REGULATORY ORMATION DISTRXBUTION SY- M DOCKET NBR: 50 244 DOC DATE:

RECIPIENT: Ziemann D.L. NOROSR2 ACCESSION NBR: 7 2 ORXGINATOR- White L.D. EUTRGE COPIES RECEIVED:

Rochester Gas 6 Elec,R.E. Ginna -=1 LTR 1 .ENCL

SUBJECT:

SIZE: 1 Requests 60 days deferral in response to 780711 ltr requesting proposed Tech Specs to implement Append I to 10CFR50. Addi time required due to implementing improvements in Health Physics Prog.

DISTRT RUT ION CODE l A000 DISTR T HUT ION TITLE) 4>PENDIX I DISTRIBUTION AFTFR ISSuA~CE OF OL E~CL2 FOR ACTION BR W/7 ENCL Gr ime Moore KG FT H/ENCL ORB%2 BC EPBS2 BC PAR W/ENCL J. S ea D. Scaletti I 5 E w/2 ENCL ORB52 LA EPB52 LA OKLD LTP ONLY HANAUFR LTR ON[ Y PLANT SYSTEMS HP b/ENCL EEB w/ENCL DIRECTOR DSF. LTR ONLY ENYIRfl SPEC BR w/ENCL AD FOA SITE TECH w/K~CL HYDRO METEOR 9R W/ENCL HARKEK w/ENCL

. EFFLurNT TREAT SYS ~/2 ENCL RAD ASRKSSHKNT RR w/ENCL PHIL w4GNKR w/ENCL LPOR w/ENCL TERA W/ENCL NSIC w/ENCL ACRS w/lt ENCL TOTA[ NU>HER OF COPIES REQUIRED )

LTR 43 KNCL 40 NOTES:

ill~

+sip 4 I ~ AO ROCHESTER GAS AND ELECTRIC CORPORATIOH o 89 EAST AVEHUE, ROCHESTER, N.Y. 14649 LEON O. WHITE. JII. CCLCWVO<C VICE FCCSIOCNC ARCA cooc . io 5 J6 2700 October 10, 1978 Director of Nuclear Reactor Regulation Attention: Mr. Dennis L. Ziemann, Chief Operating Reactors Branch No. 2 U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Appendix I Technical Specifications R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Ziemann:

This letter is in response to your letter dated July 11, 1978 which requested that we submit proposed Technical Specifications to implement Appendix I to 10 CFR Part 50 by November 8, 1978. Based on our progress to date it is apparent that we will require additional time to complete our response.

This is due in part to the fact that we are in the process of implementing a number of improvements in our health physics program at Ginna Station which is utilizing most of the time of the people who would otherwise be working on this project. A contributing factor has been the need to address a number ofThese questions concerning the sample Technical Specifications.

questions were included in those submitted by letter from Mr.

Carl Walski, Atomic Industrial Forum, to Mr. Harold Denton, USNRC, dated August 16, 1978. In addition, based on a utility working group's discussions with members of the NRC Staff, we understand that revised guidance on Technical Specification contents is forthcoming in the near future. Therefore, it this seems reasonable to defer our submittal until the results of revision can be incorporated into our program. As a'result, we request that the date for our submittal be deferred 60 days.

Very truly yours, L. D. Whit , Jr.