ML061000265

From kanterella
Revision as of 05:43, 28 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Examination Submittal Cover Letter and Checklist for the Palisades Retake Examination - February 2006
ML061000265
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/07/2006
From: Harden P A
Nuclear Management Co
To: Walton K
NRC/RGN-III
Shared Package
ML060760460 List:
References
50-255/06-301, NUREG-1021
Download: ML061000265 (3)


Text

EXAMINATION SUBMITTAL COVER LETTER AND CHECKLIST FOR THE PALISADES RETAKE EXAMINATION - FEBRUARY 2006 Palisades Nuclear Plant Operated by Nuclear Management Company, LLC December 30,2005 NUREG-I 021 Mr. Keith Walton Nuclear Regulatory Commission Region 111 2443 Warrenville Road Suite 21 0 Lisle, IL 60532-4352 Palisades Nuclear Plant Initial License Retake Written Examination and Reference Materials Nuclear Management Company, LLC, is submitting the initial license retake written examination and reference materials, for the Palisades Nuclear Plant, in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9. The initial license retake examination is scheduled for February 6, 2006, through February 10, 2006. The following materials are enclosed:

ES-401-6, "Written Exam Quality Checklist," for Reactor Operator (RO) 75 written exam questions, including distracter analysis, supporting references, and original form of bank question (as appropriate) Pursuant to NUREG-1021, these materials shall be withheld from public disclosure until after the examination is complete. Please contact Ross Snuggerud at (269) 764-2129, if you have any questions regarding this submittal.

Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC R 2006 \AN(\ 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: 269.764.2000 L

ES-401 Written Examination Quality Checklist Form ES-401-6 Facility .?& 1. SAdW Date of Exam 2 / b . 2/10 156 Exam Level mRC - Item Description a

1. 2. a. NRC WAS are referenced for all questions. Questions and answers are technically accurate and applicable to the facility.

plr: @ rJ 14 b. Facility learning objectives are referenced as available.

3. SRO questions are appropriate in accordance with Section D 2.d of ES-401 4 f more liian lour RO and rvvo SRO q.eslions are repeatco

+om the last lvio hRC crnsing exams the faci ty I~censee s sanip ng process was random ana Systemal c Quesi on a-p icalion from the license screen nglaudit exam

.%as ConlrO ea as mo~cateo De ow (cneck tne ilem that app .es) and appears appropi ate !ne audit exam .vas systemal cally and random<y aevelopon tne adail exam *as campleteo oelore the license exam was Stanea [ne exammat-ons

  • ere neve oped independenlly the censee cenifes inai lnere s no dup cation olner (expla nl 5 f - 6 Ban< .se meets am 1s (no more Inan 75 percent Band Maafieo Ne* w from Ihe oan* al east 10 percent new ana Ine rest ne* or mod feo) enter the actua RO SRO-on y q.est#on astr 0-1 on(sj al rignl I8 44 3 t~b )'I +I* I 7 Beween 50 an0 60 percenl of Ine quest ons on the RO Memo? CA exam are .mien at tne comprehens on. analysis leve, se ecteo k As support me h gner cogn.1 ve levels. enter the aclua RO. SRO qbestior a str DAonts) at nghl Ine SRO exam may exceeo 60 percent 11 the randomly pgs 3 3 ! N\ A ql t~ 14 8. Referenceslhandouts provided do not give away answers or aid in the elimination of distractors. Question content conforms with specific WA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified.

NfJ w w 9. 10. 11. Question psychometric quality and format meet the guidelines in ES Appendix B. The exam contains the required number of one-point, multiple choice items; the total is correct and aqrees with the value on the cover sheet. rinted Name I Si a. Author b. Facility Reviewer

(*) c. NRC Chief Examiner

(#) d. NRC Regional Supervisor " Note:

  • The facility reviewer's initialslsignature are not applicable for NRC-developed examinations
  1. Independent NRC reviewer initial items in Column IC"; chief examiner concurrence required.

ES-401, Page 29 of 33