05000277/LER-1997-004, Forwards LER 97-004-00 Re non-compliance of MCR Emergency Ventilation Sys TS Which Occurred on 970710 | 31 July 1997 | Forwards LER 97-004-00 Re non-compliance of MCR Emergency Ventilation Sys TS Which Occurred on 970710 | |
05000277/LER-1997-006, Forwards LER-97-006-00,concerning Unplanned ESF Actuation During 4-kV Electrical Bus Relay Testing Activities on 970923 | 21 October 1997 | Forwards LER-97-006-00,concerning Unplanned ESF Actuation During 4-kV Electrical Bus Relay Testing Activities on 970923 | |
05000277/LER-1997-007, Forwards LER 97-007-00 Which Documents Event That Occurred at Peach Bottom Atomic Power Station,Units 2 & 3 on 740705 | 19 November 1997 | Forwards LER 97-007-00 Which Documents Event That Occurred at Peach Bottom Atomic Power Station,Units 2 & 3 on 740705 | Unanalyzed Condition |
05000277/LER-1997-008, Forwards LER 97-008-00,reporting Discovery of safety-related Logic Components That Were Not Tested Per TS Surveillance Requirements on 740705 | 26 November 1997 | Forwards LER 97-008-00,reporting Discovery of safety-related Logic Components That Were Not Tested Per TS Surveillance Requirements on 740705 | |
05000277/LER-1997-009, Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys | 10 June 1998 | Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys | |
05000277/LER-1997-010, Forwards LER 97-010-01,reporting 971229 Failure of 2A Reactor Feedpump Turbine to Trip in Timely Manner | 10 June 1998 | Forwards LER 97-010-01,reporting 971229 Failure of 2A Reactor Feedpump Turbine to Trip in Timely Manner | |
05000277/LER-1998-001, Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump | 22 April 1998 | Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump | |
05000277/LER-1998-002, Forwards Details of LER 98-002-00 Re 980505 Loss of Both Trains of Main CR Emergency Ventilation Sys,Per Requirements of 10CFR50.73(a)(2)(i)(B) | 4 June 1998 | Forwards Details of LER 98-002-00 Re 980505 Loss of Both Trains of Main CR Emergency Ventilation Sys,Per Requirements of 10CFR50.73(a)(2)(i)(B) | |
05000277/LER-1998-003, Forwards LER 98-003-00,which Reports 980513 Failure to Meet TS for Main Crev,Per 10CFR50.73(a)(2)(i)(B) | 15 June 1998 | Forwards LER 98-003-00,which Reports 980513 Failure to Meet TS for Main Crev,Per 10CFR50.73(a)(2)(i)(B) | |
05000277/LER-1998-004, Forwards LER 98-004-00,reporting Failure to Meet TS Surveillance Requirements for One off-site Source Being Inoperable & 10CFR50.73(a)(2)(i)(B) | 22 July 1998 | Forwards LER 98-004-00,reporting Failure to Meet TS Surveillance Requirements for One off-site Source Being Inoperable & 10CFR50.73(a)(2)(i)(B) | |
05000277/LER-1998-005, Forwards LER 98-005-00 Re 980824 Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated | 29 September 1998 | Forwards LER 98-005-00 Re 980824 Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated | |
05000277/LER-1999-003, Forwards LER 99-003-00 Re 990318 Failure to Maintain Provisions of Fire Protection Program to Properly Address Effects of Flooding | 16 April 1999 | Forwards LER 99-003-00 Re 990318 Failure to Maintain Provisions of Fire Protection Program to Properly Address Effects of Flooding | Fire Protection Program |
05000277/LER-1999-004, Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities | 20 June 1999 | Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities | |
05000278/LER-1978-019, Forwards LER 78-019/01T-0 | 16 October 1978 | Forwards LER 78-019/01T-0 | |
05000278/LER-1980-026, Forwards LER 80-026/01T-0 | 26 November 1980 | Forwards LER 80-026/01T-0 | |
05000278/LER-1982-008, Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted | 18 June 1982 | Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted | |
05000278/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis Submitted | 8 February 1983 | Forwards LER 83-002/01T-0.Detailed Event Analysis Submitted | Local Leak Rate Testing |
05000278/LER-1983-005, Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted | 25 March 1983 | Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted | |
05000278/LER-1983-006, Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted | 10 February 1983 | Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted | Local Leak Rate Testing |
05000278/LER-1983-007, Forwards LER 83-007/01T-0.Detailed Event Analysis Submitted | 17 March 1983 | Forwards LER 83-007/01T-0.Detailed Event Analysis Submitted | |
05000278/LER-1983-011, Forwards LER 83-011/01T-0.Detailed Event Analysis Submitted | 21 April 1983 | Forwards LER 83-011/01T-0.Detailed Event Analysis Submitted | |
05000278/LER-1983-012, Forwards LER 83-012/-01T-0.Detailed Event Analysis Encl | 9 May 1983 | Forwards LER 83-012/-01T-0.Detailed Event Analysis Encl | Weld Overlay Intergranular Stress Corrosion Cracking |
05000278/LER-1998-001, Forwards LER 98-001-00,re Failure of 3A Core Spray Pump to Meet TS 3.5.1 as Result of Foreign Matl Intrusion Into Pump Impeller Area | 22 April 1998 | Forwards LER 98-001-00,re Failure of 3A Core Spray Pump to Meet TS 3.5.1 as Result of Foreign Matl Intrusion Into Pump Impeller Area | |
