MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated IR 05000244/19990081999-10-14014 October 1999 Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs IR 05000244/19992011999-09-24024 September 1999 Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date ML17265A5111999-01-11011 January 1999 Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME Bp&V Code for ISI Program.Relief Requests 37,38 & 39 Encl ML17265A5101999-01-11011 January 1999 Requests Relief Per to 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 40 Encl 1999-09-30
[Table view] Category:RESEARCH INSTITUTION/LABORATORY TO NRC
MONTHYEARML17261A8541989-01-13013 January 1989 Discusses 890110-11 Meetings Re Nozzle Sizing Study.Most Accurate Sizing Obtained by Collecting Data of Edge Diffracted Waves from Geometric Extremities of Flaw ML20212N6571986-08-19019 August 1986 Forwards EGG-PHY-7350, Technical Evaluation Rept for Proposed Change to Operation of Ginna Fuel Pool Charcoal Filter Sys, Per FIN D-6023, Review of Plant-Specific Licensing Actions for Operating Reactor Issues, Task 4-5 ML17251A7281986-06-0404 June 1986 Forwards Inel EGG-NTA-7266, Assessment of Removal of Raised Floor & Mod to Fire Detection Zones for Plant Process Computer Sys (PPCS) Computer Room at Ginna Plant, Final Informal Rept Per Task 4-1, Review of Plant-Specific.... ML19306A0151984-02-10010 February 1984 Summarizes 840206-07 Visit to Nevada Test Site Hydrogen Burn Facility to Inspect Condition of Equipment & Cable/Splice Samples After Series of Hydrogen Burn Tests Conducted by Epri.No Indication of External Damage to Equipment Noted ML17256B1011982-06-21021 June 1982 Comments on NUREG-0821, Integrated Plant Safety Assessment, SEP Re Ginna Nuclear Power Plant. Document Is Comprehensive W/Respect to Arguments Leading to Resolution of Various SEP Topics ML20063C5531982-06-14014 June 1982 Compares Format & Positions of Facilities for Integrity Plant Safety Assessments Per SEP Objectives.Wind & Tornado Loadings Need Improvement.Pipe Break Outside Containment Requires Clarification ML20065A7311982-03-23023 March 1982 Informs That Info Submitted by Licensee in Response to NUREG-0737,Item III.D.3.4, Control Room Habitability Acceptable ML17258A5181981-10-30030 October 1981 Forwards Progress Rept Re Open Items for Unit.Remaining Item Is Primary Coolant Pump Casing ML17258A1941981-09-30030 September 1981 Forwards Rept Addressing Resolution of Open Items in Mechanical Electrical Equipment SEP Re Seismic Integrity,Per 810909 Meeting ML17258A5201981-09-11011 September 1981 Forwards Info Re Seismic Capacity of Reactor Coolant Pump. Action Proposed to Close Item ML19345D6991980-11-24024 November 1980 Submits Monthly Mgt Ltr 8 for Oct 1980 Re Containment Analysis Support for Sep. ML17250A7611980-06-16016 June 1980 Discusses Completed mini-review of Util Safe Shutdown Analysis.Impossible to Confirm Safe Shutdown During or After Fire.Suggests NRC Require Installation of More Conservative Shutdown Sys ML17261A1701980-01-31031 January 1980 Forwards Input to Fire Protection Design Review & Supplemental Items.Items 3.1.24,24 & 43 Remain Open Due to Lack of Info from Licensee ML17249A8831980-01-23023 January 1980 Recommends That Licensee Proposal on Fire Protection Review Item 3.2.6 Re Backflow Protection Be Accepted Subj to Review of Four Listed Documents.Also Recommends That Fire Brigade Size Be Increased to Five Men ML17261A1691980-01-23023 January 1980 Discusses Util Fire Protection Review Items 3.2.6 & 3.2.9. Recommends Accepting Backflow Protection Proposal Pending Submittal of Prints of Drain Sys & Problem Drain Location. Five-man Fire Brigade Size Acceptable ML17249A2391979-10-30030 October 1979 Informs of Util 790525 Agreement to Increase 3-man Fire Brigade to Five Men as Recommended in J Townley 780710 Rept & Justified in 790214 Safety Evaluation.Item Now Deemed Acceptable & Closed ML17244A3171978-12-19019 December 1978 Proposed Fire Protection as Presented in SER Adequately Assures Health & Safety of Public.Exception Re Valve Supervision & Cable Protection Must Be Evaluated by Nrc.Fire Protection Milestones & Documents Are Discussed 1989-01-13
[Table view] |
Text
Q ~ BEOULATOFiPINFOBMATION DISTBIBUTION cSTEM (BIDS>
ACCFS/IOH HBB: 7901190099 DOC.DATE: 78/12/-1 9 NOTARI ZFD: NO DOCKET 0 FACIL:50-244 GINNA ROCHFSTEB GAS 8, ELECTRIC CORPORATION 05000244 AUTH. NAME AUTHOR AFFILIATION HALL,B. F.. BNL Brookhaven Nat'l Lab.
