Forwards Rev 34 to Turkey Point Radiological Emergency Plan & Rev 2 to Recovery Plan.Change Summary Included
ML17354A943
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/22/1998
From: HOVEY R J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17354A944 List:
References
L-98-126, NUDOCS 9806010023
Download: ML17354A943 (7)


Text

CATEGORY j.REGULATE Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9806010023 DOC.DATE: 98/05/22 NOTARIZED:

NO DOCKET¹FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and, Light C 05000251 AUTH.NAME AUTHOR AFFILIATION wA~D eyKmr I>+HOVEY,R.J.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION S~Document Control Branch (Document Control Desk)~

SUBJECT:

Forwards rev 34 to Turkey Point rradiological emergency planP~C rev 2 to recovery plan.Change summary included..

A DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR ENCL l SIZE: TITLE: OR Submittal:

Emergency Preparedness Plans, Implement'g Procedures, Cp NOTES: RECIPIENT ID CODE/NAME PD2-3 LA JABBOUR,K COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1 E 0 INTERNAL: AEOD/HAGAN, D NRR/DRPM/PERB EXTERNAL: NOAC 1 1 IL~ERR'1 1 1 OC~BSTRACT NRC PDR 2 2 1 1 1 1 Vs+Pj~'R D E N NOTE TO ALL DRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 J

L-98-126 10 CFR 50.54(q)10 CFR 50, Appendix E U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Radiolo ical Emer enc Plan-Revision 34 and Recove Plan-Revision 02 Florida Power anti Light Company (FPL)has issued Revision 34 to the Turkey Point Radiological Emergency Plan, and Revision 02 to the Turkey Point Recovery Plan.FPL has determined that the revisions do not decrease the eA'ectiveness of the Plans.Attached is a description of the changes to each of the two Plans.Pursuant to 10 CFR 50.54 (q), enclosed is one copy of each of the Plans.Should there be any questions, please contact us.Very truly yours, R.J.Hovey Vice President Turkey Point Plant CLM attachment enclosure cc: Regional Administrator, Region II, USNRC (2 copies)Senior Resident Inspector, USNRC, Turkey Point Plant (no enclosure) 98060iOOM 980522 Q PDR ADQCK 05000250 t Dog an FPL Group company

L-98-126 ATTACFlM ENT Page 1 of 2 The following is a summary of the changes incorporated into Revision 34 of the Turkey Point Radiological Emergency Plan.These changes incorporate the results of Evaluation PTN-ENG-SENS-97-088, Revision 1, titled,"Engineering Evaluation Related to Pre-Planned Alternative Monitoring for the Containment High Range Radiation Monitors (CHRRMs)," as well as reflecting organizational changes afFecting the Emergency Preparedness program.There were no areas of reduced e6ectiveness identified in this revision.Cha ter 2-Or anization Facilities and Su ort Services Page 2-11 Figure 2-3.The Turkey Point Plant Normal Operating Organization was revised to show the current organizational structure.

Page 2-13 The description of responsibilities for the Services Manager was changed to show the responsibilities of the Protection Services Manager.Cha ter 3-Emer enc Classification S stem Page 3-24 Table 3-3;a statement was added in the CHRRMs section indicating that a representative reading can be obtained by using the pre-planned alternate method if both CHRRMs are inoperable.

Cha ter 7-Maintainin~

Emer enc Pre aredness Generic Change-Changed"Services Manager" to read"Protection Services Manager," throughout.

Page 7-10 Section 7.3.2, Re>>ieiv Procedwv,, was reworded to clarify the process for review of the Emergency Plan and the Emergency Plan Implementing Procedures.

I 98-126 ATTACHMENT Page 2 of 2 The following is a summary of the changes incorporated into Revision 02 of the Turkey Point Recovery Plan.The changes are organizational or administrative in nature, and do not represent a decrease in the effectiveness of the Recovery Plan or the Emergency Plan.G The revision date at the bottom of each page of the document is being changed to revision number, to be consistent with the format of the Emergency Plan.The Emergency Response position, where it had previously been omitted, has been added after the normal position title throughout the document.Clarifications and editing changes.~g A reference has been added to the Severe Accident Management Guidelines (SAMG's).The Organization chart has been edited as follows: the Services Manager, the Security Supervisor, and the Manager, Nuclear Human Resources positions have been deleted.The Emergency Security Manager has been added to the chart under the Site Vice President (Recovery Manager).The Services Manager responsibilities have been deleted., The responsibilities previously assigned to the Security Supervisor (Emergency Security Manager)are now assigned to the Emergency Security Manager.The responsibilities previously assigned to the Manager, Nuclear Human Resources (Juno Beach)are now assigned to the Human Resources Manager (onsite).A step has been added to the Health Physics Supervisor's responsibilities to perform"what if'alculations, as necessary, e.g., what type of release would occur if a pump shuts down, what would happen if containment re-pressurizes.

A statement has been added under the OSC Supervisor's responsibilities for the use of personnel from other departments, as necessary.

Attachment 4, Off-site Post-hurricane Checklist changes:-Statement added to complete applicable sections, as required, by damage from the storm.-EBS changed to EAS throughout checklist.

-County Manager's OAice changed to County Mayor's Office.-DHRS changed to Department of Health throughout checklist.

.