IR 05000282/2002008 | 30 October 2002 | IR 05000282-02-008, IR 05000306-02-008, on 07/01/02 - 09/30/02, Prairie Island, Maintenance Effectiveness and Identification and Resolution of Problems | Safe Shutdown Unanalyzed Condition Fire Barrier Significance Determination Process Maintenance Rule Program Fire Protection Program Power change |
ML022620239 | 1 October 2002 | Relief, Evaluation of Relief Request Associated with the Third 10-Year Interval Inservice Inspection Program (MB5388, 5399, 5390, & 5391) | Boric Acid VT-2 Incorporated by reference |
ML022840083 | 11 October 2002 | Notice of Meeting with Nuclear Management Company, LLC Regarding Prairie Island Nuclear Generating Plant, Reactor Physics | |
ML022900444 | 8 October 2002 | September 2002 Monthly Operating Report for Prairie Island | |
ML022900463 | 7 October 2002 | Summary of Table of Contents - Record of Revisions Rev.8 to Monticello & Prairie Island Offsite Nuclear Emergency Plan Implementing Procedures | |
ML022960423 | 7 October 2002 | Letter Regards Summary of Revision 22 to Monticello & Prairie Island Offsite Nuclear Emergency Plan | |
ML022960545 | 14 October 2002 | Emergency Response Plan Implementing Procedures for Prairie Island Nuclear Generating Plant | |
ML022960550 | 16 October 2002 | Emergency Response Plan Implementing Procedure F3-13.5, Rev 5, Alternate Meteorological Data. | |
ML023010209 | 7 November 2002 | Relief, Third 10-Year Interval Inservice Inspection Program | Incorporated by reference |
ML023010607 | 13 November 2002 | Upcoming Steam Generator Tube Inservice Inspection | |
ML023020594 | 22 October 2002 | Notification of Contractor Screening Program Use | |
ML023090556 | 1 November 2002 | Generic Fundamentals Examination Section of Written Operator Licensing Examination Answer Key for Forms a & B, Grading Results & Individual Answer Sheets for Individuals Taking Test | Generic Fundamentals Examination |
ML023100558 | 29 October 2002 | Core Operating Limits Report for Prairie Island, Unit 1 Cycle 21, Revision 2 and Unit 2 Cycle 21, Revision 1 | Shutdown Margin |
ML023190160 | 13 December 2002 | Summary of Meeting with Nuclear Management Co., LLC, Reactor Physics & Reactor Core Management for Prairie Island, Units 1 & 2 | |
ML023220476 | 18 November 2002 | RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | Boric Acid VT-2 Pressure Boundary Leakage |
ML023230354 | 7 November 2002 | Pressure & Temperature Limits Report (PTLR) Revisions 2 & 3 | Hydrostatic Pressure and Temperature Limits Report |
ML023240412 | 13 November 2002 | October 2002 Monthly Operating Report for Prairie Island Units 1 & 2 | |
ML023290578 | 16 November 2002 | Request for Relief No. 9 for the Unit 2 Third 10-Year Interval Inservice Inspection Program | Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023370369 | 25 November 2002 | GFE Registration Letter - February 2003 Examination | Generic Fundamentals Examination |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023440340 | 10 December 2002 | EN-02-058, Nuclear Management Company, LLC | |
ML023500267 | 13 December 2002 | IA-02-012, Hiedeman, Notice of Violation | Enforcement Discretion |
ML023500330 | 13 December 2002 | Safety Analysis Transition to Westinghouse Meeting Objectives | |
ML023500382 | 13 December 2002 | EA-02-068, Prairie Island, Notice of Violation & Proposed Imposition of Civil Penalty $60,000, NRC OI 3-2001-017 | Enforcement Discretion |
ML023540262 | 12 December 2002 | November 2002 Monthly Operating Report for Prairie Island Nuclear Generating Plant | |
ML023540268 | 13 December 2002 | 2002 Unit 1 Steam Generator Inspection Results - 15 Day Report | |
ML023610432 | 20 December 2002 | Corrections to ECCS Evaluation Models | |
ML023610559 | 19 December 2002 | Emergency Plan Implementing Procedures, Including Rev 18 to F3-9, Emergency Evacuation, Rev 20 to F3-8, Recommendations for Offsite Protective Actions & Rev 21 to F3-5, Emergency Notifications. | Fitness for Duty Health Physics Network High winds Met Tower Deep Dose Equivalent |
ML023640310 | 30 December 2002 | Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design-Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events | Earthquake |
ML030030487 | 26 December 2002 | Unit 1 Steam Generator Category C-3 Inspection Result 30 Day Report with Technical Specification 5.6.7.3, Provided for the Information of the NRC Staff | Boric Acid |
ML030360349 | 22 November 2002 | Licensee Handouts - 1R22 SG Inspection | |
ML100840642 | 20 November 2002 | Feasibly Study for Conversion of Prairie Island to Natural Gas Fired Generation. Submitted with Comments on Draft Generic Environmental Impact Statement for Prairie Island Nuclear Generating Plant, Units 1 and 2, Supplement 39 to NUREG- 143 | |
Press Release-III-02-066, NRC Staff Proposes $60,000 Fine Against Nuclear Management Co. for Failing to Provide Complete and Accurate Information | 17 December 2002 | Press Release-III-02-066: NRC Staff Proposes $60,000 Fine Against Nuclear Management Co. for Failing to Provide Complete and Accurate Information | Enforcement Discretion |
TAC:MB5388 | 1 October 2002 | ||
TAC:MB5690 | 7 November 2002 | ||
TAC:MB6393 | 13 November 2002 |