Category:Inspection Plan
MONTHYEARIR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 IR 05000335/20220062023-03-0101 March 2023 Annual Assessment Letter for St. Lucie Units 1 & 2 (Report 05000335/2022006 and 05000389/2022006) ML23030A2412023-01-31031 January 2023 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000335/2023401; 05000389/2023401 ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML22238A0782022-08-26026 August 2022 Updated Inspection Plan for St Lucie Units 1 & 2 - Report 05000335/2022005 and 05000389/2022005 ML22075A1212022-03-16016 March 2022 Stl Problem Identification and Resolution (Pi&R) Information Request Final Report IR 05000335/20210062022-03-0202 March 2022 Annual Assessment Letter for St. Lucie, Units 1 & 2 (Report No. 05000335/2021006 and 05000389/2021006) IR 05000335/20210052021-08-25025 August 2021 Updated Inspection Plan for St. Lucie Plant Units 1 & 2 (Report 05000335/2021005 and 05000389/2021005) IR 05000335/20200062021-03-0303 March 2021 Annual Assessment Letter for St. Lucie Nuclear Plant, Unit 1 and Unit 2 Report 05000335/2020006 and 05000389/2020006 ML20324A1122020-11-19019 November 2020 Emergency Preparedness Program Inspection Request for Information IR 05000335/20200052020-08-24024 August 2020 Updated Inspection Plan for St. Lucie Plant, Unit 1 and 2 (Report 05000335/2020005 and 05000389/2020005) ML20085H6692020-03-25025 March 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19339H0272019-12-0505 December 2019 EP Exercise Inspection RFI IR 05000335/20190052019-08-27027 August 2019 Updated Inspection Plan for St. Lucie Plant, Unit 1 and Unit 2 - (Report 05000335/2019005 and 05000389/2019005) ML19218A2742019-08-0606 August 2019 Notification of Inspection and Request for Information ML19071A0902019-03-12012 March 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U. S. Nuclear Regulatory Commission Inspection Report Nos. 05000335/2019011 and 05000389/2019011 IR 05000335/20180062019-03-0404 March 2019 Annual Assessment Letter for St. Lucie Plant, Unit 1 and 2 - Report 05000335/2018006 and 05000389/2018006, Report 05000335/2018402 and 05000389/2018402, Report 05000335/2018501 and 05000389/2018501 ML18304A1872018-10-31031 October 2018 Notification of St. Lucie Plant Design Bases Assurance Inspection (Team) - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2019010 and 05000389/2019010 IR 05000335/20180052018-08-23023 August 2018 Updated Inspection Plan for St. Lucie Plant, Units 1 and 2 (Report 05000335/2018005 and 05000389/2018005) IR 05000335/20170062018-02-28028 February 2018 Annual Assessment Letter for St. Lucie Nuclear Plant, Unit 1 and Unit 2 - Report 05000335/2017006 and 05000389/2017006, Report 05000335/2017402 and 05000389/2017402, Report 05000335/2017501 and 05000389/2017501 IR 05000335/20170052017-08-22022 August 2017 Updated Inspection Plan for St. Lucie Plant, Units 1 and 2 (IR 05000335/2017005 and 05000389/2017005) IR 05000335/20160062017-03-0101 March 2017 Annual Assessment Letter for Saint Lucie Nuclear Plant, Units 1 and 2 (Report 05000335/2016006 and 05000389/2016006) IR 05000335/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Saint Lucie Nuclear Plant, Unit 1 and Unit 2 - NRC Inspection Report 05000335/2016005 and 05000389/2016005 ML16222B0142016-08-0808 August 2016 Notification of Inspection and Request for Information ML16064A0032016-03-0303 March 2016 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML16062A2562016-03-0202 March 2016 Annual Assessment Letter ML16054A0732016-02-18018 February 2016 Notification of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 05000335/2016011 and 05000389/2016011) ML15281A0502015-10-0707 October 2015 IR 05000335/2016008 and 05000389/2016008 - 02/08/2016 - 02/12/2016 and 02/29/2016 - 03/04/2016 - Notification of St. Lucie Plant Component Design Bases Inspection IR 05000335/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for St. Lucie Plant Unit 1 and Unit 2 (Report 05000335/2015005 and 05000389/2015005) L-2015-218, Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request No. 10, Revision 02015-08-27027 August 2015 Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request No. 10, Revision 0 IR 05000335/20140012015-03-0404 March 2015 Annual Assessment Letter for St. Lucie Plant Unit 1 and Unit 2, (Report 05000335/2014001 and 05000389/2014001) L-2014-298, Inservice Inspection Plan - RAI Response - Third Ten-Year Interval Unit 2 Relief Request No. 162014-09-24024 September 2014 Inservice Inspection Plan - RAI Response - Third Ten-Year Interval Unit 2 Relief Request No. 16 ML14245A1842014-09-0202 September 2014 Mid-Cycle Ltr 2014 IR 05000335/20130012014-03-0404 March 2014 Annual Assessment Letter for St Lucie Plant Unit 1 and Unit 2 (Report 05000335/2013001 