ML17223A875

From kanterella
Revision as of 16:29, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor
ML17223A875
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/09/1990
From: GOLDBERG J H
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-291, NUDOCS 9008140504
Download: ML17223A875 (5)


See also: IR 05000335/1990014

Text

(ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEMI~~'REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM(R1DS)ACCESSION

NBR:9008140504

DOC.DATE:

90/08/09NOTARIZED:

NOFACIL:50-335

St.LuciePlant,Unit1,FloridaPower6LightCo.AUTH.NAMEAUTHORAFFILIATION

GOLDBERG,J.H.

FloridaPower&Light,Co.RECIP.NAME

RECIPIENT

AFFIL1ATION

DocumentControlBranch(Document

ControlDesk)SUBJECT:Respondstoviolations

notedinInspRept50-335/90-14.

DISTRIBUTION

CODE:IEOIDCOPIESRECEIVED:LTR

iENCLjSIZE:TITLE:General(50Dkt)-Insp

Rept/Notice

ofVioTation

ResponseNOTES:DOCKET,05000335

DRECIPIENT

IDCODE/NAME

PD2-2PDINTERNAL:

ACRSAEOD/DEIIB

DEDRONRRSHANKMAN,S

NRR/DOEADIR11NRR/DRIS/DIR

.NRR/PMAS/ILRB12

OE.DEXTERNAL:

LPDRNSICCOPIESLTTRENCL11221111111.111'111111111RECIPIENT

IDCODE/NAME

NORRIS,JAEODAEOD/TPAD

NRRMORISSEAU,D

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9DNRR/DST/DIR

8E2NUDOCS-ABSTRACT

OGC/HDS2RGN2FILE01NRCPDRCOPIESLTTRENCL11111111111111111111ADDSDNOTETOALL"RIDS"RECIPIENTS:

DDPLEASEHELPUSTOREDUCEO'ASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOiiIPl-37(EXT.20079)TOELIMINATE

YOURNAMEFROiv!DISTRIBUTIOiV

LISTSFORDOCUi>IENTS

YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:

LTTR24ENCL24

PO.Box14000,Juno

Beach,FL334080420AUGUST.91990L-90-29110CFR2.201U.S.NuclearRegulatory

Commission

Attn:DocumentControlDeskWashington,

D.C.20555Gentlemen:

Re:St.LucieUnit1DocketNos.50-335ResponsetoNoticeofViolation

InsectionReort90-14FloridaPowerandLightCompanyhasreviewedthesubjectinspection

reportandpursuantto10CFR2.201theresponseisattached.

Verytrulyyours,":.bWX~~:~J;H.GoldbergPresident

-NuclearDivisionJHG/GRMAttachment

Acc:StewartD.Ebneter,RegionalAdministrator,

USNRCRegionIISeniorResidentInspector,

USNRC,St.LuciePlant900-:;,40.".;Ot'C>r>80a>

F'1:<AZ>GCc,'-

C~i>j>.".:;:

>-D>".anFPLGrov>>compacv+/

Re:St.LucieUnits1DocketNos.50-335ResponsetoNoticeofViolation

InsectionReort90-14FINDING:.Unit1Technical

Specification

(TS)6.8.1.arequiresthatwrittenprocedures

shallbeestablished,

implemented

andmaintained

coveringtheactivities

recommended

inAppendixAofRegulatory

Guide1.33,Revision2,February1978.AppendixA,paragraph

1.d,includesprocedures

addressing

procedure

adherence

andtemporary

changemethod.Procedure

QI5-PR/PSL-l,

Rev37,Preparation,

Revision,

Review/Approval

ofProcedures,

section5.5,implemented

TS6.8.1andrequiredthatprocedures

bestrictlyadheredto.Italsoprovidedthemethodtoobtainapprovedtemporary

procedure

changesand,ifappropriate,

subsequent

permanent

changes.Procedure

OP-1-0120051,

Rev10,RCSFlowDetermination

byCalorimetric

Procedure,

steps8.3through8.6,directedcertainactionsequences

involving

coordination

withtheReactorControlOperatoratthecontrolboard,controlboardlooptemperature

meterfunctionselection

usingswitches,

andconfirmation

thatmeasurements

werebeingmade=onlyonchannelsthathadthemeterswitchedoutandisolated.

Cont'rary

totheabove,onMay14,1990,Duringtheperformance

ofprocedure

OP1-0120051,

thelicensee's

staffdidnotfollowinstruction

steps8.3through8.6Thetestpersonsinsteadutilizedanunapproved

methodtoisolateallthemeterstosimultaneously

isolatetheinvolvedlooptemperature

metersandcompletethedatacollection

without.thedescribed

coordination.

RESPONSE:

2~3~FloridaPowerandLightCompanyconcurswiththeviolation.

Thereasonfortheviolation

wasfailuretofollowQI5-PR/PSL-1.

Testpersonnel

failedtoprocessaProcedure

ChangeRequest(PCR)priorto,implementing

animprovedmethodofcollecting

thetemperature

data.TheReactorCoolantSystemflowdetermination

bycalorimetric

.procedure

wasrepeatedwiththeindividual's

supervisor

observing.

4,Thefollowing

actionshavebeenimplemented

toavoidfurtherviolations:

a.Theindividual

wascounselled

byhissupervisor.'.

APCRwassubmitted

toclarifyandauthorize

the'improved

methodofdatacollection.

Re:St.LucieUnits1DocketNos.50-335ResponsetoNoticeofViolation

InsectionReort90-14c.Allindividuals

intheTestGroupwereremindedoftheimportance

offollowing

procedures

andtheneedforprocessing

aPCRand/oraTemporary

Change(TC)followedbyaPCRpriortoimplementation

ofthechange.5.Allthecorrective

actionswerecompleted

byAugust1,1990.