Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML0805702242008-03-0404 March 2008 Request for Withholding Information from Public Disclosure.9) Project stage: Withholding Request Acceptance ML0805304042008-03-0404 March 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0806303822008-03-0505 March 2008 Notice of Meeting with PPL Susquehanna, LLC (PPL) to Discuss Ppl'S Plan Regarding Compliance with the License Conditions Related to the New Steam Dryer During Extended Power Uprate Power Ascension for the Upcoming Refueling Outage Project stage: Request ML0808605052008-03-20020 March 2008 MD8079 - Susquehanna 1 and 2 - Meeting on March 18, 2008, Affidavit for Proprietary Presentation Material Project stage: Meeting ML0808501552008-03-26026 March 2008 Units 1 & 2 - Summary of March 18, 2008, Meeting with PPL Susquehanna, on Submission Details for Susquehanna Units and 2, Pose-Extended Power Uprate (EPU) Power Ascension (Tac No. MD8079) Project stage: Meeting ML0808701732008-04-0404 April 2008 Request for Withholding Information from Public Disclosure for Presentation Material for the Public Meeting on March 18, 2008 Project stage: Withholding Request Acceptance ML0810000872008-04-14014 April 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0810801632008-04-24024 April 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0813706392008-06-0909 June 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0829004322008-10-21021 October 2008 Response to Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0906306842009-03-18018 March 2009 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2008-03-05
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A1252024-10-22022 October 2024 – Authorized Alternative to Requirements of the ASME OM Code PLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) 05000387/LER-2024-001, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-01-0909 January 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) 2024-09-06
[Table view] Category:Proprietary Information Review
MONTHYEARML22311A0532022-11-0909 November 2022 Request for Withholding Information from Public Disclosure ML22307A1652022-11-0909 November 2022 Request for Withholding Information from Public Disclosure ML22041A4412022-03-0303 March 2022 Request for Withholding Information from Public Disclosure ML16215A0082016-08-26026 August 2016 Request for Withholding Information from Public Disclosure ML15043A1622015-03-18018 March 2015 Request for Withholding Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 ML15006A3992015-01-13013 January 2015 Request for Withholding Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2, ML12248A0932012-10-0202 October 2012 Request for Withholding Information from Public Disclosure for Susquehanna Steam Electric Station ML11291A0512011-10-27027 October 2011 Request for Withholding Information from Public Disclosure ML1021501892010-08-19019 August 2010 ME3451, Letter-Proprietary Information Determination Finding for Dryer Data @ 107%, 110.5%, PLA-6612, and PLA-6633 ML0921603112009-08-0606 August 2009 ME0772, Proprietary Information Determination Letter PLA-6542 Request for Withholding Proprietary Information from Public Disclosure ML0921000032009-08-0505 August 2009 Request to Withhold Proprietary Information from Public Disclosure ML0913803392009-05-22022 May 2009 ME0772, Proprietary Information Determination Letter, PLA-6510 - Encl 1, M. S. Line Limit Curve Adjustment During Power Ascension ML0906306842009-03-18018 March 2009 Request for Withholding Information from Public Disclosure ML0835101402008-12-23023 December 2008 Request for Withholding Information from Public Disclosure Susquehanna Steam Electric Station, Unit 1 ML0829004322008-10-21021 October 2008 Response to Request for Withholding Information from Public Disclosure ML0813706392008-06-0909 June 2008 Request for Withholding Information from Public Disclosure ML0810801632008-04-24024 April 2008 Request for Withholding Information from Public Disclosure ML0810000872008-04-14014 April 2008 Request for Withholding Information from Public Disclosure ML0808701732008-04-0404 April 2008 Request for Withholding Information from Public Disclosure for Presentation Material for the Public Meeting on March 18, 2008 ML0805304042008-03-0404 March 2008 Request for Withholding Information from Public Disclosure ML0805702242008-03-0404 March 2008 Request for Withholding Information from Public Disclosure.9) ML0703201422007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 ML0703201532007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 ML0532606012005-11-14014 November 2005 Submittal of BWRVIP-145: BWR Vessel and Internals Project, Evaluation of Susquehanna Unit 2 Top Guide and Shroud Using RAMA Fluence Methodology, EPRI Technical Report 1011694, October 2005 ML0219605232002-08-0101 August 2002 Request for Withholding Information from Public Disclosure ML0212905232002-05-17017 May 2002 Request for Withholding Information from Public Disclosure ML18024A1671978-03-30030 March 1978 Letter Regarding Transmittal of Physical Security Plan and Attaching a Note to NRC And/Or Local Public Document Rooms 2022-03-03
[Table view] |
Text
June 9, 2008 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467
SUBJECT:
PPL SUSQUEHANNA - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 (TAC NO. MD8079)
Dear Mr. McKinney:
By letter dated May 15, 2008, PPL Susquehanna, LLC, submitted the following two affidavits:
- 1. Executed by Mr. Richard E. Kingston, Vice President, Methods Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas LLC (GEH), dated April 30, 2008, and
- 2. Executed by Richard D. Pagodin, General Manager, Nuclear Engineering, PPL Susquehanna, LLC, dated May 1, 2008.