0 BECIP.NAME FERGUSON, R.L.
RECIPIENT AFFILIATION
SUBJECT:
Proposed fire protection as presented in SFR,adequately assures health 8, safety of public. Exception re valve g<<pervision 8, cable protection must he evaluated by NRC.Fire protection milestones 8, documents're discussed.
DISTBI BUTION CODE: A006S COP IFS BFCEIVED:LTB Q ENCL 4 SIZF.:
NOTES: /P ~ ~~+
TITLE~ FIRE PROTECTION INFORMATION (AFTFR ISSUANCE OF OP.LIC RECIPIENT COPIES Qo ~~
REC I P I 1=.NT COP I FS
~ )
ID CODF/NAME LTTR ENCL ID CODE/NAME LTTB ENCL ACTION- 05 BC e@~Z.
INTERNAL: O.l 02 NRC PDR 0 09 .2 1
1 1 HANAUER 12 AUXIL SYS BR 2 14 PLANT S YS 8 B 19 It'1 AM BACH 1 20 MURANAKA,B 21 AD SYS/PROJ OELD EXTERNAL- 03 LPDB 04 NSI C 0 22 ACRS
'0 TOTAL NUMBER OF COPIFS RFQU IRED: LTTB 38 ENCL 37
~
e' I
BROOKHAVEN NATIONAL LABORATORY ASSOCIATED UNIVERSITIES, INC.
s Upton. New York 11973 Department of Nuclear Energy (516) 345- 2362 December 19, 1978 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. Robert t. FergosonRE6LJLATCig'Y Pjgg)'(LT f-jig (OP'f Plant Systems Branch
Dear Bob:
Subject:
Fire Protection in 0 eratin Nuclear Power Stations Robert E. Ginna Unit 1 Safet Evaluation Re ort Review The Safety Evaluation Report, as developed jointly by the NRC staff and Brookhaven National Laboratory, (BNL), adequately reflects the concerns and recommendations of the consultants. Throughout the reevaluation of Ginna - 1, there has been general agreement between the NRC staff and the BNL consultants.
Based on present data, the proposed fire protection, as set forth in the SER, will give reasonable assurance that the health and safety of the public is not endangered. The following exception represents a differing engineering point of view that should be evaluated by the NRC staff.
Valve Su ervision SER item 4.3.1.3 indicate'hat electrical supervision is provided for valves controlling waterflow into sprinkler systems, but that sectional valves on the interior loop fire main and valves controlling fire pump discharge are only locked open. Electrical valve supervision should be provided on all valves controlling fire water systems and sectionalizing valves. The present proposal of incorporating administrative controls and locks is unacceptable.
See letter dated July 13, 1977 to Nr. R.L. Ferguson from Nr. R.E. Hall.
Cable Protection SER item 5.5.6 indicates that the licensee will install manually actuated water spray systems to protect grouped=c'ables in the northern part of elevation 253'f the intermediate building. By providing several water spray systems, the licensee apparently intends to provide the capability to suppress a fire i n a section of the grouped cables here without discharging an excessive amount of water in the room.
IISo pe
t l
\ J I
l 1
1 p p'I
Unless there is a detection system arranged to indicate the portion of the cables at which the fire is located, a person will have to enter the area to determine which suppression system to actuate. An established fire in this area is likely to be very smoky, which will make it difficult to visually find the seat of the fire. Having then to choose at random from several systems, each protecting a different portion of the cables, the wrong system might be turned on. guite possibly all systems would be turned on, since this would be a sure way of actuating the correct system. Manually actuated systems might not be turned on soon enough to be of value. Automatically actuated systems would discharge water as soon as needed and only where necessary.
In addition, the SER should make it clear that the grouped cables referred to in this section include those in conduit as well as in tray. The reason for this is to make sure that the conduits containing the two main steam pressure transmitters (where separation is now inadequate) are covered in the water spray system.
