Forwards Proposed Change to Tech Specs & $1200 Amend Fee. Change Is Administrative.Requests Issuance by 790215
ML18043A369
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/27/1978
From: HOFFMAN D P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: ZIEMANN D L
Office of Nuclear Reactor Regulation
References
NUDOCS 7901030228
Download: ML18043A369 (3)


Text

consumers Power company * * . General Offices: 212 West Michigan Avenue, .Jackson, Michigan 49201

  • Area Code *517 788-0550 't December 27, 1978 Director, Nuclear Reactor Regulation Att: Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20. -PALISADES PLANT -PROPOSED TECHNICAL SPECIFICATIONS CHANGE RELATED TO PLANT ORGANIZATION Transmitted.

herewith are three. (3) original and thirty .... seven (37) conformed copies of a proposed change to the Technical Specifications.

The purpose of this change is to provide a more efficient plant organization.

It is requested' that this change be. issued. prior to. February 15,

  • 1979. The requested cha.nge involves an administrative issue and has no safety or environmental effect. Therefore, a check in the a.mount of $1,200 is attached pursuant to a 10 CFR 170.22 -Class II change. David P Hoffman Assistant Nuclear Licensi_ng Administrator CC: JGKeppler, USNRC RE,GULATORY DOCi<ET CONSUMERS POWER COMPANY Docket 50-255
  • C-, Request for Change to the Technical Specifications License DPR-20 For the reasons hereinafter set forth, it is requested that the Technical . Specifications contained in Provisional Operating License DPR-20, Docket 50-255,
  • issued to Consumers.Power Company on October l6, l972 for the Palisades Plant be changed as described in Section I below: I. Change A. Replace existing Figure 6.2-2 with new Figure 6.2-2. II. Discussion The purpose of this change is to bring Figure 6.2-2 in line with ANSI Nl8.l-l97l and to provide the Generating Plant Superintendent-Nuclear with the flexibility required to efficiently operate a nuclear power plant. III. Conclusion Based on the foregoing, both the.Palisades Plant Review Committee and the Safety and Audit Review Board have reviewed these changes and find them acceptable.

CONSUMERS POWER COMPANY Sworn and subscribed to before me this 20th day of December 1978.

Jackson County, Mi igan My commission expires July 9, 1979. \ I r ,

  • !' . QA -Admin Off Site QA Supt I Operations Superintendent SOL (b) (d) Operations Supervisor SOL (c) Shift Supervisors SOL
  • CONSUMERS POWER COMPANY Plant Organization Generating Plant Superintendent-Nuclear (a) * -----------

Plant Review Commit tee) I Maintenance Health Technical Superintendent Physicist Superintendent

-A. (d) .The following disciplines will be represented by q; ualified Supertil-* irectly *personnel who will report to the Generating Plant tendent-Nuclea.r or to an individual who reports d. to the Generating Plant Superintendent-Nuclear.

l. Reactor Engineering and Physics 2 *. Instrumentation and Control 3. Radiochemistry
4. Radiation Protection (Reports to Health Physic ist) A single individual may be q_ualified and perform in more than one discipline.

B. The. Security Force will be supervised as described in the Plant Security Plan. C. Quality Control Activities will be in accordance with the ConsUl!lers Power Quality Assurance Program Policies.

D. All other personnel will report at the discretion of the Generating Plant Superintendent-Nuclear. (a) (b)* Responsible for the Plant Fire Protection Program (c) (d) The Operations Superintendent need not hold an SOL provided he meets the other req_uirementsof 6.3.1 of these Specifications and the position of "Operations Supervisor" is filled. Under these conditions, the Operations Supervisor shall be responsible for directing the activities of licensed operators.

This position need not be filled if the Operations Superintendent holds an SOL. The Operations and Maintenance Superintendents' positions may be combined under one individual. (SOL -Senior Operator Licensee)

Figure 6.2-2