Both affidavits requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Section 2.390:
Enclosure 1 to the letter from PPL Susquehanna (Mr. B. T. McKinney, Senior Vice President and Chief Nuclear Officer), PLA-6358, dated May 15, 2008, 102992-PPL-381591-C-001, SSES Replacement Dryer Test Condition 1.I Results.
The affidavit from Mr. Kingston of GEH stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; The affidavit from Mr. Pagodin from PPL stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
B. McKinney 7. The information identified . . . is classified as proprietary because it details the results of test data derived from test instrumentation installed specifically to collect this data. This instrumentation was installed at a significant cost to PPL.
The data and the conditions under which it was collected constitute a major PPL asset.
- 8. Public disclosure of the information sought to be withheld is likely to cause substantial harm to PPL by foreclosing or reducing the availability of profit-making opportunities. The information is of value to other BWR Licensees and would support [their] evaluations and analyses associated with extended power uprate license amendment submittals. Making this information available to other BWR Licensees would represent a windfall and deprive PPL the opportunity to recover a portion of its large investment in test instrumentation from which this data is derived.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
A nonproprietary copy of this document has been placed in the NRCs Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
B. McKinney If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely,
/ra/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-387 cc: See next page
ML081370639 OFFICE NRR/LPL1-1/PM NRR/LPL1-1/LA NRR/DE/EMCB/BC NRR/LPL1-1/BC NAME BVaidya SLittle KManoly MKowal DATE 6/9/08 6/9/08 6/9/08 6/9/08 Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
Cornelius J. Gannon Joseph J. Scopelliti Vice President - Nuclear Operations Community Relations Manager, PPL Susquehanna, LLC Susquehanna 769 Salem Blvd., NUCSB3 PPL Susquehanna, LLC Berwick, PA 18603-0467 634 Salem Blvd., SSO Berwick, PA 18603-0467 Robert M. Paley General Manager - Plant Support Bryan A. Snapp, Esq PPL Susquehanna, LLC Assoc. General Counsel 769 Salem Blvd., NUCSB2 PPL Services Corporation Berwick, PA 18603-0467 Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs Document Control Services PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Allentown, PA 18101-1179 Supervisor - Richard W. Osborne Nuclear Regulatory Affairs Allegheny Electric Cooperative, Inc.
PPL Susquehanna, LLC 212 Locust Street 769 Salem Blvd., NUCSA4 P.O. Box 1266 Berwick, PA 18603-0467 Harrisburg, PA 17108-1266 Michael H. Crowthers Director, Bureau of Radiation Protection Supervisor - Nuclear Regulatory Affairs Pennsylvania Department of PPL Susquehanna, LLC Environmental Protection Two North Ninth Street, GENPL4 Rachel Carson State Office Building Allentown, PA 18101-1179 P.O. Box 8469 Harrisburg, PA 17105-8469 Ronald E. Smith General Manager - Site Preparedness Senior Resident Inspector and Services U.S. Nuclear Regulatory Commission PPL Susquehanna, LLC P.O. Box 35, NUCSA4 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0035 Berwick, PA 18603-0467 Regional Administrator, Region 1 Michael H. Rose U.S. Nuclear Regulatory Commission Manager - Quality Assurance 475 Allendale Road PPL Susquehanna, LLC King of Prussia, PA 19406 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035
Susquehanna Steam Electric Station, Unit Nos. 1 and 2 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State Collge, PA 16803 Mr. Richard E. Kingston, Vice President, Methods Licensing, GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Mr. Richard D. Pagodin, General Manager, Nuclear Engineering, PPL Susquehanna, LLC, 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467