factor (Using MDC Net) 102.1% 102.3% 66.2% 22. Unit Capacity Factor (Using DER Net) 103.7% 104.0% 65.4% 23. Unit Forced Outage Rate 0.0% 0.0% 14.3% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED

1. 2. 3. 4. 5. 6. 7. OPERATING DATA REPORT e Surry Monthly Operating Report No. 99-03 Page 4 of 18 Docket No.: Date: Completed By: 50-281 04/01/99 R. Stief Unit Name: .......................................................... . Reporting Period: ................................................ . Licensed Thermal Power (MWt): ......................... . Nameplate Rating (Gross MWe): ........................ . Design Electrical Rating (Net MWe): ................... . Maximum Dependable Capacity (Gross MWe): .. . Maximum Dependable Capacity (Net MWe): ...... . Surry Unit 2 March 1999 2546 847.5 788 840 801 Telephone:

(757) 365-2486 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Year-To-Date

11. Hours in Reporting Period 744.0 2160.0 12. Hours Reactor Was Critical 744.0 2160.0 13. Reactor Reserve Shutdown Hours 0.0 0.0 14. Hours Generator On-Line 744.0 2160.0 15. Unit Reserve Shutdown Hours 0.0 0.0 16. Gross Thermal Energy Generated (MWH) 1612656.8 5201600.3
17. Gross Electrical Energy Generated (MWH) 545360.0.

1750535.0

18. Net Electrical Energy Generated (MWH) 525041.0 1689742.0
19. Unit Service Factor 100.0% .100.0% 20. Unit Availability Factor 100.0% 100.0% 21. Unit Capacity Factor (Using MDC Net) 88.1% 97.7% 22. Unit Capacity Factor (Using DER Net) 89.6% 99.3% 23. Unit Forced Outage Rate 0.0% 0.0% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling, April 18, 1999, 36 Days 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED Cumulative 227185.0 162070.3 328.1 160053.5 0.0 378997249.3 124298428.0 118511769.0 70.5% 70.5% 66.6% 66.2% 11.2%

e Surry Monthly Operating Report No. 99-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%) (1) F: Forced S: Scheduled (4) REPORT MONTH: March 1999 None during the Reporting Period (2) REASON: A -Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. R. Pincus Telephone:

(757) 365-2863 (3) METHOD: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain)

(5) Exhibit 1 -Same Source e Surry Monthly Operating Report No. 99-03 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%) (1) F: Forced S: Scheduled (4) REPORT MONTH: March 1999 None during the Reporting Period (2) REASON: A -Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. R. Pincus Telephone:

(757) 365-2863 (3) METHOD: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain)

(5) Exhibit 1 -Same Source

~~--------e e Surry Monthly Operating Report No. 99-03 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. S. Ashley Telephone:

(757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (MWe -Net) Day (Mwe -Net) 819 17 818 2 819 18 819 3 819 19 819 4 819 20 819 5 819 21 818 6 820 22 793 7 819 23 812 8 818 24 818 9 818 25 818 10 819 26 815 11 819 27 812 12 820 28 818 13 820 29 819 14 820 30 820 15 819 31 820 16 819 INSTRUCTIONS On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt.

MONTH: March 1999 Day 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 INSTRUCTIONS e e Surry Monthly Operating Report No. 99-03 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Average Daily Power Level (Mwe -Net) Day 750 17 750 18 751 19 749 20 747 21 747 22 748 23 747 24 745 25 741 26 736 27 732 28 726 29 724 30 718 31 713 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. S. Ashley Telephone:

(757) 365-2161 Average Daily Power Level (Mwe -Net) 707 701 699 692 686 682 673 671 664 662 658 650 644 640 624 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt.

e

SUMMARY

OF OPERATING EXPERIENCE MONTHNEAR:

March 1999 Surry Monthly Operating Report No. 99-03 Page 9 of 18 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNIT ONE: 03/01/99 03/21/99 03/23/99 03/31/99 UNIT TWO: 03/01/99 03/31/99 03/31/99 03/31/99 03/31/99 03/31/99 03/31/99 0000 2320 0746 2400 0000 1653 1654 1700 2027 2212 2400 Unit starts the month at 100% / 855 MWe. Removed waterbox "B" from service. Unit at 100% / 830 MWe. Returned waterbox "B" to service. Unit at 100% / 849 MWe. Unit finished the month at 100% / 850 MWe. Unit started the month at 91.5% / 780 MWe. (Began cycle coast-down 02/24/99)

Power lost to MSR control system. Unit at 76% / 765 MWe. Commenced unit ramp down to stabilize Tave/Tref.

