ML023240412
| ML023240412 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 11/13/2002 |
| From: | Nazar M Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML023240412 (7) | |
Text
Committed to NucearExcenence KN Cle Mano K. Nazar Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Dr. East
- Welch MN 55089 November 13, 2002 Technical Specifications 5.6.4 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No.
50-282 License No.
DPR-42 50-306 DPR-60 Monthly Operating Report October 2002 Attached is the Monthly Operating Report for October 2002 for the Prairie Island Nuclear Generating Plant. The Nuclear Management Company has not made new or revised existing Nuclear Regulatory Commission commitments in this letter or the attachment.
t."
Mano K. Nazar Site Vice President Prairie Island Nuclear Generating Plant c:
Regional Administrator-Region Ill, NRC NRR Project Manager, NRC Senior Resident Inspector, NRC James Bernstein, State of Minnesota
Attachment:
Monthly Operating Report; October 2002
NRC MONTHLY REPORT PRNTED 11512002 Page 1 f,DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO. 1 DATE 1115/2002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 NARRATIF VE-1jMMARY OF OPERATING EXPERIENCE MONTH: OCTOBER 2002 During the month of October, Unit I was base loaded. There were no shutdowns or power reductions.
This reporting period had 745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br /> due jo the time change of Daylight Savings Time.
There are no other items to report 4,
I.',
f r l.
.4>
CURRENT CONTINUOUS OPERATING RUN OF 415 DAYS
NRC MONTHLY REPORT PRINTED 11/5/2002 Page 2 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO. 1 DATE 11/512002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 OPERATING DATA REPORT OPERATING STATUS : :.
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 1
- 2. REPORTING PERIOD:
" ;OCTOBER 2002.
- 3. UCENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 536
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
554
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
522
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3-7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY:
NONE THIS MONTH YR-TO-DATE SCUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7296 253128
- 12. NUMBER OF HOURS REACTOR CRITICAL 745.0 7296.0 219228.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
- 14. HOURS GENERATOR ON-UNE 745.0 7296.0 217270.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1224473 11984591 346753847
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 421790 4088950 115295200
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 401398 3870522 108561029
- 19. UNIT SERVICE FACTOR 100.0 100.0 85.8
- 20. UNIT AVAILABIUTY FACTOR 100.0 100.0 85.8
- 21. UNIT CAPACITY FACTOR (MDC NET) 103.2 101.6 84.5
- 22. UNIT CAPACITY FACTOR ( DER NET) 100.5 99.0 80.8
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 4.6
- 24. FORCED OUTAGE HOURS 0.0 0.0 10462.7 I
t
NRC MONTHLY REPORT PRINTED 111512002 Page 3 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO. 1 DATE 111512002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 UNIT, SUT OWNS AND POWER REDUCI"ONS MONTH: OCTOBER 2002 UNIT TYPE I
N/A None for October.
HOURS REASON METHOD LER NUMBER SYSTEM 0
N/A N/A COMPONENT N/A (1
I I
REASON A-EQUIPMENT FAILURE B-MAINTENANCE OR TEST C-REFUELING D.REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER 1-MANUAL DRAFT IEEE STD 2-MANUAL TRIP 800-1984(P805-05) 3-AUTO TRIP 4-CONTINUED 5-REDUCED LOAD COMPONENT OgDE 9-OTHER IEEE STD 803A-1983 DATE 10/31/2002 NOTES:
F-FORCED S-SCHEDULED
NRC MONTHLY REPORT PRINTED 11/52002 Page 4 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/512002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: OCTOBER 2002 During the month of October, Unit 2 was base loaded. There were no shutdowns and only one Power reduction.
A turbine valve test was conducted on the 27th of October.
This reporting period had 745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br /> due to the time change of Daylight Savings Time.
There are no other items to report.
r*,
t CURRENT CONTINUOUS OPERATING RUN OF 243 DAYS
NRC MONTHLY REPORT PRINTED 1115/2002
'Page 5 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 115/2002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 OPERATING DATA REPORT OPERATING STATUS.2":
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 2
- 2. REPORTING PERIOD:
', OCTOBER
-2002
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 536
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
554
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
522
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY:
NONE
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABIULTY FACTOR
- 21. UNIT CAPACITY FACTOR (MDC NET)
- 22. UNIT CAPACITY FACTOR (DER NET)
- 23. UNIT FORCED OUTAGE RATEý
- 24. FORCED OUTAGE HOURS-THIS MONTH 745 745.0 0.0 745.0 0.0 1221541 425300 405529 100.0 100.0 104.3 101.6 0.0 0.0 YR-TO-DATE 7296 6642.1 0.0 6618.9 0.0 10802787 3697410 3496021 90.7 90.7 91.8 89A
'0.0 0.0 CUMULATIVE 244246 216640.2 1516.1 214947.5 0.0 343999585 113507790 107329891 88.0 88.0 87.0 82.8 2.9 6390.7 p
I, a I.
0 I
NRC MONTHLY REPORT PRINTED 111512002 Page 6 DOCKET NO. 50-306 UNIT PRAMIRE ISLAND NO. 2 DATE 1115/2002 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 UNITSHUTDOWNS AND POWER REDUCTIONS MONTH: OCTOBER 2002 DATE UNIT TYPE 10/27/2002 2
S NOTES: Turbine vlave testing.
HOURS 0
REASON METHOD LER NUMBER SYSTEM 8
5 N/A N/A COMPONENT N/A TPEg F-FORCED S-SCHEDULED A-EQUIPMENT FAILURE
-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND UCENSE EXAMINATION METHOD 1-MANUAL 2-MANUAL TRIP 3-AUTO TRIP 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM CODE DRAFT IEEE STD Soo-1984(PS05-D5)
IEEPONENT GM18 IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR "H-OTHER
.