Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000277/LER-1997-004, Forwards LER 97-004-00 Re non-compliance of MCR Emergency Ventilation Sys TS Which Occurred on 97071031 July 1997Forwards LER 97-004-00 Re non-compliance of MCR Emergency Ventilation Sys TS Which Occurred on 970710
05000277/LER-1997-006, Forwards LER-97-006-00,concerning Unplanned ESF Actuation During 4-kV Electrical Bus Relay Testing Activities on 97092321 October 1997Forwards LER-97-006-00,concerning Unplanned ESF Actuation During 4-kV Electrical Bus Relay Testing Activities on 970923
05000277/LER-1997-007, Forwards LER 97-007-00 Which Documents Event That Occurred at Peach Bottom Atomic Power Station,Units 2 & 3 on 74070519 November 1997Forwards LER 97-007-00 Which Documents Event That Occurred at Peach Bottom Atomic Power Station,Units 2 & 3 on 740705Unanalyzed Condition
05000277/LER-1997-008, Forwards LER 97-008-00,reporting Discovery of safety-related Logic Components That Were Not Tested Per TS Surveillance Requirements on 74070526 November 1997Forwards LER 97-008-00,reporting Discovery of safety-related Logic Components That Were Not Tested Per TS Surveillance Requirements on 740705
05000277/LER-1997-009, Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys10 June 1998Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys
05000277/LER-1997-010, Forwards LER 97-010-01,reporting 971229 Failure of 2A Reactor Feedpump Turbine to Trip in Timely Manner10 June 1998Forwards LER 97-010-01,reporting 971229 Failure of 2A Reactor Feedpump Turbine to Trip in Timely Manner
05000277/LER-1998-001, Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump22 April 1998Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump
05000277/LER-1998-002, Forwards Details of LER 98-002-00 Re 980505 Loss of Both Trains of Main CR Emergency Ventilation Sys,Per Requirements of 10CFR50.73(a)(2)(i)(B)4 June 1998Forwards Details of LER 98-002-00 Re 980505 Loss of Both Trains of Main CR Emergency Ventilation Sys,Per Requirements of 10CFR50.73(a)(2)(i)(B)
05000277/LER-1998-003, Forwards LER 98-003-00,which Reports 980513 Failure to Meet TS for Main Crev,Per 10CFR50.73(a)(2)(i)(B)15 June 1998Forwards LER 98-003-00,which Reports 980513 Failure to Meet TS for Main Crev,Per 10CFR50.73(a)(2)(i)(B)
05000277/LER-1998-004, Forwards LER 98-004-00,reporting Failure to Meet TS Surveillance Requirements for One off-site Source Being Inoperable & 10CFR50.73(a)(2)(i)(B)22 July 1998Forwards LER 98-004-00,reporting Failure to Meet TS Surveillance Requirements for One off-site Source Being Inoperable & 10CFR50.73(a)(2)(i)(B)
05000277/LER-1998-005, Forwards LER 98-005-00 Re 980824 Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated29 September 1998Forwards LER 98-005-00 Re 980824 Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated
05000277/LER-1999-003, Forwards LER 99-003-00 Re 990318 Failure to Maintain Provisions of Fire Protection Program to Properly Address Effects of Flooding16 April 1999Forwards LER 99-003-00 Re 990318 Failure to Maintain Provisions of Fire Protection Program to Properly Address Effects of FloodingFire Protection Program
05000277/LER-1999-004, Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities20 June 1999Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities
05000278/LER-1978-019, Forwards LER 78-019/01T-016 October 1978Forwards LER 78-019/01T-0
05000278/LER-1980-026, Forwards LER 80-026/01T-026 November 1980Forwards LER 80-026/01T-0
05000278/LER-1982-008, Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted18 June 1982Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis Submitted8 February 1983Forwards LER 83-002/01T-0.Detailed Event Analysis SubmittedLocal Leak Rate Testing
05000278/LER-1983-005, Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted25 March 1983Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-006, Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted10 February 1983Forwards LER 83-006/01T-0.Detailed Event Analysis SubmittedLocal Leak Rate Testing
05000278/LER-1983-007, Forwards LER 83-007/01T-0.Detailed Event Analysis Submitted17 March 1983Forwards LER 83-007/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-011, Forwards LER 83-011/01T-0.Detailed Event Analysis Submitted21 April 1983Forwards LER 83-011/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-012, Forwards LER 83-012/-01T-0.Detailed Event Analysis Encl9 May 1983Forwards LER 83-012/-01T-0.Detailed Event Analysis EnclWeld Overlay
Intergranular Stress Corrosion Cracking
