ML17244A270
| ML17244A270 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 12/21/1978 |
| From: | Faron R LEBOEUF, LAMB, LEIBY & MACRAE |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17244A273 | List: |
| References | |
| NUDOCS 7812220113 | |
| Download: ML17244A270 (15) | |
Text
REGULATOR~ INFORMATION DISTRIBUTION.
TEM (BIDS)
ACCESS I
()
NBR:7812220113 DOC.DATE: 78/12/2,1 NOTA
. ED-NO FACIL:50-244 GI NNA, ROCHESTER GAS 8,
ELECTRIC CORPORATION AOTj BYNAME AUTHOR AFFI.LIATION FARO),R.S.
- LeBouf, Lamb, Leiby 8
MacRae i
RECIP.NAME RECIPIENT AFFILIATION DENTON,H. R.
'FFICE OF NUCLEAR REACTOR REGULATION DOCKET IP 05000244 COPIES LTTR ENCL 7
7 ACTION-05 BC b 8 0
I NTFRNAL:
.I BEG FILE 02 NRC PDR 14 HANAUER 16 AD SYS/PROJ 18 REAC SFTY BR 20 EEB 22 BRINKMAN I
I I
I I
I I
I I
I I
I 2
2
,.I I
.I
.I I
I I
I 15 COBE PEBF BR 17 ENGR BB 19 PLANT SYS BR 21 FFLT TRT SYS
SUBJECT:
Forwards Amend/P8 to appl to Convert Provisional Oper Lic to Full-Term Oper Lic,8, BevPP4 to Suppl IV to Applicant's ech Suppl Accompanying Appl for a Full-T~rm Oper I ic.
u+Qkad
\\-lb-+8 DISTRIBUTION CODE:
AOOIS COPIES RECEIVED:LTB J ENC ~
SIZE-TITLE: GENERAL DISTRIBUTION F()R AFTER ISSUANCE OF
()PERATING LIC 0
,NoTEs.i J CP
+LE ~~J~~d&DA'>8<~~
BFCIPIENT RECIPIENT 'OPIFS I D CODE/NAME ID CODE/NAME LTTR ENCL EXTERNAL- 03 LPDR 23 ACRS I
I
,16 16 04 NSIC I
I 0
~~
TOTAL NUMBER OF COPIES REQUIRED:
LTTR PE+
S lull 38 ENCL 38
0 Ct I II lt I
I i
0
LEON A. ALLEN,JR.
JOSEPH C, BACHCLDCR+IIC ERNEST S. BALLARD.JR.
G. S. PETER BERGEN
~
GKOFFRY D.C.BEST DAVID P. BICKS TAYLOR R. BRIGGS CHARLES N.BURGER THOMAS E.BURKE ROGER D. FCLDMAN~4 EUGENE R.FIDCLL 4
JACOB FRIKDLANOKR GKRARD QIORDANO DONALD J
~ QREKNE JAMES A. G REER.2X 4 JOHN I. QROSC 4 DOUGLAS W. HAWKS CARL 0 ~ HOBKLMAN MICHAEL IOVENKO JAMES F JOHNSON, 4>>
RONALD D. JONES LKX K ~ LARSON 4
ORANT S.LEWIS K I MBA W. LOVEJOY CAMKRON F. MACRAE 4 CAMKRON F. MACRAK.IK4 GCRARD A.MAHKR SHEILA H. MARSHALL JAMES O.MCKLROY JAM CS P. Mc DRANK R Y,JR.'4 PHILIP PAI.MER MCGUIQAN HARVEY A. NAPIKR JAMES OMALLCY,JR +
J. MICHAEL PARISH WILLIAMW. ROSCN BLATT JOHN A.RUDY PATRICK J SCOQNAMIQLIO HAROLD M. SCIDKL HALCYON 0 ~ SKINNCR JOSEPH S.STRAUSS SAMUEL M SUGDKN KUGCNK B. THOMAS,JR.
4 LEONARD M. TROSTCN HARRY H. VOIQT 4
H ~ RICHARD WACHTCL QCRARD P. WATSON THOMAS A ZIERK LC 8 WIN,WA5III NOTO N e D.C.
TCLCX: 440274 TELECOPIER:
202 457 7542 0
0 LEBOEUF, LAMB,LEIBY 8c tvIACRAE l757 N STREET,N.W.
WASHINGTON, D. C. 20036 TCLCPHOKC 202 457 7500 CABLE AOQIIC55 RANOALLJ. Lc80EUFa JR I929 l975 HORACE R. LAH8 I924 I977 ADRIAN C. LCIBY 1952 IQTB I40 BROADWAY NCW YORK, N.Y. I0005 TCLCPIIONE 2I2 289 I100 CABLE ADDRESS LKBWIN,NEW YORK TELEX; 4224IB i RKSIDCNT PARTNERS WASHINGTON OFFICE 4 ADMITTED TO THC DISTRICT OF COLUMBIA BAR December 21, 1978 Mr. Harold R. Denton Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
Rochester Gas and Electric Corporation R.
E. Ginna Nuclear Power Plant Unit No.
1 Docket No.
50-244
Dear Mr. Denton:
As counsel for Rochester Gas and Electric Cor-
- poration, we enclose the following:
(1)
Three (3) signed originals and fifteen (15) copies of Rochester Gas and Electric Corporation's Amendment No.
8 to Applica-tion to Convert Pr'ovisional Operating License to Full-Term Operating License, and (2)
Sixty (60) copies of Revision 4 to Sup-plement ZV to Applicant's Technical Sup-plement Accompanying Application for a Full-Term Operating License.