and 05000389/2013001) ML13305A3362013-11-0101 November 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML13246A0542013-09-0303 September 2013 Mid-Cycle Assessment Letter ML13241A1032013-08-28028 August 2013 Notification of Inspection and Request for Information ML13219B1352013-08-0606 August 2013 Cyber Security Notification Letter ML13164A3182013-06-12012 June 2013 Requalification Program Inspection - St. Lucie Nuclear Plant IR 05000335/20120012013-03-0404 March 2013 Annual Assessment Letter for St. Lucie Nuclear Plant, Unit 1 and Unit 2 (Report 05000335/2012001 and 05000389/2012001) ML12349A0382012-12-10010 December 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000335-13-007 & 05000389-13-007) ML12248A3232012-09-0404 September 2012 Mid Cycle Letter ML1206502402012-03-0505 March 2012 EOC Report 22 ML1124403312011-09-0101 September 2011 Report 22 - Saint Lucie ML1106301412011-03-0404 March 2011 Inspection/Activity Plan, Report 22 ML1024408762010-09-0101 September 2010 Report 22 - 2010 Mid Cycle ML1006208302010-03-0303 March 2010 Inspection/Activity Plan 03/01/2010 - 06/30/2011 ML0924404612009-09-0101 September 2009 Inspection/Activity Plan, Report 22, 09/01/2009 - 12/31/2010 ML0906304862009-03-0404 March 2009 EOC Report. 22, Inspection Plan ML0824605882008-09-0202 September 2008 Report 22 - Inspection/Activity Plan 08/01/08 - 12/31/09 2024-08-22
[Table view] Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda 2024-09-09
[Table view] |
See also: IR 05000335/2008001
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931
March 3, 2008
Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President
Nuclear and Chief Nuclear Officer P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT: ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT (NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)
Dear Mr. Stall:
On February 7, 2008, the NRC staff completed its performance review of the St. Lucie Nuclear
Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of
this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only--Security Information" will include
the security cornerstone review and resultant inspection plan.
Overall, St. Lucie operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first
three quarters of the assessment cycle, was within the Licensee Response column of the NRC
=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC
oversight (Green). Therefore, we plan to condu
ct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and TI 2515/172, Reactor Coolant System Dissimilar Metal.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and
continuous nature. The inspections in the last nine months of the inspection plan are tentative
and may be revised at the mid-cycle review.
FP&L 2 In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/ Marvin D. Sykes, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Docket Nos.: 50-335, 50-389
License Nos.: DPR-67, NPF-16
Enclosure: St. Lucie Inspection/Activity Plan (03/01/08 - 09/30/09)
cc w/encl: (See page 3)
Distribution:
Normal distribution list
_________________________ OFFICE RII:DRP RII:DRP SIGNATURE MDS1 JDH4 NAME MSykes JHamman DATE 03/03/2008 03/03/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
FP&L 3 cc w/encl:
Gordon L. Johnston
Site Vice President
St. Lucie Nuclear Plant Electronic Mail Distribution
Christopher R. Costanzo
Plant General Manager
St. Lucie Nuclear Plant Electronic Mail Distribution
Bill Parks
Operations Manager
St. Lucie Nuclear Plant Electronic Mail Distribution
Terry L. Patterson
Licensing Manager
St. Lucie Nuclear Plant Electronic Mail Distribution
Rajiv S. Kundalkar
Vice President
Nuclear Technical Services
Florida Power & Light Company Electronic Mail Distribution
Don E. Grissette
Vice President
Nuclear Training and Performance Improvement
Florida Power & Light Company
Electronic Mail Distribution
Seth B. Dunston
Training Manager
St. Lucie Nuclear Plant Electronic Mail Distribution
M. S. Ross
Managing Attorney
Florida Power & Light Company Electronic Mail Distribution
Marjan Mashhadi
Senior Attorney
Florida Power & Light Company Electronic Mail Distribution
William A. Passetti Bureau of Radiation Control
Department of Health Electronic Mail Distribution
Craig Fugate
Director
Division of Emergency Preparedness
Department of Community Affairs Electronic Mail Distribution
J. Kammel
Radiological Emergency Planning
Administrator Department of Public Safety Electronic Mail Distribution
Douglas Anderson
County Adminstrator
St. Lucie County
2300 Virginia Avenue
Ft. Pierce, FL 34982
Mano Nazar
Senior Vice President and Nuclear Chief Operating Officer
Florida Power & Light Company
Electronic Mail Distribution
FP&L 4 Letter to J. A. Stall from Marvin D. Sykes dated March 3, 2008.
