IR 05000244/199120130 March 1994Forwards Summary of Conclusions of Assessment of Three NRC Concerns Discussed in 940128 Telcon Re SWS & Swsopi Insp 50-244/91-201 Dtd 920130Safe Shutdown
Design basis earthquake
IR 05000244/19920996 December 1993Provides Documentation of Info Exchanged Between Util & NRC During 931115 SALP Mgt Meeting on SALP Rept 50-244/92-99,w/ Respect to Operations & Plant SupportSystematic Assessment of Licensee Performance
IR 05000244/199301912 November 1993Discusses Info Re Exam Results & Planned Remedial Actions Re Training Program Insp Rept 50-244/93-19
IR 05000244/199302021 December 1994Advises of Util Plans to Resolve Open Item Documented in Insp Rept 50-244/93-20,dtd 931118,by Making Proposal That Consistently Applies Term Containment Isolation Boundary, as Well as Defining Allowed Outage Times
IR 05000244/19940056 May 1994Discusses Violations Noted in Insp Rept 50-244/94-05 During 940208-0308.Corrective Actions:Procedure RSSP-2.1, Safety Injection Functional Test Upgraded to Formally Document Testing of Both Manual Containment Pushbuttons
IR 05000244/199600229 April 1996Informs That Util Currently Reviewing Attached Root Cause Recommendations for Inclusion in Initial License Program Re Exam Rept 50-244/96-02OL
IR 05000244/199600815 August 1997Discusses Insp Rept 50-244/96-08 on 970521-30 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Involved Insp Finding That Vehicle Barrier Sys Found Inadequate
IR 05000244/199700611 November 1997Discusses Review of Apparent Inconsistency Between Data for Meteorological Tower & CR Instrumentation as Requested in Insp Rept 50-244/97-06,dtd 970909
IR 05000244/199701224 April 1998Provides Clarification for Several Statements Made in NRC Insp Rept 50-244/97-12 Dtd 980209Stroke time
IR 05000244/199720111 November 1997Forwards Copy of Leak-Before-Break Evaluation of Portions of RHR Sys at Re Ginna Nuclear Power Station, as Follow Up to Insp Rept 50-244/97-201,for Review & Approval
IR 05000244/199900524 September 1999Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & SvcsBreakaway torque
IR 05000244/199900814 October 1999Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy
IR 05000244/199920124 September 1999Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld
ML17244A15912 October 1978Forwards Application for Amend to License DPR-18,requesting Tech Spec Change Re Surveillance Intervals
ML17244A16310 October 1978Requests 60-day Extension to Respond to NRC 780711 Ltr Requesting Proposed Tech Specs to Implement App I to 10CFR50.Addl Time Required Due to Need to Implement Improvements to Health Physics Program
ML17244A16511 October 1978Forwards Response to 780906 Ltr.Final Response Pending Review W/Other SEP Utils.Final Response Will Be Submitted by 781130
ML17244A16911 October 1978Responds to 780913 Request for Addl Info Re Proposed Fire Protection & Structural Design Mod.Items 4 & 5 Addressed in 780922 Fire Protection Submittal
ML17244A17111 October 1978Responds to 780906 Ltr Re Overpressure Protection Sys. Superior Alarms Replaced Original Computer Alarm.Tech Specs Do Not Include Relief Valve Testing & Testing Requirements
ML17244A17216 October 1978Forwards Application for Amend to License DPR-18
ML17244A17818 October 1978Forwards Application for Amend to License DPR-18.Fee Paid
ML17244A18112 October 1978Forwards Application for Amend to License DPR-18,changing Tech Specs Re Dc Electrical Sys.Fee Paid
ML17244A18631 October 1978Forwards Responses to Three of Five Questions Submitted in 781006 Ltr Re Fire Protection.Addl Time Necessary to Respond to Questions 78 & 79Safe Shutdown
Fire Barrier
Emergency Lighting
ML17244A18831 October 1978Revises Schedule for Completion of Westinghouse Work Re Resolution of Upper Plenum Injection of ECCS Water Due to Resolution of Zirconium-water Inconsistency.Exxon Schedule for Work on Upper Plenun Injection Also Encl
ML17244A1891 November 1978Proposes to Perform Radiographic Exam of Reactor Coolant Pump Casing Welds During 1981 Refueling & Maint Outage, Using Portable Linac X-ray Unit from EPRI Which Should Be Available in 1980Liquid penetrant
ML17244A1903 November 1978Notifies That Provisional Oper Lic#DPR-18 Issued on 780328 Omitted Tech Specs for Piping Penetrations W/Expansion Bellows.Leakage Testing W/Air Medium Is Not Req for Containment Penetration Sys