Unit at 76% / 765 MWe. Unit stable at 71 % / 615 MWe. Commenced return to service of MSRs. Unit at 71 % / 615 MWe. MSRs returned to service. Unit at 75% / 650 MWe. Unit finished the month at 76% / 660 MWe.

DCP 95-017 FS99-013 e Surry Monthly Operating Report No. 99-03 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:

March 1999 Design Change Package (Safety Evaluation 98-050) 04/24/98 Design Change Package 95-017, "Emergency Diesel Generator (EDG) SV Relay Replacement/Surry/Units 1 & 2", replaced the existing "low ruggedness" EDG Field Flash Cut-Off Relays with new relays recommended by Engine Systems, Inc. to reduce contact chattering.

The new relays meet Virginia Power's seismic requirements.

UFSAR Change Request (Safety Evaluation 99-019) 03/25/99 This UFSAR Change documents the use of ASME Boiler and Pressure Vessel Code, Section Ill, Appendix F, "Rules for Evaluation of Service Loadings with Level D Service Limits", for evaluating isolated water filled containment penetrations that are potentially susceptible to over-pressurization during a Design Basis Accident.

O-ECM-1509-03 LDS-SPS1/2 e PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:

March 1999 Electrical Corrective Maintenance (Safety Evaluation 99-014) Surry Monthly Operating Report No. 99-03 Page 11 of 18 03/11/99 Electrical Corrective Maintenance Procedure, O-ECM-1509-03, "VOTES MOV Testing for Quarter Turn Valves", was revised to invoke administrative controls on the Service Water (SW) Motor Operated Valves (MOV) when one is taken out of service for MOV testing. This will maintain the capability to isolate the non-essential SW flowpaths affected by the inoperable valve. Vendor Procedure (Safety Evaluation 99-016) 03/17/99 Vendor Procedure, LDS-SPS1/2, "Instructions for Valve Acoustic Leak Monitoring", was approved so that vendor technicians can perform leak monitoring on various secondary valves and traps using non-intrusive equipment provided by Leak Detection Services, Inc. while Units 1 and 2 are in normal operation at or near full power.

e Surry Monthly Operating Report No. 99-03 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR:

March 1999 None during the Reporting Period CHEMISTRY REPORT MONTHNEAR:

March 1999 Unit No. 1 Primary Coolant Analysis Max. Min. AvQ. Gross Radioactivity, µCi/ml 4.13E-1 2.37E-1 3.05E-1 Suspended Solids, oom O.Q1 0.01 0.01 Gross Tritium, µCi/ml 8.67E-1 7.07E-1 8.01 E-1 1131, µCi/ml 3.90E-4 2.70E-4 3.33E-4 113111133 0.09 0.03 0.06 HvdroQen, cc/kQ 41 38.7 40 Lithium, oom 2.33 2.07 2.22 Boron -10, ppm* 228.14 214.03 220.76 OxyQen, (DO), oom 0.005 0.005 0.005 Chloride, ppm 0.023 0.02 0.021 pH @ 25 degree Celsius 6.56 6.16 6.45

None e Surry Monthly Operating Report Unit No. 2 Max. Min. 1.70E-1 1.06E-1 0.01 0.01 3.86E-2 2.83E-2 8.75E-5 3.90E-5 0.12 0.03 37.4 35 0.84 0.68 0.392 0.196 0.005 0.005 0.002 0.001 9.54 9.22 No. 99-03 Page 13 of 18 AvQ. 1.46E-1 0.01 3.38E-2 6.98E-5 0.01 35.8 0.78 0.208 0.005 0.001 9.43 New Fuel Shipment or Cask No. Dry Storage Cask TN 32-08 e FUEL HANDLING UNITS 1 & 2 MONTH/YEAR:

