ML080850155

From kanterella
Revision as of 13:21, 30 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Susquehanna Steam Electric Station - Units 1 & 2 - Summary of March 18, 2008, Meeting with PPL Susquehanna, on Submission Details for Susquehanna Units and 2, Pose-Extended Power Uprate (EPU) Power Ascension (Tac No. MD8079)
ML080850155
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/26/2008
From: Bhalchandra Vaidya
NRC/NRR/ADRO/DORL/LPLI-1
To:
Susquehanna
vaidya B K, NRR/DLPM, 415-3308
Shared Package
ML080850177 List:
References
TAC MD8079
Download: ML080850155 (4)


Text

March 26, 2008

LICENSEE: PPL SUSQUEHANNA, LLC

FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MARCH 18, 2008, MEETING WITH PPL SUSQUEHANNA, ON SUBMISSION DETAILS FOR SUSQUEHANNA UNITS 1 AND 2, POST- EXTENDED POWER UPRATE (EPU) POWER ASCENSION (TAC NO. MD8079)

On March 18, 2008, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of PPL Susquehanna (PPL) to discuss PPL's plan for complying with the extended power uprate (EPU) Steam Dryer License Conditions. A list of attendees is enclosed.

The licensee's presentation included Proprietary Information (See Agencywide Documents Access and Management System (ADAMS) Accession No. ML080810346 for Proprietary version and ADAMS Accession No. ML080810339 for Non-Proprietary version).

The licensee provided details regarding the new steam dryer design features, locations, and types of instrumentation to be used, additional analyses needed to reflect the new dryer as-built configuration, and the format and logistics for data submission during the power ascension phase. The licensee also discussed an ongoing steam dryer modification to correct the interference issue they recently encountered with the new Unit 1 Steam Dryer.

With the verbal consent of the owners of the Proprietary Information, PPL, and General Electric - Hitachi, the members of the public were in attendance throughout the meeting. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.

/RA/ Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-387 and 50-388

Enclosure:

List of Attendees

cc w/encl: See next page Susquehanna Steam Electric Station, Unit Nos. 1 and 2

cc:

Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467

Robert M. Paley General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467

Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179

Supervisor -

Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467

Michael H. Crowthers Supervisor - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179

Ronald E. Smith General Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467

Michael H. Rose Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467

Joseph J. Scopelliti Community Relations Manager,

Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179

Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179

Richard W. Osborne Allegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266

Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469

Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035

Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035

Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803

Mr. Britt T. McKinney Sr. Vice President & CNO PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603 Enclosure MEETING ATTENDANCE LIST MARCH 18, 2008 EXTENDED POWER UPRATE (EPU)

POST EPU POWER ASCENSION SUSQUEHANNA, UNITS 1 AND 2 Name Organization Bhalchandra K. Vaidya NRC/NRR/DORL Mark Kowal NRC/NRR/DORL Kamal Manoly NRC/NRR/EMCB Mark Hartzman NRC/NRR/EMCB Chakrapani Basavaraju NRC/NRR/EMCB Richard Guzman NRC/NRR/DORL Zena Abdullahi NRC/ACRS Richard Pagodin PPL SUSQUEHANNA John Bartos PPL SUSQUEHANNA John Krais PPL SUSQUEHANNA Michael Crowthers PPL SUSQUEHANNA Robert Sheranko PPL SUSQUEHANNA Enrico J. Betti GE HITACHI Lance Hubbard (*) ALLEGHENY ELECTRIC COOPERATIVE Brad Fuller (*) COMMONWEALTH OF PENNSYLVANIA

(*) Members of the Public.

ML080810339 for Non-Proprietary version).

The licensee provided details regarding the new steam dryer design features, locations, and types of instrumentation to be used, additional analyses needed to reflect the new dryer as-built configuration, and the format and logistics for data submission during the power ascension phase. The licensee also discussed an ongoing steam dryer modification to correct the interference issue they recently encountered with the new Unit 1 Steam Dryer.

With the verbal consent of the owners of the Proprietary Information, PPL, and General Electric - Hitachi, the members of the public were in attendance throughout the meeting. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.

/RA/ Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-387 and 50-388

Enclosure:

List of Attendees

cc w/encl: See next page

DISTRIBUTION PUBLIC LPL1-1 r/f RidsAcrsAcnw&mMailCenter RidsNrrDorlLpl1-1 RidsNrrPmBVaidya RidsNrrLASLittle RidsNrrLAGLappert RidsOgcRp RidsNrrOd RidsNrrDeEmcb RidsRgn1MailCenter ADAMS Accession No. PKG: ML080850177, Mtg Notice: ML080630382, Mtg Summary ML080850155 NRC-001 OFFICE LPLI-1/PM LPL4/LAiT LPLI-1/LA LPLI-1/BC NAME BVaidya GLappert SLittle MKowal DATE 3/26/08 3/26/08 3/26/08 3/26/08