The preceding statements are based on a detailed reevaluation of the fire protection program as implemented by the Rochester Gas and Electric Corporation at the Ginna-1 Nuclear Power Station. The analysis covered a review of the fire prevention, detection and suppression capabilities of the Ginna-1 unit as interfaced with the nuclear systems requirements. This was accomplished by utilizing a review team concept with members from Brookhaven National Laboratory (BNL) and the Nuclear Regulatory Commission Division of Operating Reactors staff.
The fire protection evaluation for the Ginna-1 Plant is based on an analy-sis of documents submitted by the Rochester Gas and Electric Corporation to the Nuclear Regulatory Commission and a site visit. The site visit was con-ducted by Mr. T. Lee and Mr. M. Virgillio of the NRC; Mr. E. MacDougall of BNL; Mr. J. Kievan of Rolf Jensen and Associates, Inc., under contract to Brookhaven National Laboratory; and Mr. J. Townley consultant to BNL. Mr. Townley was un-der contract to BNL to review the manual fire fighting capabilities of the sta-tion along with administrative controls.
Milestone Dates
- l. On February 24, 1977, Rochester Gas and Electric Corporation provided a fire hazards analysis submittal responding to NRC requests of May ll and September 28, 1976. This was received at NRC on March 2, 1977.
- 2. By letter of May 3, 1978, Rochester Gas and Electric Corporation was provided with NRC requests for additional information and staff posi-tions pertaining to fire protection at the Robert E. Ginna, Unit j.
facility.
- 3. On June 9, j.978, Rochester Gas and Electric Corporation provided a submittal responding to NRC requests for additional information'and staff positions of May 3,'978.
- 4. On June 27-30, 1978, the DOR fire protection review team visited the Robert E. Ginna, Unit 3. facility.
I lF fi
'I ~
~
t ~ 1 te f
'l 1 4
t
> ~, ~
h P
'I
- 5. On June 30, 1978 during the meeting at the plant, the review team identified additional staff positions and requested Rochester Gas and Electric Corporation to indicate their commitment to these positions.
- 6. By letter of September 1, 1978, Rochester Gas and Electric Corporation agreed to adopt a number of the staff positions.
- 7. By letter of September 1, 1978, Rochester Gas and Electric Corporation agreed to adopt many more staff positions and prov'ided a detailed information pertaining to the pressure wall protecting the control room from the hazards in the turbine building.
- 8. On October 18, 1978, Rochester Gas and Electric Corporation submitted the design details of the fire doors separating the control room and the relay room from the turbine building.
- 9. On December 6, 1978, the draft Safety Evaluation Report was transmitted from Plant Systems Branch to the Acting Assistant Director for Systems and Projects.
Review Documents The following documents were used in the Robert E. Ginna Nuclear Power Plant, Unit 1 Fire Protection Reevaluation:
- 1. NRC Branch Technical Position APCSB 9.5-1, Appendix A, dated August 23, 1976.
- 2. Robert E. Ginna Nuclear Power Plant, Unit 1, Fire Protection Evalua-tion, dated February 24, 1977.
- 3. Rochester Gas and Electric Corporation responses of June 9, September 1, September 22, and October 18, 1978, to NRC positions and requests for additional information.
- 4. Various engineering drawings provided by Rochester Gas and Electric Corporation.
- 5. December 6, 1978 draft Safety Evaluation Report.
The Ginna Unit 1 review has been conducted under the direction of Mr. E.A.
MacDougall and myself of Reactor Engineering Analysis Group at BNL.
We have reviewed the analyses submitted by the licensee and have visited the facility to examine the relationship of safety-related components, systems and structures with both combustibles and the associated fire detection and suppression systems. Our review has been limited to the aspects of fire protection related to the protection of the public from the standpoint of radiological health and safety. We have not considered aspects of fire pro-tection associated with life safety of onsite personnel and with property
protection, unless they impact the health and safety of the public due to the release of radioactive material. The proposed modifications represent a significant increase in the level of protection against serious fire associated hazards.
Robert E. Hall, Group Leader Reactor Engineering Analysis REH:EAM:sd
DISTRIBUTION N. Antonetti I. Asp V. Benaroya E. Blackwood W. Butler R. Cerbone D. Eisenhut R. Feit R. Ferguson R. Hall S. Hanauer P. Herman E. Imbro W. Kato J . Kievan G. Lainas C. Long E. NacDougall J. Riopelle V. Stello T. Telford H. Todosow J. Townley PDR