ML17244A1918 November 1978Furnishes Addl Info Re 781004 Meeting to Discuss SEP Topic 3-5.A,High Energy Line Breaks Inside Containment.Discusses Pipe Stress Calculations,High Energy Line Break Outside Containment,Generic Task A-2 & Asymmetric LOCA Loads
ML17244A19720 November 1978Describes Fuel Inspec Plans for 1979 Shutdown.At End of Present Cycle 8,8 to 10 Exxon Fuel Assemblies Will Be Inspec Visually W/Binoculars.Shutdown & Inspec Planned for Late Feb & Early March,1979
ML17244A20116 November 1978Forwards Endorsement#57 to Liability Policy#Nelia NF-170 & Endorsement#47 to Policy#Maelu MF-47
ML17244A20630 November 1978Forwards Ginna Station Insvc Pump & Valve Test Prog for the Period 790501-801231: Append C to Facil Quality Assurance ManualSafe Shutdown
Boric Acid
ML17244A2071 December 1978Responds to 780906 NRC Request for Review of Environ Qual Table for Elec Equip at Subj Facil.Forwards Requested Info & Rev Pages for Initial 780224 Environ Qual Rept.Facil Does Not Use Connectors or Junction BoxesSafe Shutdown
ML17244A2174 December 1978Summary of 781004 Meeting Re High Energy Line Breaks Inside Containment.Addl Info Is Being Gathered on This Subj
ML17244A2194 December 1978Forwards Ref List Inadvertently Omitted from Encl of Environ Qual of Elec Equip Rev 1 Submitted 781201
ML17244A27021 December 1978Forwards Amend#8 to Appl to Convert Provisional Oper Lic to Full-Term Oper Lic,& Rev#4 to Suppl IV to Applicant'S Tech Suppl Accompanying Appl for a Full-Term Oper Lic
ML17244A29121 December 1978Ack Receipt of 781115 Ltr from NRC Providing Rge W/Rev Standard Tech Specs Re Radiological Effluents.Due to Delay in Receipt of Ltr & to Provide Time for Reviews,Rge Plans to Submit Proposed Tech Specs by 780215(sic)
ML17244A2975 December 1978Responds to NRC 781116 Ltr Re Violation Noted in Insp Rept 50-244/78-22.Corrective Actions:Formal Operating Procedures for Gamma Analyzer Sys Have Been Established
ML17244A30227 November 1978Ack Receipt of IE Bulletin 78-12 Requesting Info on Possible Atypical Weld Matl in Reactor Vessel.Requests Extension Until NRC Clarifies IE Bulletin 78-12 & Westinghouse Forwards Requested Info
ML17244A30411 December 1978Forwards IE Insp Rept 50-244/78-17 Describing Program to Upgrade the Qualification of Safety Related Splices Inside Containment.Details Withheld(Ref 10CFR2.790)
ML17244A3072 January 1979Ack Receipt of NRC 781129 Ltr Re Containment Purging During Normal Plant Operations.Plans to Justify Limiting Purging,Re Electrical Bypasses & Overrides,Will Be Completed by 790702
ML17244A3109 January 1979Forwards LER 78-009/01T-0Fire Watch
ML17244A31221 December 1978Informs That 14 References in IE Circular 78-08 Have Been Reviewed.Reference 11, Status of Monticello Electrical Splice Uprgade Relates to Splice Replacement Program in Util 781211 Ltr
ML17244A31627 December 1978Confirms 781227 Telephone Call Re LER 78-009 on 781226:the Fire Watch Established Due to Inoperable Relay & Computer Room Halon Sys Was Not Located in Unprotected Area.Caused by Personnel ErrorFire Watch
ML17244A31719 December 1978Proposed Fire Protection as Presented in SER Adequately Assures Health & Safety of Public.Exception Re Valve Supervision & Cable Protection Must Be Evaluated by Nrc.Fire Protection Milestones & Documents Are DiscussedFire Protection Program
ML17244A32919 January 1979Forwards Insurance Endorsement 2 to Binder EB-14 & Endorsement 2 to Binder XB-14
ML17244A33924 January 1979Forwards LER 79-003/03L-0
ML17244A34124 January 1979Forwards LER 79-002/03L-0
ML17244A34526 January 1979Forwards Certified Copies of Nuclear Energy Liability policies:NF-170 No 58 Establishing 1979 Advance Premium as $267,375 & MF-47 No 48 Establisheing Advance Premium as $77,625
ML17244A35325 January 1979Responds to 781221 Ltr Requesting Verification of Data Submitted by Util.Forwards Comments & Addl Info Re Isolation of Low Pressure Sys from Reactor Coolant SysSafe Shutdown
ML17244A35629 December 1978Responds to NRC 781206 Ltr Re Violation Noted in IE Insp Rept 50-244/78-24.Corrective Actions:Radiographs Removed from Cardboard Filing Boxes & Placed in Fire Rated Cabinets & Record Storage Room Added for Nonduplicate Records
ML17244A37313 February 1979Forwards Info Re Arrangement & Actuation Logic for 1C Safety Injection Pump.Reports That Logic Arrangement Meets Separation & Single Failure Criteria
ML17244A37416 February 1979Forwards Review of Safety Actuation Circuits W/Manual Override.Reset Operation Does Not Prevent Equipment from Operating,Which Is Necessary to Mitigate a Postulated Accident