SUBJECT: ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT (NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)
Distribution w/encl:
C. Evans, RII (Part 72 Only)
L. Slack, RII
OE Mail (email address if applicable)
INPO ROP Reports
RIDSNRRDIRS
PUBLIC
B. Mozafari, NRR
Saint Lucie
Inspection / Activity Plan
03/01/2008
-02/28/2009
Inspection
Type Inspection Activity
Planned Dates
Start End
No. of Staff
on Site Title Unit Number Page 1 of 2
03/03/2008
11:35:06 Report 22 1 PI&R-PREP TRIP-PROBLEM ID AND RESOL
Baseline Inspections
Identification and Resolution of Problems
05/26/2008
05/30/2008
1, 2 71152B IP 3 OL EXAM-INITIAL EXAM PREP
Not Applicable
ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES
06/30/2008
07/03/2008
1 V23284 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION
Baseline Inspections
Identification and Resolution of Problems
07/07/2008
07/11/2008
1, 2 71152B IP Baseline Inspections
Identification and Resolution of Problems
07/21/2008
07/25/2008
1, 2 71152B IP 3 OL EXAM-INITIAL EXAM
Not Applicable
ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES
07/21/2008
08/01/2008
1 V23284 1 PSB1-RP-RADIATION PROTECTION PREINSPECTION VISIT
Baseline Inspections
A ccess Control to Radiologically Significant Areas
08/11/2008
08/13/2008
1, 2 7112101 IP 3 TI-171-B.5.B PHASE 2&3
Generic Safety Inspecti
o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies
08/25/2008
08/29/2008
1, 2 2515/171 IP 4 PSB1-RP-RADIATION PROTECTION PUBLIC BASELINE
Baseline Inspections
A ccess Control to Radiologically Significant Areas
09/08/2008
09/12/2008
1, 2 7112101 IP Baseline Inspections
Radiation Monitoring Instrumentation and Protective Equipment
09/08/2008
09/12/2008
1, 2 7112103 IP Baseline Inspections
Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
09/08/2008
09/12/2008
1, 2 7112201 IP Baseline Inspections
Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program
09/08/2008
09/12/2008
1, 2 7112203 IP Baseline Inspections
Occupational Exposure Control Effectiveness
09/08/2008
09/12/2008
1, 2 71151-OR01
IP Baseline Inspections
RETS/ODCM Radiological Effluent
09/08/2008
09/12/2008
1, 2 71151-PR01
IP 1 EB3ISI-U1 ISI Baseline Inspections
Inservice Inspection Activities - PWR
10/13/2008
10/17/2008
1 7111108P IP 1 EB3SGISI-UNIT 1 SGISI
Baseline Inspections
Inservice Inspection Activities - PWR
10/20/2008
10/24/2008
1 7111108P IP 1 EB3TI172-TI-172 Generic Safety Inspecti
o Reactor Coolant System Dissimiliar Metal Butt Welds
11/17/2008
11/21/2008
1, 2 2515/172 IP 7 STL TFPI-TFPI INSP Baseline Inspections
Fire Protection-NFPA 805 Transition Period [Triennial]
01/26/2009
01/30/2009
1, 2 7111105P IP Baseline Inspections
Fire Protection-NFPA 805 Transition Period [Triennial]
02/09/2009
02/13/2009
1, 2 7111105P IP 1 PSB1EP-EP INSP EP Baseline Inspection
A lert and Notification System Testing
02/09/2009
02/13/2009
1, 2 7111402 IP EP Baseline Inspection
Emergency Response Organization Augmentation Testing
02/09/2009
02/13/2009
1, 2 7111403 IP EP Baseline Inspection
Emergency Action Level and Emergency Plan Changes
02/09/2009
02/13/2009
1, 2 7111404 IP EP Baseline Inspection
Correction of Emergency Preparedness Weaknesses and Deficiencies
02/09/2009
02/13/2009
1, 2 7111405 IP Baseline Inspections
Performance Indicator Verification
02/09/2009
02/13/2009
1, 2 71151 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Saint Lucie
Inspection / Activity Plan
03/01/2008
-02/28/2009
Inspection
Type Inspection Activity
Planned Dates
Start End
No. of Staff
on Site Title Unit Number Page 2 of 2
03/03/2008
11:35:06 Report 22 1 PSB1-RP-RADIATION PROTECTION PREINSPECTION VISIT
Baseline Inspections
A ccess Control to Radiologically Significant Areas
02/23/2009
02/25/2009
1, 2 7112101 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.