ML071440370

From kanterella
Revision as of 19:30, 23 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2007/04/24-Summary of Annual Assessment Meeting with PPL Susquehanna to Discuss Nrc'S Assessment of Safety Performance of Susquehanna Steam Electric Station for Calendar Year 2006
ML071440370
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/24/2007
From: Krohn P G
Reactor Projects Region 1 Branch 4
To:
NRC Region 1
KROHN P G, RI/DRP/PB4/610-337-5120
References
Download: ML071440370 (2)


Text

May 24, 2007MEETING

SUMMARY

LICENSEE:PPL SUSQUEHANNA, LLCFACILITY:SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF APRIL 24, 2007, ANNUAL ASSESSMENT MEETING WITH PPLSUSQUEHANNAOn April 24, 2007, at 2:30 p.m., an Annual Assessment Meeting was conducted at theSusquehanna Energy Information Center between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna (PPL). The NRC requested the meeting with PPL management to discuss the NRC's assessment of the safety performance of the Susquehanna Steam Electric Station (SSES) for calendar year 2006. The NRC presented and discussed its assessment of the safety performance of SSES Units 1and 2 for the period between January 1 through December 31, 2006. The NRC presentations included a discussion of the Reactor Oversight Process, general background on both plants,2006 performance assessment results, and an overview of calendar year 2007 planned inspections. As part of the annual assessment meeting, PPL presented an overview of their performance and initiatives in selected areas. The public observed the meeting and were offered the opportunity to communicate with theNRC regarding PPL's performance at SSES and the role of the agency in ensuring safe plant operations. At the end of the meeting the NRC answered questions from the public, including a discussion of dry cask storage plans, long-term high level waste repository initiatives at Yucca Mountain, and a brief discussion of fuel vendor status regarding channel bowing effects. The meeting notice with attached meeting agenda can be located in ADAMS under Accession Number ML071000363. The slides for the meeting can be found in ADAMS under Accession Number ML071440156.Sincerely,/RA/Paul G. Krohn, ChiefProjects Branch 4 Division of Reactor Projects 2Distribution:P. Krohn, DRPR. Fuhrmeister, DRP T. Setzer, DRP A. Blamey, DRP F. Jaxheimer, DRP P. Finney, DRS R. Guzman, NRRSUNSI Review Complete: PGK (Reviewer's Initials

)DOCUMENT NAME: G:\DRP\BRANCH 4\2006 EOC\2007 SSES AA Meeting Summary Rev 0.wpd After declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copywith attachment/enclosure " N" = No copyOFFICERI/DRPRI/DRP NAMER. FuhrmeisterP. KrohnDATE05/24/0705/24/07OFFICIAL RECORD COPYML071440370