_ - _ _
l 3
.i
~.,
APPENDIX A l
Entergy-Operations, Inc.
Docket No. 50-313 Arkansas Nuclear One, Unit 1 Operating License No. DPR-51 1
-During an NRC inspect. ion conducted September 5 through October 16, 1990, a
- violation of NRC requirements was identified.
In accordance with the " General Statemont of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C'(1990) (Enforcement Policy), the violation is listed below:
-I Unit 1 Technical Specification 6.5.1.6.d requires that the plant safety
-i committee shall.be responsible for " Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety."
i Contrary to the above, the plant review committee performed an inadequate review.of a proposed modification to equipment that affects nuclear safety in that the safety analysis for Temporary Modification Package 90-1-029-did not identify that Switch HS-1007A controlled pressurizer heaters RUB-14 and -1, As a result, on October 10, 1990, six_ pressurizer heater elements were energized with the pressurizer drainsi.
This is atSeverity Level IV violation.
(SupplementI)(313/9030-01) a Pursuant to.the provisions'of 10 CFR Part 2.201, Entergy Operations, Inc. is hereby required to submit a written statement or explanation to the U.S.
Nuclear _ Regulatory Commission, ATTN:
Document Control Desk, Washington D.C..
20555 with a: copy to-the Regional Administrator, Region IV, and, if applicable, a copy to the:NRC resident inspector, within=30 days of the date of the letter i
transmitting this Notice of Violation (Notice).
This reply should be clearly i
marked as a " Reply-to a Notice of Violation" and should. include for each violationi (1) the reason for the violation or, if contested, the ba' sis for.
i disputingithe violation, (2) the corrective steps tiiat have been-taken and the results achieved, (3) the corrective steps that will;be taken to avoid further y
violations ~,-and (4) the date when full compliance,will be achieved.
If-an-j aoequate reply is not received within the time specified in this Notice,_an order may be issued to show cause why the license should not be modified,
..}
suspended, or; revoked, or why such other action as may,be proper should not be taken. Where good cause is shown, consideration will be given to extending the
. response time.
Dated'at lington Te dayoff7g@xasM 1990
.this 9011200009 901113 POR ADOCK 05000313 o
PDL
.