Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20199C51718 November 1997Notice of Violation from Insp on 970527-0808.Violations Noted:From Jan 1997 Through May 1997,adequate Measures Were Not Taken to Assure That ISI of Unit 2 SG Tubes Were Appropriately ContolledEnforcement Discretion
Nondestructive Examination
ML20202C35028 November 1997Notice of Violation from Insp on 971103-06.Violation Noted: on 971105,licensee Failed to Store 5 Millicurie Ni-63 Source in Designated Area
ML20202E3206 February 1998Notice of Violation from Insp on 971027-31 & 1110-14. Violation Noted:As of 911123,procedure 1010.002, Transient History/Transient Cycle Logging, Was Inappropriate to CircumstancesBattery sizing
ML20202J6526 December 1997Notice of Violation from Insp on 971020-1107.Violation Noted:On 971021,plant Safety Committee Approved Change to Units 1 & 2 Fsars,Section 9D.1.3 & Approved Procedure 100.120, ANO Fire Watch Program, W/O Written SEFire Watch
ML20203D45716 July 1986Notice of Violation from Insp on 860519-23
ML20203F37625 July 1986Notice of Violation from Insp on 860609-13
ML20203F40724 July 1986Notice of Violation from Insp on 860601-30
ML20203F43725 July 1986Notice of Violation from Insp on 860519-23
ML20204F08620 March 1987Notice of Violation from Insp on 870201-28
ML20205G03413 August 1986Notice of Violation from Insp on 860414-18 & 0519-23
ML20205N70618 April 1986Notice of Violation from Insp on 860126-31
ML20205N74018 April 1986Notice of Violation from Insp on 860317-21
ML20206K12218 November 1988Notice of Violation from Insp on 880915-1023.Violation Noted:Controls for Temporary Supports Not Suitable
ML20206M87021 August 1986Notice of Violation from Insp on 860701-31
ML20206P16215 April 1987Notice of Violation from Insp During Mar 1987
ML20207G8517 June 1999Notice of Violation from Investigation Rept A4-1998-042 on 990127.Violation Noted:After 980528,ES Feemster,Initiated Reactor Simulator Training Attendance Record Indicating Attendance at 980528 Training Session Not Attended
ML20211K42212 November 1986Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Design Control Measures for Design Change Package DCP 82-0-1050 Failed to Properly Verify Single Failure or Loss of Power SupplyBattery sizing
ML20211M15811 December 1986Notice of Violation from Insp on 861006-10
ML20211Q76924 February 1987Notice of Violation from Insp on 870119-23Offsite Dose Calculation Manual
ML20212A03423 July 1986Notice of Violation from Insp on 860501-31Scaffolding
ML20212A39524 February 1987Notice of Violation from Insp on 870101-31
ML20214K24715 August 1986Notice of Violation from Insp on 860623-27
ML20214M11026 May 1987Notice of Violation from Insp on 870401-30Boric Acid
Temporary Modification
ML20214S5021 June 1987Notice of Violation from Insp on 870322-27
ML20215E8796 October 1986Notice of Violation from Insp on 860801-31Scaffolding
ML20215E9356 October 1986Notice of Violation from Insp on 860728-0801
ML20215F09615 June 1987Notice of Violation from Insp on 870501-31
ML20216B86210 March 1998Notice of Violation from Insp on 980104-0214.Violation Noted:Instrumentation & Control Technicians Failed to Remove Three Jumpers Before Restoring Reactor Protection Sys Channel C to Svc
ML20216H19025 June 1987Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Violation Noted:Pressurizer Code Safety Valve PSV-1002 Inoperable While Reactor Critical
ML20216K00713 November 1990Notice of Violation from Insp on 900905-1016.Violation Noted:Plant Review Committee Performed Inadequate Review of Proposed Mod to Equipment That Affects Nuclear SafetyTemporary Modification
ML20217A92317 April 1998Notice of Violation from Insp on 980215-0328.Violation Noted:Licensee Failed to Update Radiological Info Posting at Entrance of HPSI Pump Room a to Reflect Results of Radiological Surveys Performed Between 980221 & 0302
ML20217N2712 April 1998Notice of Violation from Insp on 980302-11.Violation Noted: Engineering Technique Specification Sheet Etss 4 Instructed Outage 2P98 Eddy Current Analysts to Use Phase Rotation Setting Inappropriate for Plus Point Probe
