Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-85-395, Monthly Operating Repts for Sept 1985 | 30 September 1985 | Monthly Operating Repts for Sept 1985 | |
L-85-434, Monthly Operating Repts for Oct 1985 | 31 October 1985 | Monthly Operating Repts for Oct 1985 | |
L-85-460, Monthly Operating Repts for Nov 1985 | 30 November 1985 | Monthly Operating Repts for Nov 1985 | |
L-86-161, Monthly Operating Repts for Mar 1986 | 31 March 1986 | Monthly Operating Repts for Mar 1986 | |
L-86-252, Monthly Operating Repts for May 1986 | 31 May 1986 | Monthly Operating Repts for May 1986 | |
L-86-292, Monthly Operating Repts for June 1986 | 30 June 1986 | Monthly Operating Repts for June 1986 | |
L-86-424, Monthly Operating Repts for Sept 1986 | 30 September 1986 | Monthly Operating Repts for Sept 1986 | |
L-86-465, Monthly Operating Repts for Oct 1986 | 31 October 1986 | Monthly Operating Repts for Oct 1986 | |
L-86-506, Monthly Operating Repts for Nov 1986 | 30 November 1986 | Monthly Operating Repts for Nov 1986 | |
L-87-167, Monthly Operating Repts for Mar 1987 | 31 March 1987 | Monthly Operating Repts for Mar 1987 | Boric Acid |
L-87-214, Monthly Operating Repts for Apr 1987 | 30 April 1987 | Monthly Operating Repts for Apr 1987 | |
L-87-250, Monthly Operating Rept for May 1987 | 31 May 1987 | Monthly Operating Rept for May 1987 | |
L-87-344, Monthly Operating Repts for Jul 1987 | 31 July 1987 | Monthly Operating Repts for Jul 1987 | |
L-87-382, Monthly Operating Repts for Aug 1987 | 31 August 1987 | Monthly Operating Repts for Aug 1987 | |
L-87-421, Monthly Operating Repts for Sept 1987 | 30 September 1987 | Monthly Operating Repts for Sept 1987 | |
L-87-475, Monthly Operating Repts for Oct 1987 | 31 October 1987 | Monthly Operating Repts for Oct 1987 | |
LD-84-063, Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde | 26 October 1984 | Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde | |
ML15222A068 | 30 April 1982 | Cycle 7 Reload Rept. | Shutdown Margin |
ML15261A468 | 4 September 1998 | Safety Evaluation Supporting Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55,respectively | Safe Shutdown Probabilistic Risk Assessment Maintenance Rule Program |
ML16137A770 | 6 July 1981 | to Inservice Insp Rept for 1981 Refueling Outage | |
ML16148A311 | 5 June 1980 | LER 80-003/01T-0:on 800507,deborating Demineralizer Was Placed in Svc While Plant in Cold Shutdown & RCS Drained Down.Rcs Boron Concentration Reduced from 1,895 Ppm to 1,539 Ppm.Apparently Caused by Incorrect Chemistry Records | Shutdown Margin |
ML16148A338 | 26 June 1980 | LER 80-006/03L-0:on 800625,at 40% Full Power,Valve 2LP21 Failed to Open Electrically on Command.Caused by Loose Setscrew on Motor Driven Pinion.Screw Repaired | |
ML16148A363 | 16 October 1980 | LER 80-015/03L-0:on 800916,valve 2LP21 Failed to Open During Performance of Engineered Safeguard Channel Test.Caused by Loose Setscrew on Motor Driven Pinion.Screw Repaired | |
ML16148A381 | 12 November 1980 | LER 80-020/03L-0:on 801013,during Performance of Es on-line Test,Valve 2FDW-103 Failed to Close During Cycling.Caused by Failure of Torque Switch.Valve Manually Closed.Bad Torque Switch Replaced | |
ML16148A394 | 5 December 1980 | LER 80-024/03L-0:on 801105,HPI Pump 2B Declared Inoperable Due to High Upper Bearing Temp.Caused by Isolation of Normal Cooling Water Supply to Unit 2 HPI Pumps,Personnel Error, Equipment Malfunction & Design Deficiency | |
ML16148A396 | 3 December 1980 | LER 80-009 Has Been Cancelled | Backfit |
ML16148A405 | 30 January 1981 | LER 80-025/03L-0:on 801217,HPI Pump 2B Declared Inoperable Because Motor Indicated High Upper Bearing Temp.Caused by Personnel Error in Replacing Oil.High Bearing Temp Probably Due to Restricted Cooling Water Flow | |
ML16162A277 | 13 July 1979 | LER 79-004/03L-0 on 790615:RCS Leakage Observed & Unit Shut Down for Repairs.Caused by Leak on Packing on Pressurizer Spray Control Bypass Valve.Valve Was Backseated & Leakage Terminated | Packing leak |
ML17053D167 | 27 May 1982 | Annual Financial Rept 1981 | High winds |
ML17053D169 | 1 March 1982 | Annual Financial Rept 1981 | |
ML17223A745 | 26 January 1990 | Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N | |
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML17261A530 | 18 June 1987 | Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys | |
ML17264A118 | 31 July 1995 | Response to Part (1) of GL 92-01,Rev 1,Suppl 1. | |
ML17279A191 | 7 April 1987 | Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl | |
ML17298B539 | 30 November 1984 | Summary Rept on Design Basis of Shutdown Cooling Sys Relief Valves for Cessar Sys 80. | Hydrostatic |
ML17298B540 | 30 November 1984 | Summary Rept on Operability of Shutdown Cooling Sys Relief Valves for Palo Verde Units 1,2 & 3. | |
ML17340A985 | 4 April 1981 | Monthly Operating Repts for Mar 1981 | |
ML17341B242 | 7 May 1982 | QA Manual. | Safe Shutdown Coatings Nondestructive Examination Condition Adverse to Quality Control of Heavy Loads Backfit |
ML17342A206 | 10 June 1985 | Revised Rev 8 to Topical QA Rept. | Safe Shutdown Non-Destructive Examination Fire Barrier Coatings Nondestructive Examination Control of Heavy Loads Early Warning Fire Detection Backfit |
ML17342B046 | 30 November 1987 | Monthly Operating Repts for Nov 1987 | |
ML17342B051 | 31 October 1987 | Corrected Monthly Operating Repts for Oct 1987,consisting of Revised Outage Duration Hours | |
ML17342B089 | 30 November 1987 | Corrected Monthly Operating Rept for Nov 1987 | |
ML17342B171 | 31 January 1988 | Monthly Operating Repts for Jan 1988 | |
ML17342B172 | 30 April 1987 | Corrected Operating Data Repts for Apr 1987 | |
ML17342B173 | 31 May 1987 | Corrected Operating Data Repts for May 1987 | |
ML17342B174 | 30 June 1987 | Corrected Operating Data Repts for June 1987 | |
ML17342B175 | 31 July 1987 | Corrected Operating Data Repts for Jul 1987 | |
ML17342B176 | 31 August 1987 | Corrected Operating Data Repts for Aug 1987 | |
ML17342B177 | 30 September 1987 | Corrected Data Operating Repts for Sept 1987 |