Revision 4 revises Supplement ZV, filed with the Commission on July 1,
- 1974, and revisions R(GULgORY DOCKET FILE COP'f
(
I 1
'Mr. Harold R. Denton December 21, 1978 page two to the Supplement filed August 23, 1974,;b November 1,
1974 and January 30, 1976.
These further revisions to Supplement IV reflect minor changes in the Management and Quality Assurance Organizations; re-flect clarification of responsibilities and terminology associated with design control, review of nonconformances, supplier evaluations and records process-ing; and reflect endorsement of current NRC Regulatory Guides 'associated with quality assurance ANSI standards.
A Certificate of Service showing service of these documents upon the persons listed therein is enclosed.
Very truly yours,
- LeBoeuf, Lamb, Leiby a MacRae Attorneys for Rochester Gas and Electric Corporation
C"
BEFORE THE UNITED STATES In the Matter of Docket No. 50-244 ROCHESTER GAS AND ELECTRIC CORPORATION (R.
E. Ginna Nuclear Power Plant, Unit No.
1 NUCLEAR REGULATORY COMMISSION
)
)
)
)
)
)
CERTIFICATE OF SERVICE I hereby certify that I have served a document entitled "Amendment No.
8 to Convert Provisional Operating License to Full-Term Operating License" with Revision 4 to Supplement IV to Technical Supplement Accompanying. Application for a Full-Term Operating License, attached
- thereto, by mailing copies thereof first class, postage pre-paid, to each of the following persons this 20th day of December, 1978.
Mr. Michael L. Slade 1250 Crown Point Drive
- Webster, New York 14580 Warran B. Rosenbaum, Esquire One Main Street 707 Wilder Building Rochester, New York 14614 Edward G. Ketchen, Esquire Office of the Executive Legal Director U.S. Nuclear Regulatory Commis sion Washington, D.C.
20555
Mr. Robert N. Pinkney Supervisor Town of Ontario 107 Ridge Road West
- Ontario, New York 14519 Jeffrey L. Cohen, Esquire New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza
- Albany, New York 12223 Edward Luton, Esquire Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Dr. Emmeth A. Luebke Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Dr. Dixon Callihan Union Carbide Corporation P.
O.
Box 7 Oak Ridge, Tennessee 3783 Robert S.
Faron
- LeBoeuf, Lamb, Leiby G MacRae Attorneys for Rochester Gas G Electric Corporation
o C
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
ROCHESTER GAS AND ELECTRIC
)
CORPORATION (R. E. Ginna
)
Nuclear Power Plant
)
Unit No.
1)
)
Docket No. 50-244 AMENDMENT NO.
8 TO APPLICATION TO CONVERT PROVISIONAL OPERATING LICENSE TO FULL-TERM OPERATING LICENSE Rochester Gas and Electric Corporation, Applicant in the above-captioned proceeding, hereby files Amendment No.
8 to its Application to Convert Provisional Operating License to Full-Term Operating License.
This amendment transmits Revi-sion 4 to Supplement XV to Applicant's Technical Supplement Accompanying Application for a Full-Term Operating License.
Revision 4 further revises Supplement IV, filed with the Commission on July 1, 1974 and revisions to the Supplement, filed August 23,
- 1974, November 1,
1974 and January 30,
- 1976, respectively.
These further revisions to Supplement IV reflect minor changes in the Ginna Station, Management and Quality Assurance Organizations, clarification of responsi-bilities and terminology associated with design control, review of nonconformances, supplier evaluations, and records processing; and endorsement of current NRC Regulatory Guides associated with quality assurance ANSX standards.
WHEREFORE, Applicant prays as in its original application.
ROCHESTER GAS AND ELECTRIC CORPORATION Leon D. White, r.
Vice President Electric and Steam Production Subscribed and sworn to before me this gP4 day of December, 1978.
otar Publi GARY L. REISS NOTARY PUBLIC, Stale oi N. Y. Monroe Co.
My Commission Expires March 30, 19'
I V
'a
\\];,
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of ROCHESTER GAS AND ELECTRIC CORPORATION (R. E. Ginna Nuclear Power Plant Unit No.
1)
Docket No.
50-244 AMENDMENT NO.
8 TO APPLICATION TO CONVERT PROVISIONAL OPERATING LICENSE TO FULL-TERM OPERATING LICENSE Rochester Gas and Electric Corporation, Applicant in the
'bove-captioned proceeding, hereby files Amendment No.
8 to its Application to Convert Provisional Operating License to Full-Term Operating License.
This amendment transmits Revi-sion 4 to Supplement IV to Applicant's Technical Supplement Accompanying Application for a Full-Term Operating License.
Revision 4 further revises Supplement IV, filed with the Commission on July 1, 1974 and revisions to the Supplement, filed August 23,
- 1974, November 1,
1974 and January 30,
- 1976, respectively.
These further revisions to Supplement IV reflect minor changes in the Ginna Station, Management and Quality Assurance Organizations, clarification of responsi-bilities and terminology associated with design control, review of nonconformances, supplier evaluations, and records
-processing; and endorsement of current NRC Regulatory Guides associated with quality assurance ANSI standards.
I WHEREFORE, Applicant prays as in its original application.
ROCHESTER GAS AND ELECTRXC CORPORATXON Leon D. White, r.
Vice President Electric and Steam Production Subscribed and sworn to before me this gH4 day of December, 1978.
otar Publi GARY L. REISS NOTARY PUBf.lC, Stale of N. Y. thonroo Co.
tAy Commfssfon Expires March 3D, 19'
1 I/