05000278/LER-1998-001, Forwards LER 98-001-00,re Failure of 3A Core Spray Pump to Meet TS 3.5.1 as Result of Foreign Matl Intrusion Into Pump Impeller Area22 April 1998Forwards LER 98-001-00,re Failure of 3A Core Spray Pump to Meet TS 3.5.1 as Result of Foreign Matl Intrusion Into Pump Impeller Area
05000278/LER-1998-002, Forwards LER 98-002-00,reporting Failure to Meet TS Requirements for Unit 3 RCIC During Period When Overspeed Trip Function Could Have Resulted in Inadvertent Trip During RCIC Operation22 July 1998Forwards LER 98-002-00,reporting Failure to Meet TS Requirements for Unit 3 RCIC During Period When Overspeed Trip Function Could Have Resulted in Inadvertent Trip During RCIC OperationOverspeed trip
05000278/LER-1998-004, Forwards LER 98-004-00 Re ESF Actuation of Rwcs Due to High Flow Signal During Sys Restoration on 98082017 September 1998Forwards LER 98-004-00 Re ESF Actuation of Rwcs Due to High Flow Signal During Sys Restoration on 980820
05000278/LER-1999-001, Forwards LER 99-001-00 Re 990312 ESF Actuation of Rcics Due to High Steam Flow Signal During Sys Restoration.Rept Submitted Per 10CFR50.73(a)(2)(iv)8 April 1999Forwards LER 99-001-00 Re 990312 ESF Actuation of Rcics Due to High Steam Flow Signal During Sys Restoration.Rept Submitted Per 10CFR50.73(a)(2)(iv)
05000278/LER-1999-002, Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER12 July 1999Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER
05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1 October 1999Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)
05000311/LER-1981-002, Forwards LER 81-002/03L-0.Detailed Event Analysis Encl9 February 1981Forwards LER 81-002/03L-0.Detailed Event Analysis Encl
05000311/LER-1981-019, Forwards LER 81-019/03L-0.Detailed Event Analysis Encl16 June 1981Forwards LER 81-019/03L-0.Detailed Event Analysis Encl
05000311/LER-1981-021, Forwards LER 81-021/03L-0.Detailed Event Analysis Encl17 June 1981Forwards LER 81-021/03L-0.Detailed Event Analysis Encl
05000311/LER-1981-029, Forwards LER 81-029/03L-0.Detailed Event Analysis Encl24 June 1981Forwards LER 81-029/03L-0.Detailed Event Analysis Encl
05000311/LER-1981-050, Forwards LER 81-050/03X-1.Detailed Event Analysis Encl23 June 1982Forwards LER 81-050/03X-1.Detailed Event Analysis EnclOffsite Circuit
05000311/LER-1981-106, Forwards LER 81-106/03X-1.Detailed Event Analysis Encl25 August 1982Forwards LER 81-106/03X-1.Detailed Event Analysis Encl
05000311/LER-1981-129, Forwards LER 81-129/03X-1.Detailed Event Analysis Encl2 April 1982Forwards LER 81-129/03X-1.Detailed Event Analysis EnclBoric Acid
Shutdown Margin
05000311/LER-1982-004, Forwards LER 82-004/03X-1.Detailed Event Analysis Encl25 August 1982Forwards LER 82-004/03X-1.Detailed Event Analysis EnclFeedwater Heater
05000311/LER-1982-012, Forwards LER 82-012/03X-1.Detailed Event Analysis Encl22 September 1982Forwards LER 82-012/03X-1.Detailed Event Analysis Encl
05000311/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Encl31 March 1982Forwards LER 82-020/03L-0.Detailed Event Analysis EnclOverspeed trip
05000311/LER-1982-021, Forwards LER 82-021/03L-0.Detailed Event Analysis Encl7 April 1982Forwards LER 82-021/03L-0.Detailed Event Analysis Encl
05000311/LER-1982-022, Forwards LER 82-022/03L-0.Detailed Event Analysis Encl7 April 1982Forwards LER 82-022/03L-0.Detailed Event Analysis Encl
05000311/LER-1982-025, Forwards LER 82-025/03L-0.Detailed Event Analysis Encl13 April 1982Forwards LER 82-025/03L-0.Detailed Event Analysis Encl
05000311/LER-1982-028, Forwards LER 82-028/01X-1.Detailed Event Analysis Encl26 May 1982Forwards LER 82-028/01X-1.Detailed Event Analysis Encl
05000311/LER-1982-029, Forwards LER 82-029/03L-0.Detailed Event Analysis Encl19 May 1982Forwards LER 82-029/03L-0.Detailed Event Analysis EnclGrab sample
05000311/LER-1982-031, Forwards LER 82-031/03L-0.Detailed Event Analysis Encl19 May 1982Forwards LER 82-031/03L-0.Detailed Event Analysis Encl
05000311/LER-1982-032, Forwards LER 82-032/03L-0.Detailed Event Analysis Encl19 May 1982Forwards LER 82-032/03L-0.Detailed Event Analysis Encl
05000311/LER-1982-033, Forwards LER 82-033/03L-0.Detailed Event Analysis Encl21 May 1982Forwards LER 82-033/03L-0.Detailed Event Analysis Encl
05000311/LER-1982-035, Forwards LER 82-035/03L-0.Detailed Event Analysis Encl26 May 1982Forwards LER 82-035/03L-0.Detailed Event Analysis Encl
05000311/LER-1982-036, Forwards LER 82-036/03L-0.Detailed Event Analysis Encl26 May 1982Forwards LER 82-036/03L-0.Detailed Event Analysis Encl
05000311/LER-1982-037, Forwards LER 82-037/03L-0.Detailed Event Analysis Encl2 June 1982Forwards LER 82-037/03L-0.Detailed Event Analysis EnclGrab sample
05000311/LER-1982-038, Forwards LER 82-038/03L-0.Detailed Event Analysis Encl26 May 1982Forwards LER 82-038/03L-0.Detailed Event Analysis Encl