March 1999 Number of Date Stored or Assemblies Assembly ANSI Received ~er Shi~ment Number Number 03/01/99 32 2EO LMODF6 289 LMOESW 281 LMOET8 386 LMOERV 2TO LMOK8R 1T5 LMOK8M 1T2 LMOK8B 2T6 LMOK8U 2T1 LMOK87 2T7 LMOK8J 1T9 LMOK8C W41 LM041Y OF4 LMOJGN W29 LM041A 1T6 LMOK88 2T5 LMOK8E 1T8 LMOK85 1T1 LMOK89 e Surry Monthly Operating Report Initial Enrichment 3.5984 3.5996 3.6032 3.5890 3.5850 3.5781 3.5938 3.5872 3.5799 3.5826 3.5882 3.2030 3.6106 3.2030 3.5810 3.5836 3.5815 3.5985 No. 99-03 Page 14 of 18 New or Spent Fuel Shipping Cask Activi!Y N/A New Fuel Shipment or Cask No. FUEL HANDLING UNITS 1 & 2 MONTHNEAR:

March 1999 Number of Date Stored or Assemblies Received per Shipment Assembly Number W32 W20 1T4 2T4 1T7 no 2T8 2T3 1T3 2T2 OT9 1S4 1S2 407 ANSI Number LM0412 LM040X LMOK8W LMOK8L LMOK86 LMOK8G LMOK8D LMOK8N LMOK8P LMOK8T LMOK85 LMOESK LMOESU LMOAM6 e Surry Monthly Operating Report Initial Enrichment 3.2030 3.2030 3.5883 3.5936 3.5815 3.5945 3.5964 3.5968 3.5856 3.5952 3.5923 3.5980 3.5995 3.6097 No. 99-03 Page 15 of 18 New or Spent Fuel Shipping Cask Activity New Fuel Shipment or Cask No. Dry Storage Cask TN 32-09 FUEL HANDLING UNITS 1 & 2 MONTHNEAR:

March 1999 Number of Date Stored or Assemblies Received per Shipment 03/01/99 32 Assembly Number 4T4 4S5 4SO 4T3 5F3 5S7 2F5 1F8 OF9 4F4 2S2 4S7 2F8 2F4 OF5 1S3 1S5 ANSI Number LMOK9B LMOERL LMOERQ LMOK9K LMOJHE LMOESS LMOJGK LMOJGG LMOJGP LMOJGV LMOERZ LMOERP LMOJG5 LMOJGC LMOJG3 LMOET6 LMOET5

  • Surry Monthly Operating Report Initial Enrichment 3.7977 3.5972 3.5955 3.7880 3.7926 3.5991 3.5868 3.6032 3.5951 3.7938 3.5985 3.5974 3.5857 3.5961 3.5995 3.5976 3.5991 No. 99-03 Page 16. of 18 New or Spent Fuel Shipping Cask Activity N/A New Fuel
  • Shipment or Cask No.
  • FUEL HANDLING UNITS 1 & 2 MONTH/YEAR:

March 1999 Number of Date Stored or Assemblies Received per Shipment Assembly Number 4S2 W48 OF1 OF2 OS9 4F7 2F7 2F3 1FO 3S4 3FO 4T2 5S8 5S3 4T1 ANSI Number LMOERM LM041T LMOJGO LMOJG1 LMOET1 LMOJHK LMOJGL LMOJGA LMOJG7 LMOERJ LMOJH5 LMOK9A LMOESG LMOETO LMOK9E

  • Surry Monthly Operating Report Initial Enrichment 3.5965 3.2030 3.5973 3.5860 3.5997 3.7969 3.5927 3.5855 3.5960 3.5993 3.7950 3.7984 3.6000 3.5997 3.7940 No. 99-03 Page 17 of 18 New or Spent Fuel Shipping Cask Activity
  • Surry Monthly Operating Report No. 99-03 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR:

March 1999 None during the Reporting Period