ML17340A858

From kanterella
Revision as of 15:29, 14 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Review Comments from State of Fl Dept of Environ Regulation on Des Re Steam Generator Repair at Facilities. During Preparation of Fes for Project,Encl Comments Should Be Considered & Responded to Accordingly
ML17340A858
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/10/1981
From: KOLB W O
FLORIDA, STATE OF
To: VARGA S A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0743, RTR-NUREG-743 NUDOCS 8103190700
Download: ML17340A858 (8)


Text

,REGULAT INFORMATION DISTRIBUTION,.STEM (RIDS)ACCESSION NBR'81 03190700 DOC~DATE~81/03/10,, NOTARIZED~NO DOCKET FACIL:50 250 Turkey Point'lantg Unit 3i Flor ida Power and Light C 05000250 50-251 Turkey Point Pl anti Uni.t 4p Florida Power and Light C 05000?51 AUTH'AME AUTHOR AFFILIATION J(OLB i N.0~F 1 o r i da i S t a t e o f R E C I P~NAME"'E C I P I E'N T A F F I L'I A T I 0 N VARGAiS~AD Operating Reactors Branch 1

SUBJECT:

Forwards review comments from Dept of Environ Regulation on=-DES re steam generator repair at facilities;During preparation of FES for projecticomments should be considered 8 responded to accordingly.

OISTRISUTION COOERS COORS COPIES RECEIVES:LTR

$ENCL t, SIZEig TITLE: Environs Comments.NOTES: RECIPIENT ID CODE/NAME ACTION'ARGA z S~17 INTERNAL~ACC IDNT EVAL BR.ENV ENG BR 09 HYDRO GEO BR NRC PDR 02", RAD ASSFSSMT BR SIT ANAL BR 10 COPIES LTTR ENCL 7 7 1 1 1 1 1 1 1 1 1 , RECIPIENT ID CODE/NAME GROTENHUISPM 05 EF TREAT SYS BR HYD/GEO BR ILE 07 REG F IL 01 ANCE BR COPIES LTTR ENCL 1 1 1 1 1 1 2 2 1 0 1 1 1 1 EXTERNAL'CRS NATL LAB 1 0 5 5 LPDR NSIC 03 04 1 1 1 1 TOTAL NUMBER'F COPIES REQUIRED;LTTR 29 ENCL 27 r 0"I tl gE 3 F 1~'/HE jy~'V'~o Ol 0~g STATE OF FLORIDA ffire af tiie IIatmrnar THE CAPITOL TALLAHASSEE 32301 BOn GRAiiAM GOVERNOR March 10, 1981 Steven A.Varga, Chief Operating Reactors Branch Ill Division of Licensing U.S.Nuclear Regulatory Commission t(ashington, D.C.20555 IItnR lf 8 7891 CI u,S, te ctrAR RtootA~'gC P s'I1

Dear Mr.Varga:

This Office, as required by the Office of Management and Budget Circular A-95 and Council of Environmental Quality guidelines, and functioning as the State planning and development clearinghouse, has reviewed and coordinated a review of your agency's Draft Environmental Statement Related to Steam Generator Repair at Turkey Point Plant Units 3 and 4 (SAI 81-0926E).

Copies of this document were sent to the Departments of Commerce, Environ-mental Regulation, Natural Resources, State, Veteran and Community Affairs, the Game and Fresh Water Fish Commission, and the Florida Public Service Commission.

Attached for your consideration are review comments from the Department of Environmental Regulation.-.During the preparation of your.final environ-mental statement for this project, these comments should be considered and responded to accordingly.", P Thank you for the opportunity to review this document.Sincerely, I'olb Sr.Governmental AnalystÃK/mew Attachment cc: Hamilton S.Oven SX03 ZQOPoo An Affirmative Action/Equal Opportunity Employer lq E~P 11 I f lf f~f r i~" f q~ngJ TWIN TOWERS OFFICE BUILDING 2600 BLAIR STONE ROAD TALLAHASSEE, FLORIDA 32301~r m ROr~+~FDdlP FEB I S.1901 EMU K BOB GRAHAM GOVERNOR JACOB D.YARN SECRETARY STATE'0 F F LOR t DA DEPARTMENT OF ENYO ROHMENTAL REGULATION/

Februa r y 3, 1981 Nr, Ron Fahs, Director Intergovernmental Coordination State Planning and Development Clearinghouse Office of the.Governor The Capitol Tal 1 ahassee, Fl ori da 32301

Dear Nr.Fahs:

GOY"R"'" Jr"-"" R Re: Draft Environmental Statement, NVREG-0743, Steam Generator Repai'r at Turkey Point Units 3 and 4, SAI No.: 81-0926E I have reviewed the DES for the steam generator repairs at FPL's Turkey Point nuclear units.The following comments are offerred: l.On page 4-12, section 4.1.2.6, there is a phrase or sentences missing between the last line of page 4-12, and page 4-13.2.The estimates of alternate disposal methods in sections 4.1.2.3 an 5.5 ignores the quota on volume of low level wastes being imposed'at Barnw@l, South Carolina.The immediate intact ship-ment or.immediate cut-up and shipment to Barnwell'may not be allowed by Chem Nuclear Systems, Inc.Shipment to Beatty Nevada, or Hanford, t<ashington isn't practical.

Costs of shipment by truck or rail to those places probably haven't been considered.

3.FPL's estimates of replacement power costs may be biased exceptionally high, if they considered only peaking units (combustion turbines)'as the source of power and ignore the original Iypcd on 100%rccyclcd paper 4J JM ls Nr, Fahs Page Two February-3, 1981 purchase of coal fired capacity or coal based generation or FPL is arranging to do.HSOjr:my cc: John Outland Sincerely,'5 8~/m Hamilton S.Oven, Jr., P.E.Adminstrator Power Plant Siting Section k t