ML20235L29630 September 1987Notice of Violation from Insp on 870504-08 & 0608-12. Violation Noted:Structural Steel Found Supporting Fire Barrier & Unprotected from Effects of FireFire Barrier
ML20235U8012 March 1989Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Noncompliance Noted:Individual Working in Unit 1 Restricted Area Received Whole Body Dose of 3.216 Rems W/Cumulative Whole Body Dose for Quarter of 4.546 Rems
ML20235W38416 July 1987Notice of Violation from Insp on 870601-30.Violation Noted: Dedicated Operator Not Stationed at CV-2870 as Required When Cycling Valve,During Performance of Procedure 1106.06,Suppl III
ML20236B55922 October 1987Notice of Violation from Insp on 870914-18.Violation Noted: Failure to Label,Mark or Control Hand Tools W/Radiation Levels Above Allowed Background Levels
ML20236G44729 October 1987Notice of Violation from Insp on 870901-30.Violation Noted: Failure to Have Adequate Lubrication Schedules for safety-related Pump Couplings
ML20236L52213 April 1998Notice of Violation from Investigation on 970916-980210. Violation Noted:Mj Talley Deliberately Documented Radiation & Contamination Survey Results for Areas Which Were Not Surveyed
ML20236V5011 December 1987Notice of Violation from Insp on 870914-18.Violation Noted: Failure to Include Provisions of 810420 Order for Mod of License & Technical Evaluation Rept in Development of Procedures for Periodic Valve Leak TestingHydrostatic
ML20237C92718 August 1998Notice of Violation from Insp on 980621-0801.Violation Noted:Between 970601 & 980709,four Unit 1 Sros,Five Unit 2 Sros,One Unit 1 RO & Five Unit 2 ROs Resumed Activities Authorized by License W/O Performing RO or SRO Functions
ML20237K39014 August 1987Notice of Violation from Insp on 870701-31.Violation Noted: Containment Atmosphere Monitoring Sys Samples Being Discharged Via Hoses to Auxiliary Bldg Ventilation Sys & Manual Valve Closed But Not Locked
ML20244B1027 April 1989Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $175,000.Violations Noted:On 881124,Unit 1 Heated Above 280 F w/P7A turbine-driven Emergency Feedwater Pump Inoperable & Improper Valve Installation
ML20245A13115 June 1989Notice of Violation from Insp on 890515-19.Violation Noted:Nrc Inspector Observed Individual Cross step-off Pad Into Clean Area W/O First Removing Potentially Contaminated Protective Clothing
ML20245C78618 April 1989Notice of Violation from Insp on 890327-31.Violation Noted:Provisions of Part 21 Not Imposed in Three Purchase Orders Issued Since 1987 to Okonite Co for Supply of Basis Components
ML20245D74816 June 1989Notice of Violation from Insp on 890416-0531.Violation Noted:Inspector Found That Kop-Flex Ksg Grease Used Instead of Khp Grease as Required to Lubricate Gear Case to Pump Coupling on High Pressure Injection Pump
ML20245F44324 April 1989Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000.Noncompliance Noted:Equipment Qualification Files (EQ) Did Not Adequately Document EQ of Numerous Limitorque Motor Operators
ML20246C8686 July 1989Notice of Violation from Insp on 890605-14.Violation Noted:Licensee Failed to Provide Complete & Accurate Info Re Two Independent RCS Level Indications
ML20246G4039 March 1989Notice of Violation from Insp on 890101-31.Violations Noted: Failure to Provide Response to Notice of Violation within Required Time & Failure to Comply W/Ler & Emergency Diesel Generator Failure Reporting Requirements
ML20246P2769 May 1989Notice of Violation from Insp on 890403-07.Violation Noted: Licensee Operated Unit 2 Control Room Ventilation Radiation Monitor for Time Period Between 880811-22 W/Alarm/Trip Setpoint Above Required Tech Spec Limit
ML20246P35515 May 1989Notice of Violation from Insp on 890301-0415.Violation Noted:Transmitter PDT-1402 Inadvertently Isolated When Work Instructions Directed That Transmitter PDT-1401 Be Calibr, Resulting in Loss of DHR Flow Indication