05000278/LER-1998-002, Forwards LER 98-002-00,reporting Failure to Meet TS Requirements for Unit 3 RCIC During Period When Overspeed Trip Function Could Have Resulted in Inadvertent Trip During RCIC Operation | 22 July 1998 | Forwards LER 98-002-00,reporting Failure to Meet TS Requirements for Unit 3 RCIC During Period When Overspeed Trip Function Could Have Resulted in Inadvertent Trip During RCIC Operation | Overspeed trip |
05000278/LER-1998-004, Forwards LER 98-004-00 Re ESF Actuation of Rwcs Due to High Flow Signal During Sys Restoration on 980820 | 17 September 1998 | Forwards LER 98-004-00 Re ESF Actuation of Rwcs Due to High Flow Signal During Sys Restoration on 980820 | |
05000278/LER-1999-001, Forwards LER 99-001-00 Re 990312 ESF Actuation of Rcics Due to High Steam Flow Signal During Sys Restoration.Rept Submitted Per 10CFR50.73(a)(2)(iv) | 8 April 1999 | Forwards LER 99-001-00 Re 990312 ESF Actuation of Rcics Due to High Steam Flow Signal During Sys Restoration.Rept Submitted Per 10CFR50.73(a)(2)(iv) | |
05000278/LER-1999-002, Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER | 12 July 1999 | Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER | |
05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) | 1 October 1999 | Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) | |
05000311/LER-1981-002, Forwards LER 81-002/03L-0.Detailed Event Analysis Encl | 9 February 1981 | Forwards LER 81-002/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1981-019, Forwards LER 81-019/03L-0.Detailed Event Analysis Encl | 16 June 1981 | Forwards LER 81-019/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1981-021, Forwards LER 81-021/03L-0.Detailed Event Analysis Encl | 17 June 1981 | Forwards LER 81-021/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1981-029, Forwards LER 81-029/03L-0.Detailed Event Analysis Encl | 24 June 1981 | Forwards LER 81-029/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1981-050, Forwards LER 81-050/03X-1.Detailed Event Analysis Encl | 23 June 1982 | Forwards LER 81-050/03X-1.Detailed Event Analysis Encl | Offsite Circuit |
05000311/LER-1981-106, Forwards LER 81-106/03X-1.Detailed Event Analysis Encl | 25 August 1982 | Forwards LER 81-106/03X-1.Detailed Event Analysis Encl | |
05000311/LER-1981-129, Forwards LER 81-129/03X-1.Detailed Event Analysis Encl | 2 April 1982 | Forwards LER 81-129/03X-1.Detailed Event Analysis Encl | Boric Acid Shutdown Margin |
05000311/LER-1982-004, Forwards LER 82-004/03X-1.Detailed Event Analysis Encl | 25 August 1982 | Forwards LER 82-004/03X-1.Detailed Event Analysis Encl | Feedwater Heater |
05000311/LER-1982-012, Forwards LER 82-012/03X-1.Detailed Event Analysis Encl | 22 September 1982 | Forwards LER 82-012/03X-1.Detailed Event Analysis Encl | |
05000311/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Encl | 31 March 1982 | Forwards LER 82-020/03L-0.Detailed Event Analysis Encl | Overspeed trip |
05000311/LER-1982-021, Forwards LER 82-021/03L-0.Detailed Event Analysis Encl | 7 April 1982 | Forwards LER 82-021/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1982-022, Forwards LER 82-022/03L-0.Detailed Event Analysis Encl | 7 April 1982 | Forwards LER 82-022/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1982-025, Forwards LER 82-025/03L-0.Detailed Event Analysis Encl | 13 April 1982 | Forwards LER 82-025/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1982-028, Forwards LER 82-028/01X-1.Detailed Event Analysis Encl | 26 May 1982 | Forwards LER 82-028/01X-1.Detailed Event Analysis Encl | |
05000311/LER-1982-029, Forwards LER 82-029/03L-0.Detailed Event Analysis Encl | 19 May 1982 | Forwards LER 82-029/03L-0.Detailed Event Analysis Encl | Grab sample |
05000311/LER-1982-031, Forwards LER 82-031/03L-0.Detailed Event Analysis Encl | 19 May 1982 | Forwards LER 82-031/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1982-032, Forwards LER 82-032/03L-0.Detailed Event Analysis Encl | 19 May 1982 | Forwards LER 82-032/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1982-033, Forwards LER 82-033/03L-0.Detailed Event Analysis Encl | 21 May 1982 | Forwards LER 82-033/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1982-035, Forwards LER 82-035/03L-0.Detailed Event Analysis Encl | 26 May 1982 | Forwards LER 82-035/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1982-036, Forwards LER 82-036/03L-0.Detailed Event Analysis Encl | 26 May 1982 | Forwards LER 82-036/03L-0.Detailed Event Analysis Encl | |
05000311/LER-1982-037, Forwards LER 82-037/03L-0.Detailed Event Analysis Encl | 2 June 1982 | Forwards LER 82-037/03L-0.Detailed Event Analysis Encl | Grab sample |
05000311/LER-1982-038, Forwards LER 82-038/03L-0.Detailed Event Analysis Encl | 26 May 1982 | Forwards LER 82-038/03L-0.Detailed Event Analysis Encl | |