November 2002 Monthly Operating Report for Prairie Island Nuclear Generating Plant
ML023540262
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/12/2002
From: Nazar M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023540262 (7)


Text

CommittedftolNuclearExcellenceMa N Mano K. Nazar Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Dr. East = Welch MN 55089 December 12,2002 1 Technical Specifications 5.6.4 US Nuclear.Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND.NUCLEAR GENERATING PLANT Docket No. 50-282:,',License No. DPR-42 50-306 '- DPR-60 Monthly Operating Report November 2002 Attached is the Monthly Operating Report for November 2002 for the Prairie Island Nuclear Generating Plant. The Nuclear Management Company has not made new or revised existing Nuclear Regulatory Commission commitments in this letter or the attachment.

Mano K. Nazar Site Vice Presi nt Prairie Island uclear Generating Plant c: Regio al Administrator-Region III, NRC NRR Project Manager, NRC Senior Resident Inspector, NRC James Bernstein, State of Minnesota

Attachment:

Monthly Operating Report; November 2002

PRINTED 12110/2002 NRC MONTHLY REPORT Page 1 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO. 1 DATE12/1012002 COMPLETED BY DALE DUGSTAD PHONE 651-388-11214376 SOUMINRYOF O OATING EXPERIENCE MIONTH: NOVEMBER 2002 During the month of November, Unit I was base loaded. There was one power reduction and one shutdown. ,o , ..

On the 4th at 0107, the Unit started coastdown operation to prepare for the scheduled refueling outage.

  • Theoutage started on the 15th at 2021, when thereadtor was manually tripped due to a high level inthe 13A Feedwater Heater which could not be reduced.

This was a planned decision Inresponse to a known problem with an extraction bellows.

The Unit remained Inthe refueling outage for the rest of the month.

There are no other items to report.

CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS

PRINTED 12/10/2002 NRC MONTHLY REPORT Page 2 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO. 1 DATE 1211012002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 pEA NG DATA REPORT

°,.*.

OP2.ATIN STATUS... *° J

1. UNIT NAME: PRAIRIE ISLAND NO. 1 2.'REPORTING PERIOD:  ;'- I'NOVEMBER ," 2002 ..

, 3. LICENSED THERMAL POWER (MWT): 1650

4. NAMEPLATE RATING (GROSS MWE): 593
5. DESIGN ELECTRICAL RATING (NET MWE): 538
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 554
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 522
8. IFCHANGES OCCUR INCAPACITY RATINGS (ITEMS 3- 7) SINCE LAST REPORT, GIVE REASON:

NONE

9. POWER LEVEL TO WHICH RESTRICTED, IFANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS, IFANY: NONE THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 8016 253848
12. NUMBER OF HOURS REACTOR CRITICAL 356.3 7652.3 219584.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
14. HOURS GENERATOR ON-LINE 356.3 7652.3 217626.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 566001 12550592 347319848
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 195070 4284020 115490270
18. NET ELECTRICAL ENERGY GENERATED (MWH) 184789 4055311 108745818
19. UNIT SERVICE FACTOR 49.5 955 85.7
20. UNIT AVAILABILITY FACTOR 49.5 95.5 85.7
21. UNIT CAPACITY FACTOR (MDC NET) 49.2 969 84.4
22. UNIT CAPACITY FACTOR ( DER NET) 47.9 94.4 80.7
23. UNIT FORCED OUTAGE RATE 0.0 0.0 4.6
24. FORCED OUTAGE HOURS 0.0 0.0 10462.7

PRINTED 12110/2002 NRC MONTHLY REPORT Page 3 DOCKET NO. 50-282 UMT PRAIRIE ISLAND NO. 1 DATE 12110/2002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 5.

UNIT SHUTDOWNS AND POWER REDUCTIONS MOIITH NVEMBER 2002 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 1111512002 1 S 363.7 C 2 02-02 WA WA NOTES: Refueling outage.

4;,

TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD 800-1984(P805-D5)

S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER

NRC MONTHLY REPORT PRINTED 12/1012002 Page 4 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 1211012002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 NARRATiVM

SUMMARY

OF OPERATING EXPERIENCE MOWMNT: NOVE-MBER 2002 During the month of November, Unit 2 was base loaded. There were no shutdowns or power reductions. .. .

T heno.or , .e

  • * .. -. * 'I , ..

"V - . . ' *

, -o , *- -

CURRENT CONTINUOUS OPERATING RUN OF 273 DAYS

NRC MONTHLY REPORT PRINTED 12/1012002 Page 5 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 12410/2002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 OQPEMATI DAT REPORT OPERTING TAY0*S:" '

1. UNIT NAME: PRAIRIE ISLAND NO. 2

,2. REPORTING PERIOD: ,NbVEMBER *2002 . ,

3. LICENSED THERMAL POWER (MWT): 1650 4., AEPLATE RATING (GROSS MWE): 593
5. DESIGN ELECTRICAL RATING (NET MWE): 536
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 554
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 522
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3- 7) SINCE LAST REPORT, GIVE REASON:

NONE

9. POWER LEVEL TO WHICH RESTRICTED, IFANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS. IF ANY: NONE THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 8016 244966
12. NUMBER OF HOURS REACTOR CRITICAL 720.0 7362.1 217360.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
14. HOURS GENERATOR ON-LINE 720.0 7338.9 215667.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1185883 11988670 345185468
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 412780 4110190 113920570
18. NET ELECTRICAL ENERGY GENERATED (MWH) 393411 3889432 107723302
19. UNIT SERVICE FACTOR 1000 91.6 88.0
20. UNIT AVAILABILITY FACTOR 1000 91.6 88.0
21. UNIT CAPACITY FACTOR ( MDC NET) 104.7 93.0 87.0
22. UNIT CAPACITY FACTOR ( DER NET) 101.9 90.5 82.8
23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.9
24. FORCED OUTAGE HOURS 0.0 0.0 6390.7

PRINTED 12/1012002 NRC MONTHLY REPORT Page 6 DOCKET NO. 50-306 UNIT PRAIRE ISLAND NO. 2 DATE 1211012002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: NjOEMBERg 2002 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 11/3012002 2 NIA 0 N/A N/A N/A NOTES: None.

TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD B-MAINTENANCE OR TEST 2-MANUAL TRIP 800-1984(P805-D5)

S-SCHEDULED C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER