APPENDIX A NOTICE OF VIOLATION Arkansas Power & Light Company Dockets: 50-313/86-21 50-368/86-22 Arkansas Nuclear One, Units 1 & 2 Licenses: DPR-51 NPF-6 During an NRC inspection conducted during the period June 1-30, 1986, violations of the NRC requirements were identified. The violations involved failure to follow a post-maintenance procedure and failure to document safety evaluations as required by 10 CFR 50.59.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violations are listed below:
A.
Unit 2 Technical Specification 6.8.1.C requires, in part, that written procedures shall be established, implemented, and maintained for test activities of safety related equipment.
Procedure 2403.53, " Unit 2 Class 1E Battery Charger Load Test," has been established in accordance with this requirement. This procedure requires that battery charger 2D34 be connected to DC Bus 2001 or 2002 during its load test.
Contrary to the above, on June 27, 1986, battery charger 2D34 was being tested following maintenance without using the lineup specified by the procedure. The battery charger was not connected to either DC bus and the power leads from.the battery charger to DC Bus 2002 were lifted. A temporary procedure change to permit this lineup had not been initiated.
This is a Severity Level IV Violation.
(SupplementI.D)(50-368/8622-02)
B.
10 CFR 50.59(b) requires the licensee to maintain records including written safety evaluations which provide the bases for the detennination that changes to the facility, changes to procedures, and tests or experiments do not involve an unreviewed safety question.
Contrary to the above, for one test procedure and five design change packages reviewed, there were no written safety evaluations which provided the bases for the determination that no unreviewed safety questions were involved.
This is a Severity Level IV Violation.
(SupplementI.D)(50-313/8621-01)
Pursuant to the provisions of 10 CFR 2.201, Arkansas Power and Light Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:
(1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved, gRo731oo61 860724 ADOCK 05000313 o
.. =..
2 1
(3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
i 2
Dated at lington, Texas, this gi/
day of 1986 3